FF y Fe
ge Sumy Wh toe,
AD 7 OD
BY JOHNSON CONTROLS
]
a
°
BY JOHNSON CONTROLS
BID DATE: 40/1 9/2017
PRGJECT: Nashua WTP GUOTE & I7JRC - Nashua WWTP -- 06-03
yO: CAG Mechanical
ATTN: Rob DeCesare
CHANGE ORDER
i JOHNSON CONTROLS PACKAGED ROOF TOP UNIT
PHASE 7
o CRTU-1
Hoi Gas Bypass —~ Factory Installed Rawal Valve
«» Engineer requested change (not listed on plans or equipment spec
« Dual enthaipy economizer
e Engineer requesied change (single enthalpy specified)
o CRTU-2
* Dual enthalpy economizer
« Enginear requested change (single enthalpy specifisd)
= Powered convenience outlet
« . Engineer requested change (non-powered specified)
Cosi for Changes to CRTU-1 & CRTU-2 $3,673.06
PHASE IF
e CRTU-3
* Dual enthalpy economizer
e Engineer requested change (single enthaipy specified}
# Powered convenience outlat
» Engineer requested change (non-powered specifies)
Cost for Chan i U-3 $550.00
Respectfuily,
Jason Cullen
Sales Engineer
New Hampshire
Johnson Controls, inc.
$15 HOLT AVE Company CONFIDENTIAL
MANCHESTER, NH 03708 YORKwoarxs 17.0414
Bic A
PHonwa: 603-845-6528
FAx: 603-222-2422
Printen: 10/20/2017 2:08 PBA