Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 31131 - 31140 of 38765

Finance Committee - Agenda - 5/16/2018 - P295

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
295
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

2)\ THE CITY OF NASHUA The Gate City’

Financtal Services

Purchasing Department

a: 7 Se a

May 10, 2018
Memo #18-124

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2018 CIPP LINING (VALUE: $715,658)
DEPARTMENT: 169 WASTEWATER; FUND: BOND

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated April 26, 2018
for information related to this purchase.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.

The City Engineer, Board of Public Works and the Purchasing Department recommend the award of this
contract in the amount of $715,658 to Layne Inliner of Fairfield, ME.

Purchasing Manager

Cc: S Dookran L Fauteux

229 Main Street e Nashua, New Hampshire 03061 « Phone (603) 589-3330 e Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 5/16/2018 - P295

Finance Committee - Agenda - 5/16/2018 - P296

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
296
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

To:

From:

Re:

G. Motion:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: April 26, 2018

Stephen Dookran, P.E., City Engineer
Engineering Department

2018 CIPP Lining
Construction

To approve the construction contract for the 2018 CIPP Lining to Layne Inliner of
Fairfield, ME in the amount of $715,657.50. Funding will be through: Department: 169
Wastewater; Fund: Bond; Activity: Sewer Rehab.

The annual sewer program addresses failing, aged sewers and associated structures and
piping. This 2018 Cured in Place Pipe (CIPP) Lining project is expected to line
approximately 6,200 feet of sewer mains, of which about 5,700 are under roadway and
530 feet are off road. In general, the connecting drainage basins and drainage pipes will
be excavated and replaced under a separate contract. The locations of CIPP Lining
included in this contract are:

Kinsley St - Walnut St to Vine St and from Ritter St to Woodward St
Lake St from Pine St to 254 Lake St (near Caldwell Rd)

Gillis St from 4 Gillis St to Arlington Ave

Manchester St from 17 Manchester St to Hopkins St

Liberty Utilities yard area at 38 Bridge St

Five contractors attended the mandatory pre-bid meeting on March 28. Two bids were
received on April 17 as follows:

Insituform Technologies of Chesterfield, MO $748,705.00
Layne Inliner of Fairfield, ME $715,657.50

The low bid was reviewed and found to be acceptable. Although Layne Inliner has not
previously worked for the City, we have checked their references and found them to be
acceptable.

General coordination issues may impact the construction schedule. For example,
certain parts of the 2018 Sewer Replacement contract need to be done ahead of this
contract. Therefore, this contract may run into a second construction season.

Page Image
Finance Committee - Agenda - 5/16/2018 - P296

Finance Committee - Agenda - 5/16/2018 - P297

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
297
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

THIS AGREEMENT is dated as of the __ day of in the year 2018 by and between the City
of Nashua, New Hampshire (hereinafter called OWNER) and Layne Inliner, LLC and its successors,
transferees and assignees together (hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as
follows:

ARTICLE 1 - WORK

1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:

The scheduled work for the 2018 CIPP Lining Project consists of work on Kinsley St, Lake St,
Gillis St, Manchester St and 38 Gillis St (off road, in gas company’s yard area). Work includes
2,875 feet of 12 inch pipe CIPP lining, 1,620 feet of 15 inch pipe CIPP lining, 2,390 feet of 18”
pipe CIPP lining, 505 feet of short liner point repair in pipes varying from 8 inch to 24 inch
diameter, 375 vertical feet of manhole lining, and miscellaneous other items related to pipe lining
work.

ARTICLE 3 - ENGINEER
3.01 The Project has been designed by: Division of Public Works
ENGINEERing Department
9 Riverside Street
Nashua, NH 03062
who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and

responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract Documents.

ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.

AG - 1 0f 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P297

Finance Committee - Agenda - 5/16/2018 - P298

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
298
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

4.02 Dates for Substantial Completion

A. Project will begin once a written “Notice to Proceed” is issued.
B. Substantial Completion shall be 715 calendar days from the Notice to Proceed and
Final Completion shall be __90 calendar days from the Notice to Proceed,

4.03 Liquidated Damages

A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and
that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph
4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions.
The parties also recognize the delays, expense and difficulties involved in proving in a legal or arbitration
proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead
of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but
not as a penalty) CONTRACTOR shall pay OWNER ONE HUNDRED dollars ($100) for each calendar
day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is
substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to
complete the remaining Work within the time specified in paragraph 4.02 for completion and readiness for
final payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER
TWO HUNDRED dollars ($200) for each calendar day that expires after the time specified in paragraph
4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.

