Finance Committee - Agenda - 5/17/2017 - P426
SECTION 02800
MANHOLE REHABILITATION
PART 1 - GENERAL
1.01
A.
1.02
1.03
SCOPE OF WORK:
Provide all labor, materials, accessories, equipment, tools, and incidentals required to
renabilitate and test manholes as shown on the Drawings and as specified herein,
including surface preparation, flow diversion, inflow control, invert and channel
reconstruction, internal lining, chimney seals, and pipe connections.