Finance Committee - Agenda - 5/17/2017 - P426

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P426

SECTION 02800

MANHOLE REHABILITATION

PART 1 - GENERAL

1.01

A.

1.02

1.03

SCOPE OF WORK:

Provide all labor, materials, accessories, equipment, tools, and incidentals required to
renabilitate and test manholes as shown on the Drawings and as specified herein,
including surface preparation, flow diversion, inflow control, invert and channel
reconstruction, internal lining, chimney seals, and pipe connections.

Finance Committee - Agenda - 5/17/2017 - P425

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P425

No mark-up for Field Inspector services will be allowed. Only
documented NSTAR invoice amounts will be reimbursed to the
Contractor.

END OF SECTION

02769-18

Finance Committee - Agenda - 5/17/2017 - P424

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P424

D.

Item 4,

Item 5,

Ttem 6,
Hours

The unit price shall also include all other appurtenant materials and
work incidental thereto and not specifically included for payment
under other items.

Measurement for payment will be per connection and as approved by
the Engineer.

Excavation for Pneumatically Assisted Sliplining Pits

Finance Committee - Agenda - 5/17/2017 - P423

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P423

PART 4 — Measurement and Payment

4.1 SUMMARY

A.

Measurement and payment for all additional items included in this
Construction Change Directive shall be as described in Section 01025
Measurement and Payment of the Contract Documents.

4.2 ITEM DESCRIPTIONS

A.

B.

C.

Item 1,

1.

Item 2,

Item 3,

Pneumatic Hammer Assisted Sliplining

Finance Committee - Agenda - 5/17/2017 - P422

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P422

3.5

3.6

plug, one to attach a gauge for reading the air pressure in the sealed
line, and one to introduce air into the sealed line.

Low pressure air shall then be introduced into the sealed line until
the internal air pressure reaches 4.0 psig greater than the average
back pressure (the design groundwater pressure) on the pipe. At
least two minutes shall elapse to allow the pressure to stabilize.

Finance Committee - Agenda - 5/17/2017 - P421

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P421

3.4

C.
1.
2.
3.
4.
TESTING
A.

The contractor shall utilize a manufactured hardened steel host
pipe expansion head sized so that the expansion head forces and
internal host deflections away from passing HDPE renewal pipe, to
facilitate installation in a partially deflected host pipe.

Segmental Static Sliplining

During installation the Contractor shall pull the renewal pipe into
place utilizing a constant tension, variable speed pulling frame.
The frame shall:

Finance Committee - Agenda - 5/17/2017 - P420

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P420

force that can be exerted on the pipe without damaging the
integrity of the pipe or pipe joints. The installation head or
mechanism shall incorporate a gauging system, which will provide
a continuous monitor of the force being applied during the liner
insertion operations. The insertion force used by the Contractor
shall in no case exceed the maximum allowable pushing or pulling
force as calculated in the liner pipe design. Pipe spigots shall be
provided with “homing” marks to ensure that the joint is properly
completed.

Finance Committee - Agenda - 5/17/2017 - P419

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P419

responsible for dewatering of each shaft. The shaft(s) shall be removed
and backfilled as soon as practical upon completion of the liner pipe and
the surface restored in accordance with the applicable provisions of these
specifications.

Finance Committee - Agenda - 5/17/2017 - P418

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P418

of the existing pipe; it shall be the Contractor’s responsibility to
install the renewal pipe to result in an acceptable grade without the
sag. The Contractor shall take in necessary measures to eliminate
these sags, as approved by the Owner by pipe renewal; digging a
sag elimination pit and bringing the bottom of the pipe trench to a
uniform grade in line with the existing pipe invert or by other
measures that shall be acceptable to the Owner.

Finance Committee - Agenda - 5/17/2017 - P417

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P417

Prior to construction and delivery of materials, the Contractor shall obtain
the necessary permits and details or traffic flag persons, as appropriate.

1.

It is the intent of this contract that traffic be maintained at all times
in the areas of construction. The Contractor may be required to
halt operations and/or transport material to areas beyond immediate
work locations in order to allow minimum traffic disruptions.
Access to the site by emergency vehicles, school buses, and
residents shall be maintained at all times.