Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/2/2019 - P15

Finance Committee - Agenda - 10/2/2019 - P15

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
15
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

(Nj) CONCRETE FOUNDATION
(E} PIPE TO REMAIN

(N) 3/8" BENT PLATE OR
2 J SPLIT HSS
=

Detail 1: Typical Pipe Reinforcement

WE Location:

The hole was cut in the existing CMU wall as shown on S-1401 and existing conduit was discovered, see
Picture 2 below, The conduit in the future location of the steel shall be removed and relocated.

It was determined that if the steel for the engine foundation was shifted to the south side of the penetration, as
shown in Picture 2, One (1) existing steel conduit can be avoided, see highlighted. Any other conduit should be
repaired if damaged and then can be cast in the wall with the new steel shape in accordance to the detail on S-
1401. This would require the “right” foundation at the NW location, see above, to extend to the south
approximately 4 inches to allow for the steel shape centerline to land on the centerline of the new foundation.

Existing steel
conduit

Estimated shifted
location of new sicel

Picture 2; NE wall penetration

Page 3 of 4