Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 3271 - 3280 of 38765

Board Of Aldermen - Agenda - 6/14/2022 - P81

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
81
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

CLIENT RESPONSIBILITIES

Final Engineering Design Proposal 65-11-22

4920

Owner/Contractor contract documents (except technical documents) and/or
purchase order, in order to solicit for and enter into a construction contract with a
Contractor or Construction Manager.

Solicit, administer, and award bids for construction implementation of this project.

Provide construction administration and supervisions of Contractor or Construction
Manager.

Obtain federal, state, and local permits and approvals necessary for the
implementation of this work.

Pay permit fee(s) for the new boring plan State Wetlands Permit or any other permit
fees that may be required.

Issues dealing with hazardous materials.

TURNER

GROUP

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P81

Board Of Aldermen - Agenda - 6/14/2022 - P82

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
82
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

CONTRACT FORM

Please sign and return these originals as your acceptance of the above scope and terms,
including noted attachments, and your authorization to proceed. Please also provide a
purchase order or equivalent accounting number, if applicable, at the end of this letter in
order to allow us to proceed.

In the event the City (Client) issues a purchase order or other instrument related to TTG’s
(Consultant's) Services, it is understood and agreed to that such document is of the Client’s
internal accounting purpose only, and shall in no way modify, add to, or delete any of the
terms and conditions of the agreement. If the Client does issue a purchase order or other
similar instrument, it is understood and agreed to that the Consultant shall indicate the
purchase order number on the invoices sent to the Client.

We appreciate the opportunity to present this proposal and look forward to providing
continued assistance to the City with this project. If you have any questions, please do not
hesitate to contact John Lavigne at (603) 228-1122, ext. 149 or Gerard Blanchette at ext.
120.

Sincerely,

THE H.L. TURNER GROUP INC.

edn R. leauauen'y few Mockelo—

John R. Lavigne, Jr., PE, CFM Gerard R. Blanchette, PE, LEED*AP, NCEES
Lead Civil Engineer President
JRL/sai

Attachments: A-—Fee Summary Sheet
B — Fee Breakdown
C - Standard Fee Schedule & Payment Terms, January 1, 2022

TURNER
GROUP

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P82

Finance Committee - Agenda - 4/20/2022 - P27

By dnadmin on Sun, 11/06/2022 - 21:43
Document Date
Fri, 04/15/2022 - 11:50
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 04/20/2022 - 00:00
Page Number
27
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__042020…

a og |

QUALIFICATIONS & EXPERIENCE.

Lit
O
a
=
co
Lu
o.
x
Lu
o%
wa
Zz
g
te
L
\S)
re
=
=
=)
oO
4
O
-
UY
Wi
“

Page Image
Finance Committee - Agenda - 4/20/2022 - P27

Board Of Aldermen - Agenda - 6/14/2022 - P83

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
83
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

Attachment A

Fee Summary Sheet

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P83

Board Of Aldermen - Agenda - 6/14/2022 - P84

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

“Bas

Attachment A

Fee Summary Sheet
ic’ and “Additional” Services
Final Engineering Design

Item Fees

1. Basic Design ServiceS........ccssserssseccsssersseesssisereseriseeneneeteseonsscesreeeensestaee ..5286,340.00
2. Additional Services:

Al Geotechnical Analyses & Recommendation. ......cscccsseseesseceesees §$ 75,000.00

A.2 —_ Spot Field SUrVEYS......cscescressssssesreersessstsstesserentesstersesssetserteeenertts § 12,000.00

A3 Project Progress Meetings.........cccccsssscecsesnssseeseeesnarssensenseneees § 16,000.00

A.4 —-_— CM Cordination.........cssessssssesssseecrsssecseressecenevssececsnerssarsssrsenvens $ 15,000.00

OM AUrccarectsrereccetscsccesdicesceodvenrees $404,340.00

Final Engineering Design Proposal 05-11-22
4920

TURNER

GROUP

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P84

Board Of Aldermen - Agenda - 6/14/2022 - P85

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

:603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION WERE OURS. Ar
PM Structural PE 5r PD Tc HOURS
Segment 4 - Boardwalk Connector
4.1 - Scour, Debris & ice Loadings 4 16 2 22
4.2 - St I ign - Pile, ndation &
ructural Design - Pile, Foundation A 40 4 aa : a
Structural Details
4.3 - Final Engineering Plans & Specifications 8 50 4 60 4 126
TOTAL HOURS 16 90 24 80 & 218
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager {PM} 16 $ 150.00 $ 2,400.00
Structural Engineer (Structural) 90 5 185.00 S$ 16,650.00
Project Engineer (PE} 24 § 130.00 $ 3,120.00
Sr. Project Designer | (Sr PD) 30 $ 105,00 5 8,400.00
Technical Coordinator (TC} 8 $ 100.00 5 800.00
218 Total Fully Burdened Labor $ 31,370.00

Geotech Subconsultant $ -

Expenses

Estimated Direct Costs $

$200

200.00

TOTAL ESTIMATED COST= $ 31,570.00

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P85

Board Of Aldermen - Agenda - 6/14/2022 - P86

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301 = t: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
WORK HOURS TOTAL
TASK DESCRIPTION PM Structural PE Se PD iis HOURS
Segment 2 - Path & Riverbank Enhancements
2.1 - Substation Riverbank E&S Evaluation 8 24 I. ] 32
ll
I
Be Sot Lee pe Ope, or ee dee FL emiote| SREB Geet Tao Geile bce 24 ee diem O oat oe eee ee ee ee ee ee ee ee
a sees ee teed ee ee es ee ee ee) ee ee es get es es ee ee ee ee eee ee ee Oe ne ee ee i et es ee
TOTAL HOURS 8 0 24 0 0 32

