Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 10/18/2017 - P118

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P118

3.6 Exclusions and Limitations

3.1 The parties agree that Systems that have non-standard configurations that have not been
certified by Motorola Systems Integration Testing are specifically excluded from the ASTRO 25
SUA II unless otherwise agreed in writing by Motorola and included in this SOW.

3.2 The parties acknowledge and agree that the ASTRO 25 SUA II does not cover the following
products:

MCC3500 Dispatch Consoles

MIP5000 Dispatch Consoles

Plant/E911 Systems

MOTOBRIDGE Solutions

ARC 4000 Systems

Finance Committee - Agenda - 10/18/2017 - P117

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P117

2.2.1.3 Work with the Customer to validate that all available patches and
antivirus updates have been updated on the customer’s system.

2.2.2 Customer responsibilities

2.2.2.1 Validate system maintenance is current.
2.2.2.2 Validate that all available patches and antivirus updates to their
system have been completed.

2.3. System Upgrade
2.3.1 Motorola responsibilities

2.3.1.1 Perform system infrastructure upgrade in accordance with the
system elements outlined in this SOW.

2.3.2 Customer responsibilities

Finance Committee - Agenda - 10/18/2017 - P116

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P116

2.1.1.5 Inform Customer of high speed internet connection
requirements.

2.1.1.6 Assign program management support required to perform the
certified system upgrade.

24107 Assign fieid instaliation labor required to perform the certified
system upgrade.

2.1.1.8 Assign upgrade operations engineering labor required to perform
the certified system upgrade.

Finance Committee - Agenda - 10/18/2017 - P115

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P115

1.12 The ASTRO 25 SUA II does not cover all products. Refer to section 2.0 for exclusions and
limitations.

Finance Committee - Agenda - 10/18/2017 - P114

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P114

1.6 The following ASTRO 25 certified system release software for the following products are
covered under this ASTRO 25 SUA IT: base stations, site controllers, comparators, routers, LAN
switches, servers, dispatch consoles, logging equipment, network management terminals,
Network Fault Management (“NFM”) products, network security devices such as firewalls and
inirusion detection sensors, and associated peripheral infrastructure software.

Finance Committee - Agenda - 10/18/2017 - P113

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P113

SECTION 2

LIFECYCLE STATEMENT OF
WORK

The following Statement of Work - System Upgrade Agreement II (SUA ID has been provided
including; Appendix A - ASTRO 25 Eligible System Release Upgrade Paths, Appendix B - System
Pricing Configuration and Appendix C — Security Update Service (SUS) Statement of Work.

ASTRO 25 System Upgrade Agreement Ii (SUA 1}

1.6 Description of Service and Obligations

Finance Committee - Agenda - 10/18/2017 - P112

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P112

incremental Enhancements (Orderabie Features and Bug Fixes) - Ex. A7.17.1 ¥

Factory-certified integration, testing, and supply chain management of new v
software (SW) and hardware (HW) components

Platform HW and SW update in a 2-year period’ 1
Professicnail implementation services to upgrade your live system v

Finance Committee - Agenda - 10/18/2017 - P111

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P111

Your ASTRO 25 Land Mobile Radio (LMR) system is an integrated end-to-end solution that delivers
mission-critical land mobile radio services. The foundation of the ASTRO 25 network is an
information technology (IT) based call processing core that incorporates both Motorola and third-
party Original Equipment Manufacturer (OEM) software and hardware components. These
componenis follow typical IT industry lifecycles and eventuaily require replacement due to
obsolescence, As with IT computing platforms and other enterprise business systems, the pace of

Finance Committee - Agenda - 10/18/2017 - P110

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P110

SECTION 4

LAND MOBILE RADIO (LMR,

Lifecycle management of your LMR network is critical to keeping it secure, operational, expandable,
and up-to-date. Throughout the lifecycle of your LMR network maintenance and sustainment
activities will be required. (Refer to the diagram below.)

Finance Committee - Agenda - 10/18/2017 - P109

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/18/2017 - P109

TABLE OF CONTENTS

Section 1

Pagination

  • Previous page ‹‹
  • Page 1518
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact