Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 9/16/2020 - P91

Finance Committee - Agenda - 9/16/2020 - P91

By dnadmin on Mon, 11/07/2022 - 13:26
Document Date
Fri, 09/11/2020 - 13:35
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 09/16/2020 - 00:00
Page Number
91
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__091620…

NOTE: THIS FUSER IS DIAGRAMMATIC ONLY. THE FIRE ALARM SYSTEM SUPPLIER
SHALL PROVIDE FOnER CONTROL HSOLATOR
CIRCUITRY, REQUIRED ERECT A ‘SYSTEM THAT 3

( FIRE ALARM SYSTEM RISER DIAGRAM NOTES *\

FIRE ALARM RISER DIAGRAM

il on INDICATES # OF FIRE ALARM
CONDUCTORS IN APPROPRIATELY S(ZED CONDUIT. ALL FIRE
ALARM CONDUCTORS MUST BE COPPER

ze INDICATES TO PROVIDE THE APPROPRIATE
QUANTITY OF CONDUCTORS RECOMMENDED BY THE
SYSTEM MANUFACTURER,

3, THE ELECTRICAL CONTRACTOR SHALL SUBMIT PLANS,
BATTERY CALCULATIONS AND

SPECIFICATIONS TO THE DEPARTMENT Of
THe OF DEVICES AND THE BTSTEM ITBELF
HORE ON THIS:
a ROOFTOP UNIT SUPPLY AND RETURN AIR,

ALL DESIGHATED
FANS SHALL BE AUTOMATICALLY SHUT DOHN WHEN THE
FIRE ALARM SYSTEM IS ACTWATED INTO "ALARM"

|. ALL SMOKE AND HEAT DETECTOR BASES AND HEADS.
SHALL BE LABELLED AS IDENTIFIED IN THE FIRE ALARM
CONTROL PANEL,

& DUCT MOUNTED SMOKE DETECTORS SHALL BE
AUTOMATICALLY RESET KHEN THE HAIN FIRE ALARFT
CONTROL PANEL 18 RESET.

T. FIRE ALARM SYSTEM HIRING SHALL BE ISOLATED PROM
ALL OTHER CONDUCTORS AND MUST TEST FREE OF ALL

8. ALTERNATING CURRENT CARRYING CONDUCTORS SHALL
‘NOT BE INSTALLED CLOSE TO, OR IN THE SAME RACEHAY
WITH, THE FIRE ALARM

4, ALL FIRE ALARM SYSTEM HIRING SHALL DE COPPER AND
‘SHALL BE UL LISTED AS PER NELC. TEO.

10, THE FIRE ALARM WIRING METHOD SHALL BE ETHER TYPE
Me FIRE ALARM CABLE OR THTN [8 GAUGE (riniriur)
(CONDUCTORS INSTALLED IN EMT COHDUIT.

1, ALL FIRE ALARM DEVICES SHALL BE INSTALLED IN A
MUNCTION, WORK OR BACKDOX,

{2 ALL FIRE ALARM SYSTEM RACEHAYS AND BOXES SHALL
BE FIELD OR FACTORY PAINTED RED,

IS, THERE BHALL BE NO ‘TY TAPPING ALLOWED ON ANY FIRE
ALARM CIRCUITS.

14, ALL SMOKE AND HEAT DETECTORS SHALL BE LOCATED A
MINIFUT OF BE" AWAY FROM SUPPLY AIR DIFFUSERS OR

ROOF
NO FIRE ALARM WORK REQUIRED
THIRD FLOOR.
NO FIRE ALARM WORK REQU
‘SECOND FLOOR,

L-4—
FIRST FLOCR,
SASSO
RR GRR Device
(BASEMENT

Nashua City Hall
229 Main St
Nashua * NH

Health and security updates

Sk

‘22 MANCHESTER ROAD, SUITE 2A.

DERRY KH O3038
Te O00870.0008 F: #09.472.4255

NOT F LATE
APPROVAL PERMITTING.
GR CONSTRUCTION

ar

ARCHITECTS

O97 User SWE, MANCIESTS, NH
(LS 25 BA wre Toe

DENNIS MIRES, P.A.

THE

ae
drawn: AS
checked: arGpH
scale) fterar
date 73/20

0190

proj, no.: 2020-049

FA301

Page Image
Finance Committee - Agenda - 9/16/2020 - P91

Footer menu

  • Contact