Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P317

Finance Committee - Agenda - 5/17/2017 - P317

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
317
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

this monitoring. Assign no other duties to this individual which will take this
person away from monitoring the air system.

2. The Compressed Air System for Type "C" Respirators (if utilized) shall be high
pressure, with a compressor capacity to satisfy the respirator manufacturer's
recommendations. The receiver shall have sufficient capacity to allow a 30
minute escape time for the respirator wearers in the event of compressor failure or
malfunction. The Compressed Air System shall have compressor failure alarm,
high temperature alarm, carbon monoxide alarm, and suitable in-line air purifying
sorbent beds and filters to assure Grade "F" Breathing Air. (See Subsection 2.0 -
Materials)

3. Where Type "C" Respirators are used, they shall be worn with a belt to minimize
possibility of dislodging the face mask when a hose is snagged in the Work Area.

4. The Contractor shall provide at all times a minimum of three spare hoses for the
Engineer, authorized visitors and inspectors to connect to their assigned Type "C"
Respirator without having to wait for removal of workers from the Work Area to
obtain a hose connection.

1.12 TEMPORARY FACILITIES

Water or electrical service, or both, may not be present at the project site. If services are not
available, the Contractor must provide these services. The Contractor shall provide
temporary facilities as required herein or as necessary to carry out the abatement Work. The
Contractor shall locate temporary services and facilities where they will serve the entire
Contract adequately and result in minimum interference with the performance of the Work.
The Contractor shall locate relocate, modify and extend services and facilities as required
during the course of Work so as to accommodate the abatement Work of the Project.

A. Water Service: Sufficient hot water for all workers shall be supplied by Contractor at a
minimum temperature of 100 degrees F. Supply hot and cold water to the
Decontamination Unit in accordance with Subsection 3.03.D.

1. Temporary Water Service Connection: All connections to the water system shall
include backflow protection. Valves shall be temperature and pressure rated for
operation of the temperatures and pressures encountered. After completion of
use, connections and fittings shall be removed without damage or alteration to
existing water piping and equipment. Leaking or dripping valves shall be piped
to the nearest drain or located over an existing sink or grade where water will not
damage existing finishes or equipment.

B. Electrical Service: The Contractor shall comply with applicable NEC, New Hampshire

modifications to the NEC, and UL standard and governing regulations for materials and
layout of temporary electric service. The Contractor shall provide a weatherproof,

02111-20

Page Image
Finance Committee - Agenda - 5/17/2017 - P317

Footer menu

  • Contact