Letter to Lisa Fauteaux
August 2, 2616
Page 3
o HKT will work with the cost estimator to clarify issues and develop
soft costs in order to produce a Total Project Cost Estimate that
can be presented to the Board of Aldermen.
o The City will be involved in the development of some soft costs.
o HA&T Structural cost estimating input and review relative to
structural steel frame and roof frarning is included in the in Task 2.
o Presentation of the estimate to the City.
TASK 4 — Final Summary Letier: HKT will provide a summary letter of the entire
process.
Consultants
The consultant effort for this phase includes work by Hoyle, Tanner and
Associates, civil and structural engineers, Maintenance Design Group, operations
and equipment, Nobis Engineering, geotechnical and environmental services and
Castagna Consulting Group, cost estimator. Spreadsheet with individual scopes,
hours and fees are attached. No other consultant work is planned during this
phase.
Proposed Fee
The fee for the scope of work listed above is based on hourly fees and anticipated
reimbursable expenses. Slab and foundation investigation and drilling have been
excluded in this phase and will be scheduled during a subsequent phase. The
following breakdown of hours per task is provided with expected reimbursable
expenses:
TASK 1
. TASK 2 TASK 4
Item erearemmns Concept = a = Summary
investigation Development Letter
HKT Architects, Inc.
Principal 56 48 8 12
Project Architect 42 98 4 24
Senior Designer 48 48 Q 0
Total $ Based on Standard
Hourly Rates $18,850 $25,450 $1,900 $5,100
Printing Costs at $900; Mileage at 90 miles per round trip - 9
Reimbursable Expenses trips equal $450 = $1,350
Maintenance Design Group
Senior Facility Design Manager 28 12 0 0
Facility Design Manger 86 QO 0 0
Project Assistant 19 0 0 0
Total $ Based on Standard
Hourly Rates $24,173 $2,784 $0 $0