NOTICE TO PROCEED

DATED:

TO:

(Contractor)

ADDRESS:

OWNER’S CONTRACT NO.

PROJECT:

(Insert name of Contract as it appears in the Bidding Document)

You are notified that the Contract Times under the above contract will commence to run on
20 . By that date, you are to start performing your obligations under the
Contract Documents. In accordance with Article 4 of the Agreement, the dates of Substantial
Completion and Final Completion are and
respectively.

Finance Committee - Agenda - 5/17/2017 - P435

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P435

SECTION 02930

DETECTABLE WARNING AT HANDICAP RAMP

SCOPE

A curb ramp shall have a detectable warning. The detectable warning shall extend the full
width of the curb ramp (exclusive of flared sides) and shall extend either the full depth of
the curb ramp or 24 inches (610 mm) deep minimum measured from the back of the curb
on the ramp surface.

MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/17/2017 - P434

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P434

chimney seals or liners. Contractor shall perform holiday detection testing in the presence
of an inspector with test equipment appropriate for the product. All detected holidays
shall be marked and repaired by abrading the coating surface with grit disk paper or
another hand-tooling method. After aorading and cleaning, additional coating shall be
hand-aoplied to the repair area as needed. All touch-up/reoair procedures shall be in
accordance with the coating manufacturer's recommendations. All verification and

Finance Committee - Agenda - 5/17/2017 - P433

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P433

3.07

Changes in direction of flow or sewer centerline within a manhole shall be made by
forming the flow channel along a smooth curve with as long of a radius as the inside of
the manhole will allow.

Bench shall slope toward invert as shown on the Rehabilitation of Existing Manhole detal|
on Drawing DO2 for proper drainage to the invert channel.

Benches shall be built up to a height as shown on the Rehabilitation of Existing Manhole

detail on Drawing DO2 for the entering and exiting pipes and shall be given a uniform
wood float finish.

Finance Committee - Agenda - 5/17/2017 - P432

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P432

3.05

materials handling, mixing, environmental controls, working time, working temperature,
pot life, allowable time between coats (recoat time), safety, and spray equipment. A
permanent identification and date of work performed shall be affixed to the structure in a
readily-visible location, and a final written report shall be provided to Owner and
Engineer detailing the location, date of report, and description of liner installation.

Finance Committee - Agenda - 5/17/2017 - P431

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P431

3.03

Active leaks shall be stopped with chemical or hydraulic sealants or cements prior to
installation.

All aveas to be sealed shall be dry, clean, and free of dust, dirt, sand, and othe
contaminants prior to installation. A torch may be required to ensure a dry surface.

Finance Committee - Agenda - 5/17/2017 - P430

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P430

Spray System by Warren Environmental, Inc., or Engineer-aoproved equal. Epoxy or
polyurethane coating shall meet the following requirements at aminimum:

1. Shore D Hardness: 85 (per ASTM D2240)
2 Compressive Strength: 12,000 psi (per ASTM D695)

3. Tensile Strength: 6,800 psi (per ASTM D638)

4. Flexural Strength: 11,000 psi (per ASTM D790)

5 Finished Dry Thickness: 125 mils

6. Adhesion to Concrete: Substrate failure (per ASTM D7234)

Finance Committee - Agenda - 5/17/2017 - P429

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P429

infiltration of groundwater through the manhole walls and morta’ joints, and to be
structurally caoable of withstanding the pressure of groundwater based on the depth of the
specific manhole being lined.

Finance Committee - Agenda - 5/17/2017 - P428

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P428

2. Name(s) of all supervisory personnel that will be directly involved in the Project

3. Proposed product information showing compliance with the specified
requirements listed herein, including chimney seal, grout, and internal liner
material, and the respective manufacturer’ s installation instructions.

4. Documentation of certification of the Contractor, specialty technician, and/or
installer by the product manufacturer and/or its authorized representative

Finance Committee - Agenda - 5/17/2017 - P427

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P427

1.05

10.

11.

12.

13.

14.

ASTM D624 Standard Test Method for Tear Strength of Conventional
Vulcanized Rubber and Thermoplastic Elastomers

ASTM D638 Standard Test Method for Tensile Properties of Plastics

ASTM D695 Standard Test Method for Compressive Properties of Rigid
Plastics

ASTM D790 Standard Test Methods for Flexural Properties of
Unreinforced and Reinforced Plastics and Electrical
Insulating Materials

ASTM D2240 Standard Test Method for Rubber Property — Durometer
Hardness