PROJECT NAME: | NWWTF ERU PROJECT NUMBER: | 359.01 DATE: | 9/30/2019
ARRIVAL | 0830 ETE TURE | 0930 PREPARED BY: M. Chadwick
Personnel on Site:
e¢ Mat Chadwick (Waldron)
e Don Hutchinson (Methuen)
e Bill Keating (NWTF)
Activities:
Waldron arrived on site at 0830 and met with Methuen at the Methuen trailer then proceeded to the Energy
Recovery Building to review items, NWTF met at the Energy Recovery Building.
The field review was to investigate electrical conduit discover in the slab and the internal CMU walls following
the start of the work done for the revised engine pad design captured in ECN-002. The following is a summary
of the conclusions of the field review. See Figure 1 for a snip from drawing S-1401 keying each of the impacted
locations:
l
6-4" NW 14") tid" WE
— (N} W8X18 —\———
= — — — — .———4
CALLED i 1 /
NORTH | '
13-0 14"l] 4-10 V8"
l [
I 1
1 1
Hk
a el) gh :
3 6 | iil -
= | =|!
1 al
z Zz
sw = SH
i I
1 i .
{ | PE
Ss :
(N) W8X18 +7
3 2" =
yg? 41-5 1a"
Figure 1: Location Key
Page 1 of 4