01400-3
QUALITY CONTROL
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
END OF SECTION
13089K
01400-3
QUALITY CONTROL
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
END OF SECTION
13089K
01400-2
QUALITY CONTROL
recommendations.
TESTING LABORATORY SERVICES
A. Owner will employ and pay for services of an Independent Testing Laboratory to
perform inspections, tests, and other services wherever an Independent Testing
Laboratory is required by individual specification sections listed in paragraph 1.2
above, unless otherwise indicated.
B. Services will be performed in accordance with requirements of governing
authorities and with specified standards.
01400-1
SECTION 01400
QUALITY CONTROL
PART 1 - GENERAL
1.1
1.2
1.3
1.4
1.5
1.6
1.7
REQUIREMENTS INCLUDED
General Quality Control.
Workmanship.
Manufacturer's Instructions.
Manufacturer's Certificates.
Manufacturer's Field Services.
Testing Laboratory Services.
™MOOW >
RELATED REQUIREMENTS
A. Section 01340 - Submittals: Submittal of Manufacturer's Instructions.
B. — Section 04200 - Masonry.
QUALITY CONTROL
01380-1
SECTION 01380
CONSTRUCTION PHOTOGRAPHS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Work Included:
1. Pre-Construction Record: Contractor shall utilize digital photographs and
video to obtain a visual record of the project area; copies of same shall be
given to the Engineer and Owner.
2. Notify Engineer at least three (3) working days prior to photographing or
videoing the project area so Engineer may, at his option, observe.
01370-1
SECTION 01370
SCHEDULE OF VALUES
PART 1 - GENERAL
1.1 DESCRIPTION
A. Extent of Work:
01340-8
SUBMITTALS
OPERATIONS AND MAINTENANCE MANUAL CERTIFICATION FORM
PROJECT: CONTRACTOR'S PROJ. NO:
CONTRACTOR: ENGINEER'S PROJ. NO:
ENGINEER:
O&M - OM-
NUMBER: SPECIFICATION SECTION SEQUENTIAL NUMBER
OR DRAWING NO: (& ALPHA SUFFIX FOR
RESUBMITTAL)
DESCRIPTION:
MANUFACTURER:
The above referenced operations and maintenance manual has been reviewed by the undersigned
and I/we certify that the manual is customized as needed for this project, is suitable for mounting
SUBMITTAL CERTIFICATION FORM
PROJECT: CONTRACTOR'S PROJ. NO:
CONTRACTOR: ENGINEER'S PROJ. NO:
ENGINEER:
SHOP -
DRAWING SPECIFICATION SECTION SEQUENTIAL NUMBER
NUMBER: OR DRAWING NO: (& ALPHA SUFFIX FOR
RESUBMITTAL)
DESCRIPTION:
MANUFACTURER:
The above referenced submittal has been reviewed by the undersigned and I/we certify that the
material and/or equipment meets or exceeds the project specification requirements with
[.] NO DEVIATIONS
or
01340-6
SUBMITTALS
for; however, Engineer requires that all comments will be addressed by the
Contractor, unless otherwise notified in writing prior to execution of the
relevant work.
01340-5
SUBMITTALS
certification that equipment, accessories and shop painting meet or exceed the
Specification requirements.
7. Where specified, manufacturer's guarantee.
C. Requirements for Electronic Submittals:
1. Each individual shop drawing or O&M submittal shall be contained in one
PDF.
2. The first page of the PDF shall be the Submittal Certification Form as
described above.
01340-4
SUBMITTALS
Maintenance Manual submitted, the Contractor shall provide a copy of the complete
Operations and Maintenance Manual Certification Form (copy provided for the
Contractor's use at the end of this Specification Section) signed by both the
Contractor and the Manufacturer.
1.5 MANUFACTURER'S CERTIFICATES
A. Prior to accepting the installation, the Contractor shall submit manufacturer's
certificates for each item specified.