01710-2
PROJECT CLEANING
Control of Hazards:
1. Store volatile wastes in covered metal containers, and remove from premises
daily.
2. Prevent accumulation of wastes which may create hazardous conditions.
3. Provide adequate ventilation during use of volatile or noxious substances.
Disposal:
1. Donot burn or bury rubbish and waste materials on project site.
2. Donot dispose of volatile wastes, such as mineral spirits, oil, or paint thinner, in
storm or sanitary drains.
3. Do not dispose of wastes into streams or waterways.
Final Cleaning:
1. | Employ experienced workmen, or professional cleaners, for final cleaning.
2. Remove grease, dust, dirt, stains, labels, fingerprints, and other foreign
materials, from all sight-exposed interior and exterior finished surfaces.
Repair, patch and touch up marred surfaces to specified finishes.
Broom clean paved surfaces.
Rake clean non-paved surfaces of the project site.
Restore to their original condition those portions of the site not designated for
alterations by the Contract Documents.
Nn Y&
END OF SECTION
13089K