SECTION 01710
PROJECT CLEANING
PART 1 - GENERAL
1.1 DESCRIPTION
A. Work Included:
1.
2.
Maintain premises and public properties free from accumulations of waste,
debris, and rubbish, caused by operations.
At completion of work, remove waste materials, tools, equipment, machinery
and surplus materials, and clean all sight-exposed surfaces. Leave project clean
and ready for use.
1.2 QUALITY ASSURANCE
A. Requirements of Regulatory Agencies: Conduct cleaning and disposal operations in
accordance with all applicable local and state laws, ordinances, and code
requirements.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Use only cleaning materials recommended by manufacturer of surfaces to be cleaned.
B. Use cleaning materials only on surfaces recommended by cleaning material
manufacturers.
PART 3 - EXECUTION
3.1 PERFORMANCE
A. Cleaning During Construction:
1.
wo
Execute cleaning operations to ensure that buildings, grounds, and public
properties are maintained free from accumulations of waste materials and
rubbish.
Entirely remove and dispose of material or debris during the progress of the
work that has washed into or has been placed in watercourses, ditches, gutters,
drains, catch basins, or elsewhere as a result of the Contractor's operations.
Wet down dry materials and rubbish to lay dust and prevent blowing dust.
At reasonable intervals during the progress of work, clean the site and dispose
of waste materials, debris, and rubbish.
Clean interiors of buildings, when applicable, prior to finish painting, and
continue to clean on an as-needed basis until buildings are ready for occupancy.
Handle materials in a controlled manner with as few handlings as possible. Do
not drop or throw material from heights.
When applicable, schedule cleaning operations so that dust and other
contaminants resulting from the cleaning process will not fall on wet, newly
painted surfaces.
13089K