Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/3/2016 - P158

Finance Committee - Agenda - 5/3/2016 - P158

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
158
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

1.08

WARRANTY

Playground surface shall maintain required impact attenuation characteristics and be
guaranteed against defects in workmanship and materials for a period of no less than five
years from date of completion of work. Maintenance requirements must be maintained
for duration of warranty period.

PART 2 — Products

A.

2.01

2.02

Playground surface shall consist of synthetic materials meeting the requirements of this
specification. Poured In Place Rubber Playground Surfacing components shall be installed
by a certified installer of the chosen manufacturer.

BASE LAYER

Primer: Polyurethane.

Poured In Place Base: Blend (86% rubber & 14% polyurethane) of strand and granular
100% recycled SBR (styrene butadiene rubber) and polyurethane. Depending on ASTM
F1292 requirements for critical fall height (4’, 5’, 6’, 7’, 8’, 9’ or 10’), select base layer
thickness of 1.25", 1.5", 2.0", 2.5", 3", 3.5", 4.0" or 5.0".

Color: Black

TOP LAYER

Primer: Polyurethane.

Poured In Place Top: Blend (82% rubber & 18% polyurethane) of recycled EPDM
(ethylene propylene diene monomer) and polyurethane. Nominal thickness of 0.5", with
a minimum 0.325" and a maximum 0.625".

Colors: Terra Cotta Red, Primary Red, Orange (indoor only), Pink, Gold, Beige, Yellow,
Bright Green, Army Green, Hunter Green, Teal, Sky Blue, Royal Blue, Purple, Pearl,
Eggshell, Brown, Light Gray, Dark Gray, Black. Custom colors and combinations available

(specify).

PART 3 — Execution

A.

3.01

3.02

Comply with the instructions and recommendations of the surfacing manufacturer.

EXAMINATION

Verification of Site Conditions: Verify that substrate conditions are suitable for
installation of the poured in place surfacing. Do not proceed with installation until
unsuitable conditions are corrected.

Drainage: Proper drainage is critical to the longevity of the surfacing system. Inadequate
drainage will cause premature breakdown of the poured system in affected areas; and
void the warranty.

PREPARATION

Existing Substrate Preparation: Remove any loose or delaminated material that would be
deleterious to application of the new surface. Fill cracks in existing concrete with
cementitious patching compound.