ENGINEERING CONSTRUCTION PHASE CONTRACT
For Professional Services for Treatment Works
Services to be Performed by the ENGINEER
A. Upon execution of this AGREEMENT, the EN-
GINEER shall proceed with the general administration
of construction and—fel part-time inspection by
qualified personnel of the contractor's work to assure
compliance with the contract documents and any
coincident or subsequent changes or change orders for
the construction of the treatment works tor the (Fewnt
City) of NASHUA, NEW_HAMPSHIRE, Scope of
Work attached as Exhibit A and Fee Schedule attached
as Exhibit B and incorporated by reference as if fully
set forth herein.
Said services shall include, but shall not necessarily be
limited to:
1. General Construction Administration
a. Updating and modifications of
contract documents to meet changed site
and project conditions or variations in
State or Federal requirements.
d. Checking detail construction, shop
and erection drawings submitted by the
contractor.
e. Reviewing laboratory, shop, and
mill test reports of materials and equip-
ment.
f. Preparation of drawings and techni-
cal material as required supplementing
and/or clarifying the contract documents.
g. Review, verification, and approval
of estimates for periodic and final pay-
ments to the contractors for submittal to
the OWNER and the DIVISION.
h. Periodic inspection of work and
final inspection.
Construction Phase Engineering
WWYTE SCADA System Upgrades
Page 2 of 6
L Observing and reporting perfor-
mance and qualifying tests required by
specifications.
i Keeping daily records of construc-
tion progress and compiling same into
progress reports for submission to the
OWNER and DIVISION.
k. Verifying and keeping records of
construction items of work accomplished.
for use.as a basis of checking contractors’
monthly estimates.
L Consultation and advice during
construction.
m. Determination of need for and
preparation of change orders for approval
by the OWNER and DIVISION based on
conditions found during construction
and/or additions or modifications to the
-work requested by the OWNER and ap-
proved by the ENGINEER and the DIVI-
SION and implemented at a price recom-
mended by the ENGINEER as equitable.
For change order items exceeding
$10,000, the ENGINEER shall prepare an
independent cost estimate.
n. Determination of “equality” for
substitution of materials and equipment
specified and securing DIVISION ap-
proval thereof.
p. Preparation of application, support-
ing and associated documents for Federal,
State, and other grant or loan programs,
including monthly reimbursement re-
quests.
q. Preparation of certificate of sub-
stantial completion and contract comple-
tion.
r. Assist the OWNER in obtaining the
required project related approvals of State
and Federal agencies.
08/20/07