Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/2/2019 - P18

Finance Committee - Agenda - 10/2/2019 - P18

By dnadmin on Mon, 11/07/2022 - 13:03
Document Date
Fri, 09/27/2019 - 12:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/02/2019 - 00:00
Page Number
18
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100220…

T. Buck Construction, Inc.

362 8 Aubum Road, Tumer, Maine
207-783-6223 * FAX 207-783-3970

PROPOSAL 1D

Proposal Submitted fo:

Phona: 978-492-0879

ls 9/20/2018

Mechan Trahan
We horeby submit apecifications and ostimale for:

bank.
Subcontractors
Northeast Earth Mechanics
LABOR
Supervisor 20 hrs.
Operator 20 hrs.
Operator 20 hrs.
Laborer 20 hrs.
EQUIPMENT
Cat 315 excavator 20 hrs.
Komatsu Loader 20 hrs,
Tri-axie Dump truck 20 hrs.
trench box 1
TEST PIT
Northeast Earth Mech, 4 hrs,

EJ Prescott

Labor for tapping sleeve 1/2 day

(General Contractor

LABOR

Supervisor 3 hrs.

Saw cut pavement 60 LFF
EQUIPMENT

Compressor, hammer
MATERIAL

8" Ductile fron pipe

difference for 10"«8" tap& sleeve
difference far 10" Line stop

&" MJ Fitting

8" MJ Retainer glands

2" Rigid insulation

GC mark up en sub contractors

Northeast Mechanic cost
Ed Prescott cost

NOTE:

2) Price cogs not included any additional permits

ons

$ 100.90
§ 75.00
§ 76.06
§ 65.00
$ 95.00
$ 105,00
§ 30.06
$ 360,00
$545,44/hr

$ 356.52
$ 126.00
$ 5.00
$ 313.00
$ 459.00
$ 1,136.00
$ 4,462.00
$ 142.13
$ 55,15
S$ 40.00
$13,429.76
$356.52
$13,786.28

10% OP § 1,378.63

Woodard & Curran Fax:

Streat; Job Hame

40 Shattuck Road Suite 1£0 Nashua Suoster Pump Station
city, State & Zip Code: Jot Lecathon:

Andover MA Nashua, NH

Engineat:

r Phone:

$2,000.00
$1,500.00
$4,500.00
$4,300.00

$6,300.00

$4,900,00
$2,100.00
$ 600.00
5_ 360,00

34,960.00

$2.189,76

15% O8P

§ 375.00
3 200.00

3 313.00

S$ 459.00
$1,136.00
$4,462.00
3 14213
$ 110.30
$240.00

Provide labor, material and equipment to install inseria valve approximately 20° up stream from where contract drawings show it. The reason for
{ihe relocation is once the existing pipe was exposed we discavered 4 dresser coupling , 2 hi max coupling with spool piece from previous repair

of walerfine and a bell end of pipe. Nine feet of clear pipe is required in order to install inserta valve and line stop. Price includes trenching and
installing an additional 16° of pipe which will have to be installed under an exisling 8" waterline over another S" waterline and under a electrical duct

3 6,300.00

3 4,960.00

$ 2,469.76
$ 13,429.76
3 2.614.46
$

18.444.22 $15,444.22

356.52
53.46
416.00 $

tale uF

410.00

$6,549.43

15% O&8P 5 982.44

$7,531.84

4) If this proposal is excepted T Suck request a 10 day extension io the contract

$ 7,537.84

S$ 1,378.63

$24,764.69

Woe Propose hereby te furntsh malarial and labor completa in accordance with above sporifications, for the sum al:

IWENTY FOUR THOUSAND SEVEN HUNORED & SIXTY FOUR DOLLARS

is lobo at specified Al work laba completed ina
Profkmantke manner aceerdng to slanderd practices. Any alteration or
deviation from above specifications invelving exra costs wil be executed only
lupon written orders. and wil become sn autre charge over and above tha
otinals, Al agredenents conigent upon strikes, accidents a deteyt bey
four contral. Chwner ta carry Iie, lomada and ether nocostnry Insurance. Our

Jrorkers Bro huty covered by Ydorkman's Compensation Insurance.

Authorized
Signature

Gruce Kenney

Nolo: This proposal may be withdrawn

by us if not acceplod within

§ days.

Acceptance of Proposal- theabore prices. specifications nnd
hhe work as tpeccied. Payment wid be made as oxtined above,
Date of acceptance

Signature

Page Image
Finance Committee - Agenda - 10/2/2019 - P18

Footer menu

  • Contact