SECTION 01150

MEASUREMENT AND PAYMENT

PART 1 — GENERAL

1.1

A.

SUMMARY

Under the price specified to be paid for each item, the Contractor shall furnish all
labor, materials, equipment, plant, and perform all operations to complete all work as
indicated and specified. All supervision, overhead items, bond and permit costs,
protection and precautions and all other costs, incidental to the construction work,
complete, and as specified, are also included.

Finance Committee - Agenda - 5/17/2017 - P255

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P255

15. Construction Crews

The Contractor shall not increase the number of construction crews assigned to the work
without providing one-week advance notice to the Engineer.

END OF SECTION

01140-4

Finance Committee - Agenda - 5/17/2017 - P254

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P254

11.

12.

13.

14.

Cutting, Fitting and Patching

The Contractor shall do all cutting, fitting, or patching of his work that may be required to
make its several parts come together properly and fit it to receive or be received by work
of other Contractors, as shown upon or reasonably implied by the drawings and the
specifications for the completed structure, including all existing work.

Finance Committee - Agenda - 5/17/2017 - P253

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P253

5.

10.

Dimensions of Existing Structures

Where the dimensions and locations of existing structures are of critical importance in the
installation or connections of new work, the Contractor shall verify such dimensions and
locations in the field before the fabrication of any material or equipment which is
dependent on the correctness of such information.

Occupying Private Property

Finance Committee - Agenda - 5/17/2017 - P252

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P252

SNIAWP WN

SS ee eS eS KE CO
ARON S)

3.

SECTION 01140
SPECIAL PROVISIONS

General

Excess Material and Hazardous Material
Water for Construction Purposes

Pipe Location

Dimensions of Existing Structures
Occupying Private Property

Existing Utility Locations - Contractor's Responsibility
Coordination of Work

Time for Completion of Contract
Maintenance of Trench Surface

Cutting, Fitting and Patching

Protection of Aquifer

Contractor’s Representative

Finance Committee - Agenda - 5/17/2017 - P251

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P251

13.

14.

15.

Electric Service

A. The Contractor shall make all necessary applications and arrangements and pay for all
fees and charges for electrical energy for power and light necessary for the proper
completion of this contract during its entire progress. The Contractor shall provide
and pay for all temporary wiring, switches, connections, and meters.

B. There shall be sufficient electric lighting so that all work may be done ina
workmanlike manner where there is not sufficient daylight.

Hazardous Waste

Finance Committee - Agenda - 5/17/2017 - P250

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P250

10.

11.

12.

B. Any errors, defects or omissions in the execution of the work or in the materials
furnished by the Contractor, even though they may have been passed or overlooked
or have appeared after the completion of the work, discovered at any time before the
final payment is made hereunder, shall be forthwith rectified and made good by and
at the expense of the Contractor and in a manner satisfactory to the Engineer.

Finance Committee - Agenda - 5/17/2017 - P249

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P249

Protection and Relocation of Existing Structures and Utilities

A.

All existing buildings, utilities, pipes, poles, wires fences, curbing, property line
markers and other structures must be preserved in place without being temporarily
or permanently relocated, shall be carefully supported and protected from damage
by the contractor. Should such property be damaged, it shall be restored by the
Contractor, at no additional cost to the Owner.

Finance Committee - Agenda - 5/17/2017 - P248

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P248

Maintenance of Traffic

A.

G.

Unless permission to close the street is received in writing from the proper authority,
all excavated materials and equipment shall be placed so that vehicular and
pedestrian traffic may be maintained at all times. All traffic control plans must be
submitted to the City of Nashua’s Traffic Department (with a copy to the Engineer)
for review and approval.

Finance Committee - Agenda - 5/17/2017 - P247

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P247

Easements

A. As indicated on the drawings, the work may be located in easements obtained or
owned by the Owner. The Contractor has no rights outside of the easements unless
they are obtained from the property owner.

B. Contractor shall schedule work so that it will cause minimum inconvenience and
nuisance to abutting property owners, over the shortest possible time.