Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/19/2019 - P68

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P68

Otterbine Barebo Inc.

PHYSICAL INSTALLATION
WARNING: DISCONNECT POWER BEFORE INSTALLING, REMOVING, OR SERVICING UNIT

Concept 3 Otterbine aerators require a minimum 30"/75cm (40"°/100cm w! lights) of water depth.
A. Attach your Otterbine power
cable to the aerator.

1. Align the keyway on the cable pigtail
connector to the key on the aerator
bulkhead connector and plug together.
Thread the nut onto the bulkhead,

hand tighten only, do not use tools on
the pigtail connector nut.

Finance Committee - Agenda - 6/19/2019 - P67

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P67

Otterbine Barebo Inc.

C. Mounting the Stabilizers (Comet Spray Pattern Only)

1. Mount each of the four stabilizer plates to the top side of a bracket using a hex bolt, a fender washer, and a nylon
locknut as shown below.

2. Mount each of the four stabilizer plate assemblies from Step C1 to the top side of an outer hole in the float using an
eyebolt, a fender washer, and a nylon locknut as shown. Do not over tighten. Damage may occur to the float.

parts tist
ITEM) DESCRIPTION | PART NUMBER | QTY |
Comet Stabilizer Plates Kit

Finance Committee - Agenda - 6/19/2019 - P66

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P66

Otterbine Barebo Inc.

UNIT ASSEMBLY
READ THE INSTRUCTIONS: Improper assembly may result in damage to the unit.

NOTES:
*Genesis Pump Chamber; The Float MUST be mounted before the Genesis Throat Assembly (Shown on page 20).
(The unit will be received with the pumping chamber already mounted)

*5HP "Open Throat” Units (Sunburst, Gemini, Saturn); If applicable, the Supplemental Float must be mounted to
the Main Float before installing on Unit (See Below).

A. Supplemental Float Assembly

Finance Committee - Agenda - 6/19/2019 - P65

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P65

Otterbine Barebo Inc.

f \ a -
i
j
yo
. , ft
392.91mm 2 an
[15% inl / |
eos e |
| fe | if
; H
Bape ta i Hi
342,77 mm———+ | iH
[13/4 inl 371.48mm | Hh
fe [145ginp
OVERALL DIMENSION MOUNTING HOLE LAYOUT

Cc. PCC Mounting
1. To prevent damage to the enclosure mount the enclosure using all four (4) mounting holes.
2. Whenever possible do not mount the PCC in direct sun light.

Finance Committee - Agenda - 6/19/2019 - P64

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P64

Otterbine Barebo Inc.

INSPECT AERATOR EQUIPMENT

Immediately report any shipping damage to the carrier that delivered your aerator.

Inspect your aerator and verify the following:
Unit - Check the nameplate located on the housing of the aerator unit to make sure you have received the correct
horsepower and voltage aerator.

Power Control Center - Verify the PCC is compatible with the aerator unit horsepower and voltage. Refer to the electrical
specifications on the nameplate located inside on the door of the PCC.

Finance Committee - Agenda - 6/19/2019 - P63

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P63

Otterbine Barebo Inc.

SAFETY INSTRUCTIONS
7 aA

PLEASE READ THIS MANUAL COMPLETELY BEFORE INSTALLING AND USING
THIS PRODUCT. SAVE THIS MANUAL FOR FUTURE REFERENCE AND
KEEP IN THE VICINITY OF THE PRODUCT.

Frineoace

ALL ELECTRICAL WORK MUST BE PERFORMED BY A QUALIFIED LICENSED ELECTRICIAN AND CONFORM
WITH ALL APPLICABLE ELECTRICAL SAFETY CODES
Tous travaux électriques doivent étre effectués par un électricien professionnel qualifié et conforme a tous les codes
applicables sécurité électrique

Finance Committee - Agenda - 6/19/2019 - P62

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P62

Water Works
With Otterbine
ery a Sigil :

CONCEPT3
Owner's Manual

A Guide to More Dependable
Water Quality Management
With Otterbine Barebo Inc.'s
1,2, 3 & 5 Horsepower Surface Spray
Aerating Fountain

Finance Committee - Agenda - 6/19/2019 - P61

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P61

Finance Committee - Agenda - 6/19/2019 - P60

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P60

www.otterbine.com/phoenix

»

»

»

»

»

»

»

© PHOENIX

AERATING FOUNTAIN

Most energy efficient system in the industry.
5 year all-inclusive warranty.

Operates in 30in or 75cm of water. (No additional depth
needed when adding LED lights; additional 10in or 26cm
required if adding high voltage lights.)

Complete package includes assembled unit, power
control center, and cable. (No PCC for 50HZ.)

Finance Committee - Agenda - 6/19/2019 - P59

By dnadmin on Mon, 11/07/2022 - 13:06
  • Read more about Finance Committee - Agenda - 6/19/2019 - P59

| turf products QUOTE

157 Moody Road @ PO Box 1200 e Enfield, CT 06083

PreparedFor: City of Nashua - RIVERFRONT Quote #: 354CON41619-5PH
229 Main Street Quoted Date: 05/31/19
Nashua, NH 03060 Prepared By: Bill Conley

bconley@turfproductscorp.com

(860) 253-7832

5 HP OTTERBINE FOUNTAINS

Pagination

  • Previous page ‹‹
  • Page 856
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact