SW Location:
The hole was cut in the existing slab in the location as shown on S-1201, see Picture 3 below. Conduit was
found in the slab. All conduit remaining or that was damaged during removal of slab shall be removed and
rerouted as required.
Picture 3: SW Foundation
SE Location:
The hole was cut in existing CMU interior wall as shown on S-1401, See picture below. Based on the centerline
of the SW foundation, the new steel in this wall penetration should avoid existing conduit. Any conduit that was
damaged shall be repaired and/or removed and relocated. Remaining conduit and new steel for engine
foundation shall be cast into wall as shown on S-1401.
Estimated location of
new steel shape
fate See
Picture 4: SE wall penetration