IMPAIRMENT PROCEDURE FOR THE
DEMOLITION PROJECT DURING
NORMAL WORK HOURS
THIS AREA IS NOT BGVIPPED WITH AN AUTOMATIC
SPRINGLER SYSTEM, THE EXISTING BUILDING
AUTOMATIC SPRINKLER SYSTEM SHALL
ACTIVE THROUGHOUT THE COURSE GF THE
DEMOLITION PROJECT, (BEE NOTE ™3),
2 ALL BQSTING FIRE ALARM DEVICES, EoUNPrIENT,
PANELS, WIR SHALL REMAIN IN PLACE
OPERA
229 Main St
Nashua * NH
SUPPRESSION SYSTEM IN THIS SPACE SHALL
SHUT Dow AT THE START OF EACH WORE DAT
AND REACTIVATED AT THE END OF BAGH WORK
Nashua City Hall
Health and security updates
4 RELOCATE EXISTING INITIATING DEVICE AND ITS
ASSOCIATED CIRCUITRY, MAINTAIN CONTINUITY OF
| FIRE ALARM CIRCUIT.
%. TEnPoRaRi-y RELOCATE THE exis TiNG
FIRE DETECTION
SYSTEM IM THIS SPACE SHALL i
REMAIN ACTIVE DURDNG THE
DEMOLITION PHASE. ALL RENOVATED
TING SMOKE DETECTORS,
BETORS,
STATIONS AND AUDIOVYISUAL
DEARY WH 03038
Te O88.M70.9068 F: 693.432.4255
32 MANCHESTER ROAD, SUITE 4A
a
NOT FOR REGULATORY
PROVAL PERMITTING,
5
OR CONSTRUCTION
7 Ueecas Sear, Mancrests, NH
DENNIS MIRES, P.A.
ARCHITECTS
14 25-4 worse
dbdidbdidbdbd
THE
FIRE ALARM
PLAN
baw
drawn: SAS
checked: REGIA
‘scale: We tr
data: ano
220140
proj. no.: 2020-049
FIRST FLOOR KEY PLAN FAIP103
SCALE NTS,
