Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 32331 - 32340 of 38765

Board Of Aldermen - Minutes - 9/26/2017 - P8

By dnadmin on Sun, 11/06/2022 - 21:54
Document Date
Tue, 09/26/2017 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Tue, 09/26/2017 - 00:00
Page Number
8
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__092620…

Board of Aldermen — 9/26/17 Page 8

and if the whole way we’ve been doing things for 20 some years needs to be changed or re-evaluated that we
do that in the coming year.

Alderman Moriarty

| don’t expect you to know the numbers off the top of your head, but nevertheless, I’ll read this clearly.

5-135-A: It is the policy of the Board of Aldermen to maintain an undesignated general fund balance
as of each June 30 equal to a minimum of 10% of the municipality's fiscal year appropriations, plus
the statewide enhanced education amount, the local school net tax commitment, and the county
appropriation. That's English; that’s not French. It’s not German, it’s not accountees, it’s not
legalees. It’s English. There are four things that are easy to read in there. Tne numbers should exist
somewhere. Hopefully they exist somewhere, and hopefully somebody is willing to provide them at
some reasonable time.

President McCarthy

The first two of those that you read, Alderman Moriarty, refer to the totality of the school budget that’s
in the general fund budget. It’s what is provided by us to the school district and what the state
provides, which in total are the appropriations for the school department.

Alderman Deane

That’s correct. It was mentioned earlier about the issue we had with the health insurance back a
number of years. I’m of the understanding that our health insurance, just our working rates alone,
was underfunded by nearly $4 million previously that we had to make up the difference on. Is that
correct?

Mayor Donchess

You will recall that this year we increased the health budget. That was one the problems we had with
the budget. We increased the appropriation to health insurance by $3.6 million. That would for Fiscal
"18, the current year. We found that the working rates that had been estimated for Fiscal 17, and to
some degree Fiscal 16, were not adequate to meet the obligations. As you know, we have a reserve
account. In Fiscal ’17 and ’16, because the amount of health insurance that we had to pay out was
underestimated, we did draw down on the reserve. We now have $10 million in the reserve. We
didn’t want to draw down on that any further if we could avoid it. That’s why this year’s health
insurance appropriation went up $3.6 million so we would not hopefully touch the reserve any further.

Alderman Deane

Prior to you coming into office, how often and how much were those reserves drawn down on every
fiscal year?

Mayor Donchess

Not that much. | think at one point the reserve was $16 million, now it is $10 million. The
underestimate for 17 was significant. That’s why we had to increase the budget in Fiscal 18 by $3.6
million. Remember these are all estimates. We're self-insured so this is not like an insurance
company that insures the employees so you know exactly what your bill is. These are estimates that
are arrived at with the personnel and the consultant that the city has. They estimate going forward
what are our bills going to be for the coming year. Those estimates can be wrong because they are

Page Image
Board Of Aldermen - Minutes - 9/26/2017 - P8

Finance Committee - Agenda - 3/17/2021 - P451

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
451
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 615.033 - REMOVING TRAFFIC SIGN, TYPE C

A.

SCOPE

This work shall consist of removing existing regulatory, warning, and directional traffic
signs and sign supports as shown on the plans or as ordered by the Engineer.

MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor and equipment necessary for removing
traffic signs, including posts, foundations, bases and all necessary mounting hardware in
accordance with relevant provisions of Section 615 of the NHDOT Standard
Specifications, latest edition.

MEASUREMENT AND PAYMENT

Removing Traffic Sign Type C will be measured by each sign and post removed.
Payment for Traffic Sign Type C will be at the contract unit price per each, complete
removal, and shall include full compensation for material, equipment and labor to
complete this portion of the Bid Schedule. No payment will be made for removal of
signs replaced under other items.

Page 30 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P451

Finance Committee - Agenda - 3/17/2021 - P452

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
452
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 615.06 — TRAFFIC SIGN TYPE CC

A.

SCOPE

This work shall consist of furnishing and erecting regulatory and warning traffic signs
shown on the plans or as ordered by the Engineer.

MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor and equipment necessary for installing
traffic signs, and all necessary mounting hardware in accordance with relevant provisions
of Section 615 of the NHDOT Standard Specifications, latest edition.

