Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P470

Finance Committee - Agenda - 6/7/2017 - P470

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
470
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01400-1

SECTION 01400

QUALITY CONTROL

PART 1 - GENERAL

1.1

1.2

1.3

1.4

1.5

1.6

1.7

REQUIREMENTS INCLUDED
General Quality Control.
Workmanship.
Manufacturer's Instructions.
Manufacturer's Certificates.
Manufacturer's Field Services.
Testing Laboratory Services.

™MOOW >

RELATED REQUIREMENTS
A. Section 01340 - Submittals: Submittal of Manufacturer's Instructions.
B. — Section 04200 - Masonry.

QUALITY CONTROL

A. Maintain quality control over suppliers, manufacturers, products, services, site
conditions, and workmanship, to produce work of specified quality.

WORKMANSHIP

A. Comply with industry standards except when more restrictive tolerances or
specified requirements indicate more rigid standards or more precise workmanship.

B. Perform work by persons qualified to produce workmanship of specified quality.

C. Secure products in place with positive anchorage devices designed and sized to
withstand stresses, vibration, and racking.

MANUFACTURERS' INSTRUCTIONS

A. Comply with instructions in full detail, including each step in sequence. Should
instructions conflict with Contract Documents, request clarification from Engineer
before proceeding.

MANUFACTURERS' CERTIFICATES
A. When required by individual Specifications Section, submit manufacturer's
certificate that products meet or exceed specified requirements.

MANUFACTURERS' FIELD SERVICES

A. When specified in respective Specification Sections, require supplier and/or
manufacturer to provide qualified personnel to observe field conditions, conditions
of surfaces and installation, quality of workmanship, start-up of equipment, test,
adjust and balance of equipment as applicable, and to make appropriate
recommendations.

B. Representative shall submit written report to Engineer listing observations and

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P470

Footer menu

  • Contact