Bidder Location
St Petersburg FLA
Roth IAMS and Canada
Burlington VT,
Cx Associates Portland ME
LLB Architects Pawtucket, RI
Dennis Mires Manchester, NH
designLAB architects Boston, MA
NY, NY and San Juan,
Marvel Architects Puerto Rico
Subcontractors listed
None
None, will use in-house staff
AMM Fogarty Cost estimating
Nitsch Engineering
Roome and Guarracino Engineering
Building Engineering Resources
Universal Environmental consultants
Le Messurier: Building envelope
Fitzmeyer and Tocci: HVAC
Lumen Studios: lighting
C3 (code assessment)
RFS engineering (mechanical and electrica
Building enclosure associates (envelope)
Harvey construction (costing) : optional
Harvey Construction (estimating)
Similar projects for firm/staff
Bid evaluation: facilities assessment
Proposal cost
$7,250
South Burlington library energy consultant $26,750
Vermont Dept. of buildings energy audit
Boston Public Health Commission $76,157
Littleton Town Hall, Littleton MA
Marion Town Administration Building
Extensive list of library projects, mostly feasibility studies
Nashua Community College Wellness center design $85,650
Littleton Opera house assessment
Amherst, NH police station assessment
Greater Nashua YMCA design
Bishop Guertin building envelope analysis
BPL McKim building master plan $95,730
Brandeis Goldfarb library assessment (Includes
Homer Babbidge Library (Uconn) : master plan, plaza study optional)
Phillips Exeter Academy library master plan
Brooklyn Public Library $117,380
Fitzmeyer and Tocci (mechanical systems) Snug harbor cultural center and Botanical Gardens
RWDI (building envelope)
Available unrestricted Trust funds as of 8/31: $ 127,000
YMCA Northeast Bronx
*not clear that these are assessments based on contract prices
Optional services
none listed
$3,875
blower door testing
none listed
none listed
Cost estimating: 9500
Telecom/Security: 3600
Structural engineer: 3600
Total optional: $13,000
none listed
Notes on process/experience
This company seems to misunderstand the project, their
proposal includes gathering data to hold in an asset management system
more like database entries than a comprehensive master plan
Firm specializes in energy consumption and efficiency, focus on energy audits
Promises a 30% savings in energy consumption
Scope focuses on energy efficiency, evaluating building envelope, lighting and HVAC for efficiency
Does not mention finishes, flooring, lighting design and bathroom fixtures, ADA compliance, etc.
Extensive experience with libraries, thorough plan including meetings with stakeholders before assessment begins
Scope mentions all areas of concern although it refers to details from a different project in another community
Thorough assessment covers all of the elements mentioned in the RFP as well as
as lighting recommendations and an ADA review. Mentions potential for solar PB,
plumbing upgrades and solutions for air handlers other than full replacement.
Costing would be based on recent projects and knowledge of the market
Great experience with assessing library buildings and master plans for same.
Thorough plan outline: kickoff, interviews, review of docs, bi-weekly status meetings
Offers Harvey Construction as optional for costing estimates; | would recommend we add that if we chose this vendor.
Thorough plan outline, includes grounds and recommended maintenance, lighting review as well as
all mechanical systems, windows and electrical systems. Costing provided by Harvey