B. In the event that the CONTRACTOR fails to pay OWNER the specified liquidated damages
amount within thirty (30) days of CONTRACTOR being notified of said damages, OWNER may deduct
the amount of the assessed liquidated damages from the final payment or retention withheld pursuant to
Article 14 of the General Conditions.

ARTICLE 5 - CONTRACT PRICE

5.01 Subject to additions and deductions by Change Order, the OWNER shall pay CONTRACTOR, in
accordance with the Contract Documents, the Contract Sum of:

SEVEN HUNDRED FIFTEEN THOUSAND SIX HUNDRED FIFTY-SEVEN AND 50/100 DOLLARS
($715,657.50)

The Contract Sum shall include all items and services necessary for the proper execution and completion of
the Work determined below:

A. for all Unit Price Work, an amount equal to the sum of the established Unit Price for each
separately identified item of Unit Price Work times the estimated quantity of that item, as indicated in the
attached Bid Schedule;

B. as provided in paragraph 11.03 of the General Conditions estimated quantities are not
guaranteed, and determinations of actual quantities and classification are to be made by ENGINEER as
provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in
paragraph 11.03 of the General Conditions.

AG -2 of 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P298

Finance Committee - Agenda - 5/16/2018 - P299

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
299
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

ARTICLE 6 - PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments

A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General
Conditions.

B. Applications for Payment under this agreement shall be submitted as follows:
> Electronically via email to VendorAPInvoices@NashuaNH.gov
OR

> Paper Copies via US Mail to:

City of Nashua, City Hall
Accounts Payable
229 Main Street
Nashua, NH 03060

Please do not submit invoices both electronically and paper copy.

In addition, and to facilitate the proper and timely payment of applications, the OWNER requires that
all submitted invoices contain a valid PURCHASE ORDER NUMBER

6.02 Progress Payments; Retainage

A. — Progress Payments. The OWNER will once each month make a progress payment to the
CONTRACTOR on the basis of an estimate of the total amount of work done to the time of the estimate and
its value as prepared by the CONTRACTOR and approved by the ENGINEER. All such payments will be
measured by the schedule of values established in paragraph 2.07.A of the General Conditions (and in the
case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of
values, as provided in the General Requirements.

B. Retainage. The OWNER will retain a portion of the progress payment, each month, in
accordance with the following procedures:

1. The OWNER will establish an escrow account in the bank of the OWNER’s
choosing. The account will be established such that interest on the principal will be
paid to the CONTRACTOR. The principal will be the accumulated retainage paid
into the account by the OWNER. The principal will be held by the bank, available
only to the OWNER, until termination of the contract.

2. Until the work is 50% complete, as determined by the ENGINEER, retainage shall

be 10% of the monthly payments claimed. The computed amount of retainage will be
deposited in the escrow account established above.

AG - 3 of 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P299

Finance Committee - Agenda - 5/16/2018 - P300

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
300
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

3. After the work is 50% complete, and provided the CONTRACTOR has satisfied the
ENGINEER in quality and timeliness of the work, and provided further that there is
no specific cause for withholding additional retainage no further amount will be

remainder of the project.
6.03 Final Payment

A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the
General Conditions, OWNER shall hold 2% retainage during the 1 (one) year warranty period and release it
only after the project has been accepted.

ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS

7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following
representations:

A. CONTRACTOR has examined and carefully studied the Contract Documents and the other
related data identified in the Bidding Documents.

B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, and performance of the Work.

D. CONTRACTOR has carefully studied all (if any): (1) reports of explorations and tests of
subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to
existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which
have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General
Conditions and (2) reports and drawings of Hazardous Environmental Condition, if any, at the Site which has
been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.

E. CONTRACTOR is entitled to rely upon the general accuracy of the “technical data” as
provided in paragraph 4.2 of the General Conditions. CONTRACTOR acknowledges that such reports and
drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes.
CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for the
accuracy or completeness of information and data shown or indicated in the Contract Documents with
respect to Underground Facilities at or contiguous to the site.

F, CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data
concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which
may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods,
techniques, sequences and procedures of construction, if any, expressly required by the Contract Documents
to be employed by CONTRACTOR, and safety precautions and programs incident thereto.

AG - 4 0f 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P300

Finance Committee - Agenda - 5/16/2018 - P301

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
301
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

G. CONTRACTOR does not consider that any further examinations, investigations,
explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within
the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.

H. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
others at the Site that relates to the Work as indicated in the Contract Documents.

I. CONTRACTOR has correlated the information known to CONTRACTOR, information
and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents
and all additional examinations, investigations, explorations, tests, studies, and data with the Contract
Documents.

J. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or
discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution
thereof by ENGINEER is acceptable to CONTRACTOR.

K. The Contract Documents are generally sufficient to indicate and convey understanding of all
terms and conditions for performance and furnishing of the Work.

ARTICLE 8 - CONTRACT DOCUMENTS
8.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement;
2. General Conditions;
3. Supplementary Conditions;
4. Bid Bond;
5. Bid Form;
6. Performance Bond;
7. Payment Bond;
8. Certificate of Insurance
9. Technical Specifications as listed in Table of Contents

10. Addenda (numbers 1 to 1_, inclusive);

11. Exhibits, as listed in the Table of Contents, to this Agreement

AG -50f8

Page Image
Finance Committee - Agenda - 5/16/2018 - P301

Finance Committee - Agenda - 5/16/2018 - P302

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
302
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

12. The following which may be delivered or issued on or after the Effective Date of the
Agreement and are not attached hereto:

a. Written Amendments
b. Change Order(s)

14. New Hampshire Department of Transportation “Standard Specifications for Road and

Bridge Construction”, latest edition, incorporated by reference or unless otherwise
indicated.

15 “Manual of Uniform Traffic Control Devices”, latest edition, incorporated by reference.

16 City of Nashua, Standard Specifications for Sewers and Drains, Revised, Approved and
Adopted June 15, 1992, incorporated by reference.

17 City of Nashua, Standard Specifications for Road Construction, Approved and Adopted
June 11, 1986, incorporated by reference.

18 City of Nashua, Standard Specifications for Sidewalk Construction, Approved and
Adopted August 28, 1995, incorporated by reference.

19 City of Nashua Ordinance O-03-219 (Amended), Approved November 14, 2003.
20 Fully Executed City of Nashua Purchase Order

B. The documents listed in paragraph 8.01.A are attached to this Agreement (except as expressly
noted otherwise above),

C. There are no Contract Documents other than those listed above in this Article 8.

D. The Contract Documents may only be amended, modified or supplemented as provided in
paragraph 3.04 of the General Conditions.
ARTICLE 9 - MISCELLANEOUS
9.01 Terms
A, Terms used in this will have the meanings indicated in the General Conditions.
9.02. Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be
binding on another party hereto without the written consent of the party sought to be bound; and, specifically

but without limitation, moneys that may become due and moneys that are due may not be assigned without
such consent (except to the extent that the effect of this restriction may be limited by law), and unless

AG -6 of 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P302

Finance Committee - Agenda - 5/16/2018 - P303

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
303
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

specifically stated to the contrary in any written consent to an assignment, no assignment will release or
discharge the assignor from any duty or responsibility under the Contract Documents.

9.03 Successors and Assigns

A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal
representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect
to all covenants, agreements, and obligations contained in the Contract Documents.

9.04 Severability

A. Any provision or part of the Contract Documents held to be void or unenforceable under any
Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and
binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to
replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as
possible to expressing the intention of the stricken provision.

9.05 Choice of Law and Venue

A. This agreement shall be governed exclusively by the laws of the State of New Hampshire and
any claim or action brought relating to this contract, the work performed or contracted to be performed
thereunder, or referable in anyway thereto shall be brought in Hillsborough County (New Hampshire)
Superior Court Southern Judicial District or in the New Hampshire 9th Circuit Court—Nashua and not
elsewhere

Address for giving notices to OWNER: Address for giving notices to CONTRACTOR:
Division of Public Works Nathan Holmes, Branch Manager

Engineering Department Layne Inliner, LLC

9 Riverside Street 195A Norridgewock Road

Nashua, NH 03062 Fairfield ME 041937

AG - 7 of 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P303

Finance Committee - Agenda - 5/16/2018 - P304

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
304
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in iriplicate. One
counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of the
Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or
identified by ENGINEER on their behalf.

CITY OF NASHUA —- OWNER

James Donchess, Mayor City of Nashua

Date:
CONTRACTOR:
By:
Layne Inliner, LLC (Authorized Representative)
Print Name:
Date:

AG - 8 of 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P304

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3110
  • Page 3111
  • Page 3112
  • Page 3113
  • Current page 3114
  • Page 3115
  • Page 3116
  • Page 3117
  • Page 3118
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact