Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/3/2016 - P153

Finance Committee - Agenda - 5/3/2016 - P153

By dnadmin on Mon, 11/07/2022 - 09:54
Document Date
Tue, 05/03/2016 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Tue, 05/03/2016 - 00:00
Page Number
153
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__050320…

Division 9 — Construction Specifications
Legacy Playground at Labine Park

As Amended per Addendum # 2 issued March 24, 2016

ITEM ‘B’ — STONE DUST PATHWAY (4” DEPTH)
A. SCOPE

This work shall consist of installation of a stone dust walkway at the location(s) shown on the
layout plan per the detail of the plan set provided or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply all labor, materials, equipment and transportation necessary for the
required work. The pathway shall be a minimum of 5’ wide and 4” in depth.

C. MEASUREMENT AND PAYMENT

Stone Dust Pathway will be measured by the number of square feet installed. Payment for
work under these items shall be at the contract unit price per unit and shall include full
compensation for excavation, grading, labor, tools, equipment, disposal of construction debris
(existing sidewalk, concrete, asphalt, etc.), and any other incidentals necessary for the
satisfactory completion of this work as specified.

Page Image
Finance Committee - Agenda - 5/3/2016 - P153

Footer menu

  • Contact