Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/17/2021 - P454

Finance Committee - Agenda - 3/17/2021 - P454

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
454
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 616.7 - LOCAL TRAFFIC LOOPS 6’ X 50’ (2-4-2 TURN)

A. SCOPE

This work consists of furnishing all labor, materials and equipment necessary to install the
quadruple loop detectors as directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

This item shall include all labor, materials and equipment necessary to install new quadruple
loop detectors 2-4-2 turn, in conjunction with the paving program. Loops shall be installed in the
pavement surface prior to final overlay or top course.

a. Installation shall be in accordance with the latest approved NHDOT Standard Details
and Specifications.

b. The City of Nashua will connect the new loop in the control panel if needed

c. Contractor will make connection in pull box. Contractor will solder, wire nut and
silicone seal connections for new loop at pull box. “Hockey puck” will not be used.

C. MEASUREMENT AND PAYMENT
Payment for this item shall be at the contract unit price specified for each. This payment shall
include all materials, labor, equipment, and all else needed to complete the work under this item

and make loops functional.

Contractor shall record the location of each loop. Quantities of loops shall be recorded per street.
Payment is contingent upon submittal of quantities in a per street format.

Page 33 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P454

Footer menu

  • Contact