Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P423

Finance Committee - Agenda - 5/17/2017 - P423

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
423
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

PART 4 — Measurement and Payment

4.1 SUMMARY

A.

Measurement and payment for all additional items included in this
Construction Change Directive shall be as described in Section 01025
Measurement and Payment of the Contract Documents.

4.2 ITEM DESCRIPTIONS

A.

B.

C.

Item 1,

1.

Item 2,

Item 3,

Pneumatic Hammer Assisted Sliplining

Under the unit price for Item 1 of the work, the Contractor shall slip
line sewers as described above under Section 3.3.B Pneumatic
Hammer Assisted Sliplining. The unit price shall also include pre
post CCTV, flow bypassing, and all other appurtenant materials and
work incidental thereto and not specifically included for payment
under other items.

Measurement for payment will be by the linear foot of sewer
sliplined as approved by the Engineer as measured along the
horizontal projection of the centerline of the pipe from center to
center of manholes..

Segmental Static Sliplining

Under the unit price for Item 2 of the work, the Contractor shall slip
line sewers as described above under Section 3.3.C Segmental Static
Sliplining. The unit price shall also include pre and post CCTV, flow
bypassing, and all other appurtenant materials and work incidental
thereto and not specifically included for payment under other items.

Measurement for payment will be by the linear foot of sewer
sliplined as approved by the Engineer as measured along the
horizontal projection of the centerline of the pipe from center to
center of manholes.

Service Re-Connections

Under the unit price for Item 3 of the work, the Contractor shall re-
connect existing service connections after pneumatically assisted
sliplining the sewer. The unit price will include connecting the
service pipe to a wye branch, or other approved means of
connection, on the pneumatically assisted sliplined gravity sewer
main, transition couplings as required, restrained joints, and
furnishing and placing bedding material (crushed stone and/or sand).