Finance Committee - Agenda - 5/17/2017 - P266
Work shall furnishing all materials, labor, tools, and equipment necessary and for
excavation, backfilling, testing; and installation of the flow-able fill, as indicated
on the Drawings or as directed by the Engineer. The contractor shall open a hole
to the pipe elevation at the other end of the fill, if none exists, to ensure the entire
pipe has been filled with the concrete.
Work shall conform to the City of Nashua Standard Specifications Sewers &
Drains (Appendix A).