Finance Committee - Agenda - 1/15/2020 - P70

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
70
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

a@robitects ima.

December 10, 2019
Page 7

once during the CD phase and once prior to bidding. Work will be continued during
City review so that the schedule can be met.

The principal elements and deliverables for this phase include the following:

1. Complete all documents required for bid

2. Architectural: Develop detailed and well-coordinated construction drawings
and specifications that meet the demands of public bidding.

3. Civil/Site: Plans and Technical Specifications

a. Finalize all designs and calculations and revise the plans based on
final comments received.

b. Prepare site construction documents and civil technical
specifications suitable for bidding.

4, Landscape Architecture: Ironwood will advance a detailed plan set and
associated technical specifications. Prepared final landscape construction
drawings will set minimum construction quality standards. Construction
drawings and details will include landscape layout and materials plan,
planting plan, construction details, sections and notes. Technical
specifications will be completed.

5. Structural:

a. Final geotechnical coordination.

b. Finalize preparation of structural calculations.

c. Review the effect of secondary and/or non-structural elements not
included in the primary structural system, but which are attached
thereto, and design the structure to accept and support such
items.

d. Perform design checks and coordination of the Structural
Documents.

e. Final coordination of typical architectural wall sections with
structural sections.

f. Final coordination of typical MEP systems with structural systems,
including the elevator system.

g. Finalize structural drawings for construction.

h. Specify applicable information for delegated-design items and
deferred submittals:

i. Types of elements, pasitions within the structure, and
conceptual connection to the Primary Structural System.
ii. Structural criteria for design of structural elements.

i. Prepare full technical specifications.

j. Prepare a Structural Schedule of Special! Inspections for elements
of the Primary Structural System designed by Hoyle, Tanner.

i. Assist Architectural and MEP disciplines in identifying
items which require an Architectural or MEP Statement of
Special Inspections, when requested.

k. Prepare Preliminary Construction Affidavit forms for the structural
elements of the project.

6. Mechanical, Electrical, Plumbing, Fire Protection Engineering and
Telecommunications Pathways: Prepare construction drawings and
specifications with final sizing, placement of equipment, and distribution.
Prepare Construction Affidavits and ComCheck documents if required for
permitting.