Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/7/2017 - P472

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P472

01400-3
QUALITY CONTROL

PART 2 - PRODUCTS
Not Used

PART 3 - EXECUTION
Not Used

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P471

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P471

01400-2
QUALITY CONTROL

recommendations.

TESTING LABORATORY SERVICES

A. Owner will employ and pay for services of an Independent Testing Laboratory to
perform inspections, tests, and other services wherever an Independent Testing
Laboratory is required by individual specification sections listed in paragraph 1.2
above, unless otherwise indicated.

B. Services will be performed in accordance with requirements of governing
authorities and with specified standards.

Finance Committee - Agenda - 6/7/2017 - P470

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P470

01400-1

SECTION 01400

QUALITY CONTROL

PART 1 - GENERAL

1.1

1.2

1.3

1.4

1.5

1.6

1.7

REQUIREMENTS INCLUDED
General Quality Control.
Workmanship.
Manufacturer's Instructions.
Manufacturer's Certificates.
Manufacturer's Field Services.
Testing Laboratory Services.

™MOOW >

RELATED REQUIREMENTS
A. Section 01340 - Submittals: Submittal of Manufacturer's Instructions.
B. — Section 04200 - Masonry.

QUALITY CONTROL

Finance Committee - Agenda - 6/7/2017 - P469

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P469

01380-1

SECTION 01380

CONSTRUCTION PHOTOGRAPHS

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work Included:

1. Pre-Construction Record: Contractor shall utilize digital photographs and
video to obtain a visual record of the project area; copies of same shall be
given to the Engineer and Owner.

2. Notify Engineer at least three (3) working days prior to photographing or
videoing the project area so Engineer may, at his option, observe.

Finance Committee - Agenda - 6/7/2017 - P468

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P468

01370-1

SECTION 01370

SCHEDULE OF VALUES

PART 1 - GENERAL

1.1 DESCRIPTION
A. Extent of Work:

Finance Committee - Agenda - 6/7/2017 - P467

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P467

01340-8

SUBMITTALS
OPERATIONS AND MAINTENANCE MANUAL CERTIFICATION FORM
PROJECT: CONTRACTOR'S PROJ. NO:
CONTRACTOR: ENGINEER'S PROJ. NO:
ENGINEER:
O&M - OM-
NUMBER: SPECIFICATION SECTION SEQUENTIAL NUMBER
OR DRAWING NO: (& ALPHA SUFFIX FOR
RESUBMITTAL)
DESCRIPTION:
MANUFACTURER:

The above referenced operations and maintenance manual has been reviewed by the undersigned
and I/we certify that the manual is customized as needed for this project, is suitable for mounting

Finance Committee - Agenda - 6/7/2017 - P466

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P466

SUBMITTAL CERTIFICATION FORM

PROJECT: CONTRACTOR'S PROJ. NO:

CONTRACTOR: ENGINEER'S PROJ. NO:

ENGINEER:

SHOP -

DRAWING SPECIFICATION SECTION SEQUENTIAL NUMBER

NUMBER: OR DRAWING NO: (& ALPHA SUFFIX FOR
RESUBMITTAL)

DESCRIPTION:

MANUFACTURER:

The above referenced submittal has been reviewed by the undersigned and I/we certify that the
material and/or equipment meets or exceeds the project specification requirements with

[.] NO DEVIATIONS
or

Finance Committee - Agenda - 6/7/2017 - P465

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P465

01340-6
SUBMITTALS

for; however, Engineer requires that all comments will be addressed by the
Contractor, unless otherwise notified in writing prior to execution of the
relevant work.

Finance Committee - Agenda - 6/7/2017 - P464

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P464

01340-5
SUBMITTALS

certification that equipment, accessories and shop painting meet or exceed the
Specification requirements.
7. Where specified, manufacturer's guarantee.

C. Requirements for Electronic Submittals:

1. Each individual shop drawing or O&M submittal shall be contained in one
PDF.

2. The first page of the PDF shall be the Submittal Certification Form as
described above.

Finance Committee - Agenda - 6/7/2017 - P463

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P463

01340-4
SUBMITTALS

Maintenance Manual submitted, the Contractor shall provide a copy of the complete
Operations and Maintenance Manual Certification Form (copy provided for the
Contractor's use at the end of this Specification Section) signed by both the
Contractor and the Manufacturer.

1.5 MANUFACTURER'S CERTIFICATES

A. Prior to accepting the installation, the Contractor shall submit manufacturer's
certificates for each item specified.

Pagination

  • Previous page ‹‹
  • Page 1402
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact