Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 5/3/2016 - P161

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P161

PSI and minimum % elongation @ break of 140%.

IPEMA Certification: Manufacturer must provide proof of certification. “In the interest of
public playground safety, IPEMA provides an independent laboratory which validates a
manufacturer's certification of conformance to ASTM F1292-04. A list of current validated
products, their thickness and critical heights may be viewed at www.ipema.org.”

Submittal Details:

Finance Committee - Agenda - 5/3/2016 - P160

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P160

Poured in Place
Product Specification

PART 1 - GENERAL

Work Details:

This work includes furnishing and installing GT Impax recycled poured rubber surfacing.

Finance Committee - Agenda - 5/3/2016 - P159

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P159

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

3.03

3.04

Surface Preparation: Using a brush or short nap roller, aoply primer to the substrate
perimeter and any adjacent vertical barriers (such as playground equipment) at the rate
of 300 ft2/gal.

INSTALLATION

Finance Committee - Agenda - 5/3/2016 - P158

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P158

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

1.08

WARRANTY

Playground surface shall maintain required impact attenuation characteristics and be
guaranteed against defects in workmanship and materials for a period of no less than five
years from date of completion of work. Maintenance requirements must be maintained
for duration of warranty period.

PART 2 — Products

A.

2.01

2.02

Finance Committee - Agenda - 5/3/2016 - P157

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P157

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

oO
Ow

T~TA™M™OANBPer

1.04

w

1.05

1.06

1.07

ASTM D2047 Standard Test Method for Static Coefficient of Friction of Polish-Coated
Floor Surfaces as Measured by the James Machine.

ASTM D2859 Standard Test Method for Flammability of Finished Textile Floor Covering
Materials.

Finance Committee - Agenda - 5/3/2016 - P156

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P156

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘E’ — PROTECTIVE SURFACING (POURED-IN PLACE RUBBER)

A. SCOPE

This work shall consist of installation of a protective surface material at the location(s) shown
on the layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P155

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P155

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘D’ — ELEMENT FOOTING (SIZE VARIES)
A. SCOPE

This work shall consist of installing and providing footings following the detail sheet of the plan
set provided or as ordered by the Engineer. This work may require coordination with a
community build day. See Item H for element type and specifications.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P154

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P154

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘C’ —- LOAM AND SEED (4" DEPTH)
A. SCOPE

This work shall consist of installation of loam and seed at the location(s) shown on the layout
plan or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The loam shall be a minimum of 4” in depth.

C. MEASUREMENT AND PAYMENT

Finance Committee - Agenda - 5/3/2016 - P153

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P153

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘B’ — STONE DUST PATHWAY (4” DEPTH)
A. SCOPE

This work shall consist of installation of a stone dust walkway at the location(s) shown on the
layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/3/2016 - P152

By dnadmin on Mon, 11/07/2022 - 09:54
  • Read more about Finance Committee - Agenda - 5/3/2016 - P152

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘A (ALT)’ — COBBLESTONE PAVER (OPTION TO REPLACE STAMPED
CONCRETE)

A. SCOPE

This work shall consist of installation of a cobblestone paver walkway at the location(s) shown
on the layout plan or as ordered by the Engineer. The contractor shall submit a sample of the
proposed paver to be used and installation specifications for approval prior to construction.

B. MATERIALS AND CONSTRUCTION

Pagination

  • Previous page ‹‹
  • Page 1654
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact