Mark A. Mirley Electric
10/27/2017
Dan Callahan
Vice President
Monadnock Commercial Building Co.
32 Fitzgerald Drive
Unit 10
Jaffrey, N.H. 03452
Job Name: Nashua Wastewater Treatment Plant, Nashua NH.
Material Breakdown
Below is the material breakdown for the CRTU-1 make up heat proposal of 10/19/2017
Materials:
200° 1” Aluminum Rigid Conduit
700° #8 XHHW Wire
230’ #10 THWN
i 30 Amp 3 Pole Motor Control Breaker
1 30 Amp 3 Pole NEMA 12 Disconnect
8 Fire Stop Sleeves (7 Walls & 1 Floor)
8 Core Holes (7 Walls & 1 Floor)
Assorted Support Hardware & Fittings
Material Cost: $5,725.00
15% Mark Up $859.00
Total Material Cost: $6,584.00
If you have any question please let me know.
Thanks,
Mark Mirley
41 Elm Street, Unit #8, Stoneham, Ma. 02180
Office #: 781-438-0909 Fax #: 781-835-0018
Email: mirlevelectric@-verizon net