Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P469

Finance Committee - Agenda - 6/7/2017 - P469

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
469
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01380-1

SECTION 01380

CONSTRUCTION PHOTOGRAPHS

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work Included:

1. Pre-Construction Record: Contractor shall utilize digital photographs and
video to obtain a visual record of the project area; copies of same shall be
given to the Engineer and Owner.

2. Notify Engineer at least three (3) working days prior to photographing or
videoing the project area so Engineer may, at his option, observe.

1.2 UALITY
A. Pre-Construction Record: Quality shall be such that the condition of existing
building, structures, piping, pavement, curbing, loading bay, driveway entrances,
etc. can be readily determined.

1.3 SUBMITTAL OF PRINTS
A. Pre-Construction Record: Submit hard copy prints and electronic files on CD
ROM, and video electronic files on DVD to the Engineer and Owner prior to any
construction work.

B. The quality of the photos and video are subject to approval by the Engineer prior to
the start of construction work in the areas shown by the photos.

END OF SECTION