MEASUREMENT AND PAYMENT

Traffic Sign Type CC will be measured by the square foot. Payment for Traffic Sign
Type CC will be at the contract unit price per each square foot, complete in place, and
shall include full compensation for removal of existing signs and posts where being
replaced by new signs, and for material, equipment and labor to complete this portion of
the Bid Schedule.

Page 31 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P452

Finance Committee - Agenda - 3/17/2021 - P453

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
453
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 616.191 — ALTERATION OF TRAFFIC SIGNALS — 360 DEGREE
TRAFFIC CAMERAS

A. SCOPE

This work shall include the labor and material for the installation of a GRIDSMART Video
Detection System. The GRIDSMART Video Detection System shall include GS2 Processor, 360
Degree Camera, Mounting Hardware, Data Module, Surge Protection, and CatSe Underground
Shielded Wire, and any additional hardware or software required for a complete installation in
accordance with manufacturer recommendations.

B. MEASUREMENT AND PAYMENT

This item will be measured and paid per each 360 GRIDSMART Camera installed. Payment
shall include all costs associated with purchasing and installing the camera.

Page 32 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P453

Finance Committee - Agenda - 3/17/2021 - P454

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
454
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 616.7 - LOCAL TRAFFIC LOOPS 6’ X 50’ (2-4-2 TURN)

A. SCOPE

This work consists of furnishing all labor, materials and equipment necessary to install the
quadruple loop detectors as directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

This item shall include all labor, materials and equipment necessary to install new quadruple
loop detectors 2-4-2 turn, in conjunction with the paving program. Loops shall be installed in the
pavement surface prior to final overlay or top course.

a. Installation shall be in accordance with the latest approved NHDOT Standard Details
and Specifications.

b. The City of Nashua will connect the new loop in the control panel if needed

c. Contractor will make connection in pull box. Contractor will solder, wire nut and
silicone seal connections for new loop at pull box. “Hockey puck” will not be used.

C. MEASUREMENT AND PAYMENT
Payment for this item shall be at the contract unit price specified for each. This payment shall
include all materials, labor, equipment, and all else needed to complete the work under this item

and make loops functional.

Contractor shall record the location of each loop. Quantities of loops shall be recorded per street.
Payment is contingent upon submittal of quantities in a per street format.

Page 33 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P454

Finance Committee - Agenda - 3/17/2021 - P455

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
455
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 618.6 - UNIFORMED OFFICERS
A. SCOPE

This work shall consist of furnishing uniformed officers, with or without vehicles, as required to
direct traffic through or around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified uniformed officers as per the latest approved NHDOT
Standard Specifications for Road Construction. Uniformed officers shall only be used when the
Engineer has previously approved it. Daily coverage needs to be approved by the Engineer.

C. MEASUREMENT AND PAYMENT
Uniformed Officers will be measured by the actual number of hours authorized, as determined
by the Engineer. This item has a budgeted allowance as shown on the Bid Form. Payments to

Contractor will be made based on approved hours and resulting dollar amounts on Police
Department invoices and only after contractor’s proof of payment to Police Department.

Contractor shall record the number of hours for each officer used. Hours shall be recorded on a
per street basis. Payment is contingent upon submittal of quantities in a per street format.

Page 34 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P455

Finance Committee - Agenda - 3/17/2021 - P456

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
456
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 618.7 - FLAGGERS
A. SCOPE

This work shall consist of furnishing qualified flaggers, as required to direct traffic through or
around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified flaggers as per the latest approved NHDOT Standard
Specifications for Road and Bridge Construction. Daily coverage needs to be approved by the
Engineer.

C. MEASUREMENT AND PAYMENT

Flaggers will be measured by the actual number of hours authorized, as determined by the
Engineer. Payment shall be made at the contract price per hour.

Contractor shall record the number of hours for each flagger used. Hours shall be recorded on a
per street basis. Payment is contingent upon submittal of quantities in a per street format

substantiated with invoices from flagging subcontractor.

Payment will not be made for flaggers who are not equipped with appropriate equipment or who
do not follow standard practice in performing their duties.

