Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P250

Finance Committee - Agenda - 5/17/2017 - P250

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
250
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

10.

11.

12.

B. Any errors, defects or omissions in the execution of the work or in the materials
furnished by the Contractor, even though they may have been passed or overlooked
or have appeared after the completion of the work, discovered at any time before the
final payment is made hereunder, shall be forthwith rectified and made good by and
at the expense of the Contractor and in a manner satisfactory to the Engineer.

C. The Contractor shall reimburse the Owner for any expense, losses or damages
incurred in consequence of any defect, error, omission or act of the Contractor or his
employees, as determined by the Engineer, occurring previous to the final payment.

Sanitary Regulations

Sanitary conveniences for the use of all persons employed on the work, properly screened
from public observation, shall be provided in sufficient numbers in such manner and at
such locations as may be approved. The contents shall be removed and disposed of in a
satisfactory manner, as the occasion requires. The Contractor shall rigorously prohibit the
committing of nuisances within, on or about the work. Any employees found violating
these provisions shall be discharged and not again employed on the work without the
written consent of the Engineer. The sanitary conveniences specified above shall be the
obligation and responsibility of the Contractor. They shall not be located on private
property unless written authorization from the property owner has been provided to the
Engineer.

Safety and Health Regulations

This project is subject to the Safety and Health regulations of the U.S. Department of
Labor set forth in 29 CFR, Part 1926, and to New Hampshire law, RSA, Title XXIII:
Labor. Contractors shall be familiar with the requirements of these regulations.

Site Investigation

The Contractor acknowledges that he has satisfied himself as to the conditions existing at
the site of the work, the type of equipment required to perform this work, the quality and
quantity of the materials furnished insofar as this information is reasonably ascertainable
from an inspection of the site, as well as from information presented by the drawings and
specifications made a part of this contract. Any failure of the Contractor to acquaint
himself with available information will not relieve him from the responsibility for
estimating properly the difficulty or cost of successfully performing the work. The Owner
assumes no responsibility for any conclusion or interpretation made by the Contractor on
the basis of the information made available by the Owner.

The Contractor shall be responsible for verifying and determining the location, size,
direction of flow (if applicable) and elevation of all existing utilities, shown or not shown
on the plans. Every effort has been made to accurately depict the existing sewer system,
including sewer services. However, due to the age of the system, there are no records for
some sewer services as indicated on the plan set. These situations, including other
unknown pipes encountered during excavation, may require additional investigations. The
City may avail staff and equipment to aid in the investigation. Considerations for delay
costs shall only be given in extreme circumstances.

01110-5

Page Image
Finance Committee - Agenda - 5/17/2017 - P250

Footer menu

  • Contact