Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 1/15/2020 - P69

Finance Committee - Agenda - 1/15/2020 - P69

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
69
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

December 10, 2019
Page 6

move forward with using the existing conditions provided by the
Project Team.

b. Site Design: Based on Schematic Design review, prepare detailed
site plans. Documents will show proposed buildings and existing
conditions, proposed parking areas, site improvements, proposed
pedestrian and vehicle circulation with required parking
arrangements, stormwater collection and permanent treatment
facilities, and utility service connections.

c. Drainage Study: Analyze the existing pre-development and post-
development stormwater runoff calculations and determine the
potential capacity and adequacy of the receiving system. Design
stormwater treatment, infiltration chamber system, and infiltration
and peak flowrate control devices. Prepare a drainage study to be
submitted to the City of Nashua.

d. Utility Design & Layout: New service connections will be shown on
the plans in coordination with the MEP plans.

e. Plan Submissions: Nashua Planning Board submission and
courtesy presentation of final site plans.

3. Landscape Architecture: A clear and coordinated site and landscape
design will be refined, construction feasibility and sequencing will be
vetted, opportunities for cost savings will be examined, and accurate scale
drawings illustrating the project and associated construction details will be
delivered. Phase | landscape plan will be advanced incorporating feedback
received from the City and Consultant Team.

4. Structural:

a. Prepare preliminary structural design calculations for typical
elements and the lateral force resisting system:

i. Gravity and lateral force resisting system and types,
locations and typical details
ii. Foundation types, locations and typical details

b. Preliminary coordination of typical architectural wall sections with
structural sections.

c. Preliminary coordination of typical MEP systems with structural
systems, including the elevator system.

d. Prepare preliminary structural drawings for proposed spread
footing foundation and structural elements of the building.

5. Mechanical, Electrical, Plumbing, Fire Protection Engineering and
Telecommunications Pathways: Prepare preliminary drawings and
specifications, incorporating schematic review comments.

6. Specifications: Drafts of full specifications will be completed.

7. Building and Life Safety Code Review: Review design development
drawings in accordance with the Building Code of Record. Provide plan
review comments to address any code compliance concerns. Update the
code report.

8. Cost Estimating: Not included.

9. Project Schedule: The project schedule will be updated.

10. Presentations to the CoN are included.

11. Owner approval of Design Development: Any and all changes to the plans
will be completed during this phase.

Construction Documents Phase: This phase creates the bid ready construction
documents. A set of plans and specifications will be provided to the City for review

we 5 SS ‘Oe