ESTIMATED ENGINEERING COSTS

Work Estimated
Hours Hourly Rate Costs

Project Manager (PM) 3 $ 150.00 $ 1,200.00

Structural Engineer (Structural) 8] $ 185.00 5 .
Project Engineer (PE) 24 $ 130.00 $ 3,120.00

Sr, Project Designer | (Sr PD) 0 $ 105,00 5

Technical Coordinator (TC} 0 $ 100.00 $ .
| 32 | Total Fully Burdened Labor $ 4,320.00

Subconsultant S -
Expenses 5 100.00

Estimated Direct Costs $ 100,00
TOTAL ESTIMATED COST= $ 4,420.00

P:\4920 VHB - Nashua River Walk\Organization\Proposals\Final Engineering Design Proposai 05-11-22\Final Engineering
Estimate 05-11-22.xIsx 1 of 2

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P86

Board Of Aldermen - Agenda - 6/14/2022 - P87

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
87
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

The H.L. Turner Group Inc.

SSS EEE ——,

27 Locke Road Concord, NH 03301

: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION WEREHOUBS eu
PM Structural PE Sr PD re HOURS
Segment 3 - Substation Screening
Ba - Metal Screening Structure 4 24 a0 of 2 70
13.2 - Foundation Design 8 8
I Preiiminary completed) 8 36 2 46
Final Design 8 24 2 34
3.3 - Flood Resiliency Evaluation 8 24 2 34
?
Weta eae beta errr a NT or) RITET SE S| Oe ELT aaj 24 vou | Se 40 bes | as Bees | etene 192 %a0 6 |
TOTAL HOURS 36 84 24 40 8 192
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 36 $ 150.00 $ 5,400.00
Structural Engineer (Structural) 84 $ 185.00 $ 15,540.00
Project Engineer {PE} 24 $ 130.00 $ 3,120.00
Sr. Project Designer # (Sr PD) 40 $ 105.00 $ 4,200.00
Technical Coordinator (TC) 8 $ 100.00 $ 800.00
192 Total Fully Burdened Labor $ 29,060.00
Geotech Subconsultant $ :
Expenses $ 150.00
Estimated Direct Costs $ 150.00

TOTAL ESTIMATED COST =

$ 29,210.00

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P87

Board Of Aldermen - Agenda - 6/14/2022 - P88

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
88
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 63301

t: 603,228,1122 hiturner.com

Nashua Riverfront Development Project

Final Engineering Design

5/11/2022
TASK DESCRIPTION WCRRIGURS pOrAe
PM Structural PE Sr PD Te HOURS
Segment 5 - Multi-Use Path Connector eR a!
5.1 - Erosion & Scour Determination 8 20 2 30
ae a a a Oo Sah ae OU GE Oe Ge Ge ee Ce SS Ce Se ee eee cee ee ee eee eee eee ee ee eee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee
Pe 2a a Rea FS a ee FS ed a B RBIS NA ORES 20 | el OE Pate Rapes 30 Sv
|
TOTAL HOURS 8 0 20 fi] 2 30
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 8 S 150.00 $ 1,200.00
Structural Engineer (Structural) 0 $ 185.00 $ .
Project Engineer (PE) 20 $ 130.00 $ 2,600.00
Sr. Project Designer | (Sr PD) 0 $ 105.00 $ .
Technical Coordinator (TC) 2 $ 100.00 $ 200.00
| 30 | Total Fully Burdened Labor $ 4,000.00
Subconsultant S -
Expenses $ 100.00

Estimated Direct Costs $ 100.00

TOTAL ESTIMATED COST =

$ 7,100.00

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P88

Board Of Aldermen - Agenda - 6/14/2022 - P89

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

t 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION eS norat
PM Structural PE Sr PO Tc HOURS
Segment 6 - 53 Main Street Boardwalk
6.1 - Pile Redesign 2 24 6 16 2 50
6.2 - Verify 0.00 ft rise 4 24 2 30
6.3 - Structural Detailing 0
6.4 - £&S Evaluation 4 16 2
6.5 - Final Drawings & Specifications 8 40 4 64 4 120
Les, gun nym mm enter eu mee pT ne a ee
ee Se eee EISEN 1S Oa a OS BE TEN 20 SR SO ae a 10 Sree) 20089 |S
TOTAL HOURS 18 64 50 80 10 222
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 18 $ 150.00 $ 2,700.00
Structural Engineer (Structural) 64 5 185.00 5 11,840.00
Project Engineer (PE) 50 S$ 130.00 § 6,500.00
Sr. Project Designer i (Sr PD} 80 $ 105.00 $ 8,400.00
Technical Coordinator (TC) 10 5 100.00 5 1,000.00
222 Total Fully Burdened Labor $ 30,440.00

Subconsultant $ -
Expenses $ 200.00
Estimated Direct Costs $ 200.00

TOTAL ESTIMATED COST= $ 30,640.00

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P89

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 324
  • Page 325
  • Page 326
  • Page 327
  • Current page 328
  • Page 329
  • Page 330
  • Page 331
  • Page 332
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact