Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/7/2017 - P482

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P482

SECTION 01720

PROJECT RECORD DOCUMENTS

PART | - GENERAL

1.1

1.2

1.3

DESCRIPTION
A. Work Included:
1. Keep accurate record documents for all additions, substitutions of material,
variations in work, and any other additions or revisions to the Contract.
B. Related Work Specified Elsewhere:
1. Shop Drawings, Project Data, and Samples are specified in "General
Conditions" and Section 01340, Submittals.

MAINTENANCE OF DOCUMENTS
A. Maintain at job site, one copy of:

1. Contract Drawings

Finance Committee - Agenda - 6/7/2017 - P481

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P481

01710-2
PROJECT CLEANING

Control of Hazards:

1. Store volatile wastes in covered metal containers, and remove from premises
daily.

2. Prevent accumulation of wastes which may create hazardous conditions.

3. Provide adequate ventilation during use of volatile or noxious substances.

Disposal:

1. Donot burn or bury rubbish and waste materials on project site.

2. Donot dispose of volatile wastes, such as mineral spirits, oil, or paint thinner, in
storm or sanitary drains.

Finance Committee - Agenda - 6/7/2017 - P480

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P480

01710-1

SECTION 01710

PROJECT CLEANING

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work Included:

1.

2.

Maintain premises and public properties free from accumulations of waste,
debris, and rubbish, caused by operations.

At completion of work, remove waste materials, tools, equipment, machinery
and surplus materials, and clean all sight-exposed surfaces. Leave project clean
and ready for use.

1.2 QUALITY ASSURANCE

Finance Committee - Agenda - 6/7/2017 - P479

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P479

01630-1
SECTION 01630

SUBSTITUTIONS & PRODUCT OPTIONS

PART 1 - GENERAL

1.1

1.2

1.3

1.4

DESCRIPTION

A.

The below listed requirements are in addition to the requirements contained in the
General Conditions, Articles 8.3 - 8.5.

SUBMITTALS

A.

B.

Submit a written application for approval completely describing the proposed
substitution.

Submit, when requested by the Engineer:

1. Manufacturer's catalog data.

Illustrations.

Specifications.

Finance Committee - Agenda - 6/7/2017 - P478

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P478

01590-1
SECTION 01590

TEMPORARY FIELD OFFICE

PART | - GENERAL

1.1 DESCRIPTION
A. Work Included: Provide and maintain office supplies and equipment for the
exclusive use of the Engineer during the entire life of the Contract.

PART 2 - PRODUCTS

2.1 PRODUCTS

Finance Committee - Agenda - 6/7/2017 - P477

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P477

01500-5
TEMPORARY FACILITIES AND CONTROLS

C. Water:

1.

Provide and maintain water for drinking and construction purposes as required
for the proper execution of the Work.

D. Sanitary Accommodations:

1.

2.

Provide and maintain sanitary accommodations for the use of the employees
of the General Contractor, subcontractors, and Engineer.

Sanitary accommodations shall meet the requirements of all local, State and
Federal health codes, laws and regulations.

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P476

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P476

01500-4
TEMPORARY FACILITIES AND CONTROLS

5. The General Contractor shall furnish, install, maintain and pay for adequate
temporary chemical type toilet accommodations, for all persons employed on
the work and located where approved by the Engineer. The accommodations
shall be in proper enclosures and in accordance with Municipal Ordinances
and shall be maintained in proper, safe and sanitary conditions and suitably
heated when requested.

6. Relocate temporary toilet facilities as required to facilitate the construction.

Finance Committee - Agenda - 6/7/2017 - P475

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P475

01500-3
TEMPORARY FACILITIES AND CONTROLS

2. Heating and Ventilation

1.

Finance Committee - Agenda - 6/7/2017 - P474

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P474

01500-2
TEMPORARY FACILITIES AND CONTROLS

PART 2 - PRODUCTS

2.1 MATERIALS
1. Electrical

Finance Committee - Agenda - 6/7/2017 - P473

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P473

01500-1

SECTION 01500

TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1

1.2

DESCRIPTION
A. Work Included:

1.

Provide and pay for all temporary applicable utilities required to properly
perform the Work at no additional cost to the Owner including the placement
and removal of the utilities.

Completely remove all temporary equipment and materials upon completion
of the Work and repair all damage caused by the installation of temporary
utilities.

Pagination

  • Previous page ‹‹
  • Page 1401
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact