Finance Committee - Agenda - 1/15/2020 - P77

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P77

December 10, 2019

Page 14

Senior Project Manager $195/Hour
Project Manager $165/Hour
Project Specialist $200/Hour

Senior Engineer/Field Engineer $190/Hour
Project Engineer/Field Engineer $165/Hour
Engineer $160/Hour
Junior Engineer $105/Hour
Senior Designer/Technician $145/Hour
Project Designer/Technician $135/Hour

Finance Committee - Agenda - 1/15/2020 - P76

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P76

December 10, 2019

Page 13

Project Architect $190/Hour
Senior Designer $165/Hour
Designer $145/Hour
Clerical/Office $120/Hour
Construction Administrator $190/Hour

Hourly Rates for Hoyle, Tanner and Associates are as follows:

Finance Committee - Agenda - 1/15/2020 - P75

By dnadmin on Mon, 11/07/2022 - 13:34
  • Read more about Finance Committee - Agenda - 1/15/2020 - P75

eaemtsehosais ime.

December 10, 2019

Page 12

vendor of choice who will produce all documents required and coordinate the

installation.

The Supplemental Services fees are noted below and are $58,682 (Fifty-eight
thousand six hundred eighty two dollars). Reimbursable expenses are included in

those totals.

The fees are broken down in the following chart:

Finance Committee - Agenda - 1/15/2020 - P74

By dnadmin on Mon, 11/07/2022 - 13:33
  • Read more about Finance Committee - Agenda - 1/15/2020 - P74

December 10, 2019
Page 11

Supplemental Services Fees:

The following Supplemental Services fees are provided for your consideration.
These services are usually provided outside of a base fee but have been included
due to limitations of fee available.

Supplemental Services include design by team members noted and coordination
and mark-up by HKT:

HKT Architects Inc: Architecture
Hoyle, Tanner & Associates, Inc. Civil/Site Engineering
WV Engineering Associates, PA. Mechanical Engineering

Finance Committee - Agenda - 1/15/2020 - P73

By dnadmin on Mon, 11/07/2022 - 13:33
  • Read more about Finance Committee - Agenda - 1/15/2020 - P73

December 10, 2019

Finance Committee - Agenda - 1/15/2020 - P72

By dnadmin on Mon, 11/07/2022 - 13:33
  • Read more about Finance Committee - Agenda - 1/15/2020 - P72

December 10, 2019
Page 9

2. The design team shall track Submittals, Requests for Information,
Proposed Change Orders, Change Orders, Sketches, Architect's
Supplemental Instructions and Proposal Requests in logs.

3. Review and process submittals and RFI’s per general contract
requirements.

4. Attend job meetings as required to continue the progress of the project.
The CM will write and distribute meeting minutes. HKT will write Field
Reports for distribution.

Finance Committee - Agenda - 1/15/2020 - P71

By dnadmin on Mon, 11/07/2022 - 13:33
  • Read more about Finance Committee - Agenda - 1/15/2020 - P71

December 10, 2019
Page 8

a. Mechanical design for the fire protection system will include
sprinkler entrance and main layout, along with a performance
specification for final hydraulic design by the sprinkler
subcontractor.

7. Specifications: Update full specifications. Finalize and coordinate with
Owner’s Division 0 documents.

Finance Committee - Agenda - 1/15/2020 - P70

By dnadmin on Mon, 11/07/2022 - 13:33
  • Read more about Finance Committee - Agenda - 1/15/2020 - P70

a@robitects ima.

December 10, 2019
Page 7

once during the CD phase and once prior to bidding. Work will be continued during
City review so that the schedule can be met.

The principal elements and deliverables for this phase include the following:

1. Complete all documents required for bid

2. Architectural: Develop detailed and well-coordinated construction drawings
and specifications that meet the demands of public bidding.

3. Civil/Site: Plans and Technical Specifications

Finance Committee - Agenda - 1/15/2020 - P69

By dnadmin on Mon, 11/07/2022 - 13:33
  • Read more about Finance Committee - Agenda - 1/15/2020 - P69

December 10, 2019
Page 6

move forward with using the existing conditions provided by the
Project Team.

b. Site Design: Based on Schematic Design review, prepare detailed
site plans. Documents will show proposed buildings and existing
conditions, proposed parking areas, site improvements, proposed
pedestrian and vehicle circulation with required parking
arrangements, stormwater collection and permanent treatment
facilities, and utility service connections.

Finance Committee - Agenda - 1/15/2020 - P68

By dnadmin on Mon, 11/07/2022 - 13:33
  • Read more about Finance Committee - Agenda - 1/15/2020 - P68

BS
arobiteacts ine.

December 10, 2019

Page 5

6.

9.
10.

a. Coordinate with City Geotechnical Consultant to evaluate the
subsurface soil conditions and presumptive bearing capacity, and
determine parameters necessary for foundation design.

b. identify delegated-design and deferred-submittal structural
elements and systems such as bar joists and connection detailing.