Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P263

Finance Committee - Agenda - 5/17/2017 - P263

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
263
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

2.02

II. Additional Terms

1. Contractor must submit the complete Railroad Protective Liability
policy, Certificates of Insurance and all notices and correspondence
regarding the insurance policies to Pan Am _ Railways, Real Estate
Department.

Neither Agency nor Contractor may begin work on or about PAR property
until approval of the required insurance has been received from PAR.

SEWER BUILDING CONNECTION SYSTEMS:
WYES & TEES:

The number of wyes and tees to be paid for under this item shall be equal to the
actual number installed.

The unit price shall constitute full compensation for furnishing all labor, tools,
equipment and materials necessary for installing the wyes and tees; and all other
work necessary to complete the watertight connection excluding the cost of
straight pipe.

Connection for a service line to a CIPP pipe shall be by using a Romac coupling
(if sizing is available for the pipe diameter) or an Inserta tee. Payment this item
shall included all labor, material and equipment needed to core into the existing
pipe to make a round, uniform opening for the Romac coupling or inserta tee.
The same cost shall apply whether the connection is for a 6-inch sewer service
line or a 12-inch PVC drain line. This work will be paid by Item 2f.

The work shall be paid for at the contract unit price each under Items 2g, 2h, 2k
and 21 for wyes.

PVC SEWER SERVICE CONNECTION:

The number of sewer service connection replacements to be paid for under this
item shall be the actual linear footage replaced. All sewer service connections
encountered during the Contractor's excavation for the replacement of sewer
mains under this contract shall be replaced. The contractor shall determine the
location of each sewer service for each property along the project limit prior to
beginning sewer main construction. In certain situations it may be necessary to
locate the sewer service using test pits under pay Item 4a.

The unit price for the replacement of sewer service connections shall constitute
full compensation for furnishing all materials, labor, tools, and equipment
necessary to replace each existing sewer service connection with PVC from the
wye branch of the main sewer to the existing curb line or back of sidewalk as
shown on the plans or directed by the Engineer, including reconnection to the

01150-8