Division 9 — Construction Specifications
Legacy Playground at Labine Park
As Amended per Addendum # 2 issued March 24, 2016
ITEM ‘D’ — ELEMENT FOOTING (SIZE VARIES)
A. SCOPE
This work shall consist of installing and providing footings following the detail sheet of the plan
set provided or as ordered by the Engineer. This work may require coordination with a
community build day. See Item H for element type and specifications.
B. MATERIALS AND CONSTRUCTION
The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. Footings shall be installed per the manufacturer’s specifications for each
individual playground element.
C. MEASUREMENT AND PAYMENT
Element Footing will be measured by each installed equipment footing base. Payment for work
under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, forms, concrete, labor, tools, equipment, disposal of construction
debris (existing sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the
satisfactory completion of this work as specified.