EA 1S NOT EOUN
A rine EUrPReaaion,
jean? cr ae AS ae ae
IPPED. wTH
‘STSTEM,
oi
Lg
S31)
— |!
fr FIRE ALARM PLAN NOTES
NY
Lath BOSTIG FIRE ALARM DEVICES: COMPONENTS, WIRING, ETC. BHALL RETAIN IN THIS ROOT
UNLESS SPECIFICALLY NOTED OTHERWISE,
ZLALL EXIOTING FIRE ALARM DEVICES, COMPCHENTS, WIRING, ETC. TO BE REMOVED IN THIS
ROOM OR AREA UNLESS SPECIFICALLY NOTED GTHERMISE,
AE ELECTRICAL CONTRACTOR SHALL ODTAIN A FIRE ALARM PERFTIT FROM THE HABHUA FIRE
DEPARTHENT PRIOR TO COMMENCING
THE COMPLETION OF THE PROJECT, THE FIRE ALARM SYSTEM SHALL BE TESTED TO THE
SATISFACTION OF THE NASHUA FIRE DEPARTMENT:
S, RELOCATE EXISTING INDICATING DEVICE AND ASSOCIATED ZONE CIRCUITRY TO LOCATION
HNDICATED,
S RELOCATE EXIOTING INITIATING DEVICE AND ASSOCIATED ZONE CIRCUITRY TO LOCATION
ORS HNC ARE EXIBTING TO REMAN OR ARE ENSTING TO BE
Ratocarep ty Wh, THE RDNDATED AREA sta BE BAGGED AT THE BEGINNING OF EACH WORK
DE DE-BAGGED AT THE END OF EACH HORK SHIFT,
B, ALL INDICATING DEV SYNCHRONIZED TO COMPLY WITH INTERNATIONAL
Bullbind cope aoe fornoN aD rea Ty Boe AINE A eZ RES
DOBTING NON-STNCHRONIZED MOQULES AS REQUIRED OR UTILIZE SYNCHRONIZED HORN/STROGES
THROUGHOUT THE RENOVATED SPACE.
4, ALL NEW DEVICES SHALL DE AS MANUFACTURED BY THE BABE BUILDING STBTENS
TANUPACTURER, ONR.Y AUTHORIZED DEVICES SHALL BE TIED MITO-THE BUILDING'S FIRE ALARM
10, PROVIDE A STOPPER COVER ON EACH EXISTING MANUAL STATION REFERRED To THIS NOTE.
1. THE BUILDING ENGINEER HUST BE NOTIFIED AT LEAST 24 HOURS IN ADVANCE OF ANY Won
PERFORMED ON THE FIRE ALARM SYSTEM, THE FIRE ALARM SERVICE CONTRACTOR MUST
De PREEENT TO DISABLE AND RESTORE THE STETEM AT THE LESTRIGAL CONTRACTORS
12, NO PORTION OF THE FIRE ALARM SYSTEM SHALL BE PERMITTED TO REMAIN OUT OF
SERVICE OVERNIGHT,
13. ALL CHARGES INCURRED IN TAXING THE FIRE ALARM SYSTEM OFF LINE AND RETURNING (T
TO SERVICE WILL BE BORNE BY THE ELECTRICAL CONTRACTOR,
4, IF ANT DEVICES ARE ADDED OR CHANGED IN ANT HAY, THEN THE CHANGES MUST
REFLECTED AT THE. FIRE ALARM CONTROL PANEL Vik LABELING, PROGRAMMING, ETC COST OF
THE CHANGES ARE TO BE INCLUGED IN THE ELECTRICAL CONTRACTORS BID.
1S. FIRE ALARM TESTING MUST COMPLY WITH BUILDING MANAGEMENTS REQUIREMENTS (82%
BUILDING STANGARDS ).
16. ALL MAGNETIC LOCK DEVICES AND ELECTRICAL LATCHES SHALL RELEASE UPON FIRE ALARM
ACTIVATION
IT, FIRE ALARM CONTRACTOR SUALL COORDINATE WITH DOOR ACCESS CONTROL FOR ALL
EGRESS DOORS,
SHALL NOT BE
FIRST FLOOR KEY PLAN
SCALE. NTS, l
Nashua City Hall
Health and security updates
229 Main St
Nashua * NH
‘Fo 800.970.9005 F: €02.432.4256
NOT FOR REGULATORY
APPROVAL PERMITTING,
oR SUCTION
:
DENNIS MIRES,
THE ARCHITECTS
O97 Uneow Ser, Maecuerts, WH
(ACG a ei APS aT
late
drawn; SAS
checked: REGOH
scala ater
date 7pa320
2amo.