Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 9/16/2020 - P90

Finance Committee - Agenda - 9/16/2020 - P90

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
90
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

ie
SEE NOTE mt

ERSTING NON-ADA INDRCATING
DEVICE TO BE REMOVED ALOT.
WITH ASSOCIATED CIRCUITRY

( FIRE ALARM PLAN NOTES \

|. ALL EXISTING FIRE ALARM DEVICES, COMPONENTS, HIRING,
SHALL REMAIN I THis ocr OR AREA UNLESS SPECIFICALLY NOTED

2 ALL ROSTING TIRE ALART DEVICES, COMPONENTS, HIRING, ETC.
Ba ROBES AT DOE Ose PRL SPECIFICALLY

3 JHE ELECTRICAL CONTRACTOR SHALL OBTAIN A FIRE ALARM
FIReST PRGrt TH HARIAIA FIRE: BEPARTHENT. PRIOR TS COMMENCING

4, AT THE COMPLETION OF THE PROJECT, THE FIRE ALARM SYSTEM
SHALL BE TESTED TO THE SATISFACTION OF THE NASHUA FIRE
DEPARTHENT,

5. RELOCATE EXISTING INDICATING DEVICE AND ASSOCIATED ZONE
CIRCUITRY TO LOCATION INDICATED

&. RELOCATE EXISTING INITIATING DEVICE AND ASSOCIATED IONE
CIRCUITRY TO LOCATION INDICATED,

Tofith SPORE DETECTORS WKH ARE BueTiNG TO REFUIN OR ARE

af tle Besinunis ov eagi"bome Sarr aN Salt BE

SHALL BE TIED INTO THE BUILDING'S FIRE QLARM SYSTEM,

§0, PROVIDE A STOPPER COVER ON EACH EXISTING MANUAL STATION
REFERRED TO THIS NOTE

THE BURDING ENGINEER MUST BE NOTIFIED AT LEAST 24 HOURS
IN ADVANGE Or ake Nom MED ON THE FIRE ALARM
SYSTEM THE FIRE ALARM SERVICE CONTRACTOR MUST BE PRESENT
FO GABLE AND RBSTORE THE eiveTEH AT THE Alrcrmical

12, NO PORTION OF THE FIRE ALARM SYSTEM SHALL BE PERMITTED:
TO REMAIN OUT OF SERVICE OVERNIGHT,
3. ALL INCURRED IN TARING THE FIRE ALARM SYSTET OFF

CHARGES
Li AND RETUMING IT TO SERVICE
RICAL CONTRACTOR,

ld. IF ANY DEVICES ARE OR_CHANGED IN ANT WAY, THEN THE
Giahices HOST BE REFLECTED te rie ALARM CONTROL PANEL
OF THE CHANGES ARE TO

BE INCLUDED IM THE ELECTRICAL

I. FIRE ALARM TESTING MUST COMPLY ITH BUILDING MANAGEMENTS:
REQUIREMENTS (SEE BUILDING STANDARDS).

le, ALL MAGNETIC LOOK DEVICES AND ELECTRICAL LATCHES SHALL
RELEASE UPON FIRE ALARM ACTIVATION.

'7. FIRE ALARM CONTRACTOR SHALL COORDINATE WITH DOOR ACCESS
FOR ALL EGRESS DeoRS,

Nashua City Hall
229 Main St
Nashua * NH

Health and security updates

NOT FOR REGULATORY
APPROVAL PERMITTING,
0 CONSTRUCTION

97 Urson Swen, Mancunris, NH
[AE OAS) me TEACH aa

ae oe

THE

Page Image
Finance Committee - Agenda - 9/16/2020 - P90

Footer menu

  • Contact