Page 35 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P456

Finance Committee - Agenda - 3/17/2021 - P457

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
457
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 619.1 - MAINTENANCE OF TRAFFIC
A. SCOPE

This work shall consist of providing and maintaining safe and passable traffic accommodations
for public traffic and furnishing, erecting and maintaining necessary traffic signs, barricades,
lights, signals, delineators, concrete barriers, signs, and other traffic control warning devices
through the work zone. The contractor is responsible for preparing a work area that is free of
parked vehicles or other obstructing objects. This includes, but is not limited to, erecting “no-
parking” signs provided by the City of Nashua 3 days prior to paving and returning same signs as
directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required maintenance of traffic needs based on the Contractors daily operations in accordance
with the latest approved NHDOT Standard Specifications for Road and Bridge Construction, and
the latest approved MUTCD. At a minimum, the Contractor’s crew shall, at all times, carry Two
(2) of the following signs to be erected as the need may arise:

e ROAD WORK AHEAD (MUTCD W20-1)
e ONE LANE ROAD AHEAD (MUTCD W20-4)
e DIRECTIONAL ARROW SIGN (MUTCD W1-6)
e FLAGGER SIGN (MUTCD W20-7)
Contractor shall provide a minimum of 2 variable message signs for use on major roads.

Contractor shall be responsible for getting approved street opening permits, submitting traffic
control plans for all streets, obtaining lane closure or detour approval permits, and obtaining
emergency work permits.

The Contractor must notify, by email, the Engineer, and the City Solid Waste Department
Contact of specific types and locations of work. Notifications shall be provided the day before
work commences, during regular business hours (8am-5pm).

Engineer:
Mark Saunders

SaundersM@NashuaNH. gov

Solid Waste Department Contact:
Kevin Naro
NaroK@NashuaNH. gov

Page 36 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P457

Finance Committee - Agenda - 3/17/2021 - P458

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
458
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

C. MEASUREMENT AND PAYMENT

Maintenance of Traffic will be measured as a unit. Payment for maintenance of traffic shall be at
the contract lump sum, which lump sum includes full compensation for material, equipment and
labor to complete this portion of the Bid Schedule. The lump sum can only be amended by
written, approved change order. Progress payments towards the lump sum will be made
periodically based on the percent of the contract and the balance will be paid at final payment
upon completion of all project requirements. Should the contract be terminated prior to
completion, or the contract work not completed, total payment for this item shall be proportional
to the percentage of the contract completed.

Page 37 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P458

Finance Committee - Agenda - 3/17/2021 - P459

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
459
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 632 —- RETROREFLECTIVE PAVEMENT MARKINGS
A. SCOPE

This work shall consist of furnishing and placing white or yellow retro reflective paint pavement
markings and retro reflective thermoplastic pavement markings at locations shown on the plans
or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required placement of retro reflective paint and thermoplastic pavement markings in accordance
with the latest approved NHDOT Standard Specifications for Road and Bridge Construction, and
the latest approved MUTCD. A layout drawing shall be approved by the Engineer prior to any
work being done to the street.

Application temperature requirements shall be strictly enforced. Material placed outside
temperature requirements will not be accepted.

Striping shall match existing striping and be replaced in kind or as directed by the Engineer.
All stop bars, crosswalks and symbols shall be retro reflective thermoplastic and all long lines
shall be retro reflective paint.

C. MEASUREMENT AND PAYMENT

632.0104 Retroreflective Paint Pavement Marking,
Single Solid Line, 4in. Linear Foot

632.0112 Retroreflective Paint Pavement Marking,
Single Solid Line, 12in. Linear Foot

632.3112 Retroreflective Thermoplastic Pavement Marking,
Single Solid Line, 12in. Linear Foot

632.3118 Retroreflective Thermoplastic Pavement Marking, 18in. —_ Linear Foot

632.32 Retroreflective Thermoplastic Symbol Square Foot

Payment shall be per the unit listed above. Symbols will be paid for at the square footage listed
below:

Turn Arrow = 17 SF

Straight and Turn Arrow = 28.8 SF

Left/Through/Right = 40.25 SF

Straight Arrow = 12.5 SF

Only = 22.3 SF
Ahead = 31.3 SF
Stop = 22.2 SF

School = 34.7 SF

Page 38 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P459

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 3230
  • Page 3231
  • Page 3232
  • Page 3233
  • Current page 3234
  • Page 3235
  • Page 3236
  • Page 3237
  • Page 3238
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact