Finance Committee - Agenda - 12/6/2017 - P36
ENGINEERING CONSTRUCTION PHASE CONTRACT
For Professional Services for Treatment Works
Services to be Performed by the ENGINEER
ENGINEERING CONSTRUCTION PHASE CONTRACT
For Professional Services for Treatment Works
Services to be Performed by the ENGINEER
ENGINEERING CONSTRUCTION PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS
CITYAFOWN OF NASHUA, NEW HAMPSHIRE
This AGREEMENT made and entered into at HILLSBOROUGH County, New Hampshire, this
day of 2017, by and between City-Fown-of NASHUA, NEW HAMPSHIRE
hereinafter called the OWNER, and WESTON and SAMPSON hereinafter called the ENGINEER.
WITNESSETH:
To:
From:
Re:
B. Motion:
Attachments:
Discussion:
City of Nashua, Public Works Division
Board of Public Works Meeting Date: November 20, 2017
Noelle Osbome, Plant Operations Supervisor
Wastewater Department
SCADA Upgrades Project — Construction Phase Services
THE CITY OF NASHUA “The Cate City’
Financial Services
Purchasing Department
November 30, 2017
Memo #18-060
TO: MAYOR DONCHESS
FINANCE COMMITTEE
SUBJECT: SCADA UPGRADES PROJECT — CONSTRUCTION PHASE SERVICES
(VALUE: $59,480)
DEPARTMENT: 169 WASTEWATER; FUND: WERF
Please see the attached communication from Noelle Osborne, Plant Operations Supervisor Wastewater
Department dated November 20, 2017 for the information related to this purchase.
Mark A. Mirley Electric
10/27/2017
Dan Callahan
Vice President
Monadnock Commercial Building Co.
32 Fitzgerald Drive
Unit 10
Jaffrey, N.H. 03452
Job Name: Nashua Wastewater Treatment Plant, Nashua NH.
Material Breakdown
Below is the material breakdown for the CRTU-1 make up heat proposal of 10/19/2017
Mark A. Mirley Electric
10/19/2017
Dan Callahan
Vice President
Monadnock Commercial Building Co.
32 Fitzgerald Drive
Unit 10
Jaffrey, N.H. 63452
Job Name: Nashua Wastewater Treatment Plant, Nashua NH.
Proposal
This proposal is for CRTU1 Power at Nashua Wastewater Treatment Plant, Nashua NH.
e Install power for CRTU1 make up heat
Material Cost: $5,725.00
15% Mark up $859.00
Material Total: $5,584.00
Labor:
Pipe Installation:
1 man @ $80/hr. x 16 hours = $1,280.00
FS
Buchley pGasoctates, Tue.
Quote Nursber
‘so5e0 QUOTATION
= Customer List **
at. Bid Date 10/12/2017
ei ee By Salesperson Scott Littie Page 1of 1
(603) 689-3568 — ee Seethgee _
Fax (603) 669-2347
Project NASHUA WAYTF
Location NASHUA, NH
Pian Date
Engineer WRIGHT-PIERCE ENGINEERS
UT LG UTET TAAL O ALU aT See ee bates app
Ge Product _ Beveription _____ Price
SHEET METAL PRODUCTS
$1,126
GREENHECK IDHC ELECTRIC DUCT HEATER, 15KW, 480V//3PH, 80/20
' pes!
surnell Controls, Inc.
i
Environmental Control Selutiers
153 Andover Street, Suite 202
Danvers, Ma 03923
978.646.9992 (T) 978.646.9511 )
Daie: October 16, 2017
Ati: CAT
Subject: Nashua WWTF
We are pleased to provide our price for the ATC work at the above-mentioned project. This proposal is
based on the following scope of work.
ITEM I: Electric Duct Heater
® QTY
Furnish and install NEMA 12
CHANGE ORDER
DATE: 10/17/2017
CACICO# 08
TO: Monadnock Building Co.
32 Fitzgerald Dr. Unit 10
Jaffery, NH 03452
ATTN: Dan Callahan
RE: Duct Heater
© nereby agree to make the change (S) spec below:
FF y Fe
ge Sumy Wh toe,
AD 7 OD
BY JOHNSON CONTROLS
]
a
°
BY JOHNSON CONTROLS
BID DATE: 40/1 9/2017
PRGJECT: Nashua WTP GUOTE & I7JRC - Nashua WWTP -- 06-03
yO: CAG Mechanical
ATTN: Rob DeCesare
CHANGE ORDER
i JOHNSON CONTROLS PACKAGED ROOF TOP UNIT
PHASE 7
o CRTU-1
Hoi Gas Bypass —~ Factory Installed Rawal Valve
«» Engineer requested change (not listed on plans or equipment spec
« Dual enthaipy economizer
e Engineer requesied change (single enthalpy specified)