Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 10/2/2019 - P21

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P21

From: Keating, William <KeatingW @nashuanh.gov>
Sent: Monday, September 23, 2019 1:11 PM

To: Bruce Kenney <bruce@tbuckconstruction.net>
Ce: Boucher, David <BoucherD@nashuanh.gov>; O’Connor, Carolyn <OConnorC@nashuanh.gov>; rgilbert@woodardcurran.cam
Subject: Change order 2 for Water Booster Station project

Bruce,

Finance Committee - Agenda - 10/2/2019 - P20

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P20

Attached is TBuck’s latest cost proposal for CO2 in the amount of 524,764.69. It is being review by consultant Woodard Curran and will likely require several
correspondence back and forth between consultant and contractor to verify costs are legitimate.

Finance Committee - Agenda - 10/2/2019 - P19

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P19

Kooken, Daniel

SececaeL sessed a |
From: O'Connor, Carolyn
Sent: Monday, September 23, 2019 1:41 PM
To: Griffin, John
Ce: Kooken, Daniel; Fauteux, Lisa; Carragan, Kathleen; Boucher, David; Keating, William
Subject: EMERGENCY APPROVAL Change order 2 for Water Booster Station project
Attachments: P-1D Relocate Valve.pdf
Importance: High
Hi John,

Finance Committee - Agenda - 10/2/2019 - P18

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P18

T. Buck Construction, Inc.

362 8 Aubum Road, Tumer, Maine
207-783-6223 * FAX 207-783-3970

PROPOSAL 1D

Proposal Submitted fo:

Phona: 978-492-0879

ls 9/20/2018

Mechan Trahan
We horeby submit apecifications and ostimale for:

Finance Committee - Agenda - 10/2/2019 - P17

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P17

Jim Donchess
Mayor e City of Nashua

To: Board of Aldermen

Filed With: Sue Lovering, City Clerk

From: Jim Donchess
Date: September 23, 2019
Re: Emergency PO Change Order Request — Change Order 2 for Water Booster Station

Project for WWTF for $24,765

Pursuant to 5-90 (G) of the NRO, | have’ authorized Emergency Purchase Order Change Order 2
for the Water Booster Station Project for WWTE i in an amount of $24.7 765 to T. Buck Construction
Inc. of Turner, ME for the work required. - ciate tes ih

Finance Committee - Agenda - 10/2/2019 - P16

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P16

SW Location:

The hole was cut in the existing slab in the location as shown on S-1201, see Picture 3 below. Conduit was
found in the slab. All conduit remaining or that was damaged during removal of slab shall be removed and
rerouted as required.

Picture 3: SW Foundation

SE Location:

Finance Committee - Agenda - 10/2/2019 - P15

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P15

(Nj) CONCRETE FOUNDATION
(E} PIPE TO REMAIN

(N) 3/8" BENT PLATE OR
2 J SPLIT HSS
=

Detail 1: Typical Pipe Reinforcement

WE Location:

The hole was cut in the existing CMU wall as shown on S-1401 and existing conduit was discovered, see
Picture 2 below, The conduit in the future location of the steel shall be removed and relocated.

Finance Committee - Agenda - 10/2/2019 - P14

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P14

NW. tion:

Two holes were cut in the existing slab at this location and existing conduit was discovered, see Picture |
below. One of the two hole will be used to create a new engine foundation and the other will be recast with
concrete, One of the holes was cut in the location shown in ECN-002 drawing S-1401 (left) and the other (right)
was cut in the slab to the east at the request of NWTF in an effort to move the foundation and engine frame out
of the access aisle and reduce the potential of.a tripping hazard.

Finance Committee - Agenda - 10/2/2019 - P13

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P13

WALDRON ENGINEERING & CONSTRUCTION INC.

FIELD REPORT
PROJECT NAME: | NWWTF ERU PROJECT NUMBER: | 359.01 DATE: | 9/30/2019
ARRIVAL | 0830 ETE TURE | 0930 PREPARED BY: M. Chadwick
Personnel on Site:

e¢ Mat Chadwick (Waldron)
e Don Hutchinson (Methuen)
e Bill Keating (NWTF)

Activities:

Waldron arrived on site at 0830 and met with Methuen at the Methuen trailer then proceeded to the Energy
Recovery Building to review items, NWTF met at the Energy Recovery Building.

Finance Committee - Agenda - 10/2/2019 - P12

By dnadmin on Mon, 11/07/2022 - 13:03
  • Read more about Finance Committee - Agenda - 10/2/2019 - P12

ey wi nla cre Pic | Lida ate bh Gabbe
Elected cal 397 Whittier Highway 9308 American Legion Hwy
Moultonbeora, NH 03254 Westport, MA 02790
installations. 1 Ine. 603-253-4525 568-636-9600
Tee Meclawiew, NE FAX 603-253-6284 FAX 508-636-8650

September 30, 2019

To: Don Hutchinson

Methuen Construction

Energy Recovery Project Time and (Viaterials work