Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/17/2021 - P459

Finance Committee - Agenda - 3/17/2021 - P459

By dnadmin on Mon, 11/07/2022 - 13:46
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
459
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 632 —- RETROREFLECTIVE PAVEMENT MARKINGS
A. SCOPE

This work shall consist of furnishing and placing white or yellow retro reflective paint pavement
markings and retro reflective thermoplastic pavement markings at locations shown on the plans
or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required placement of retro reflective paint and thermoplastic pavement markings in accordance
with the latest approved NHDOT Standard Specifications for Road and Bridge Construction, and
the latest approved MUTCD. A layout drawing shall be approved by the Engineer prior to any
work being done to the street.

Application temperature requirements shall be strictly enforced. Material placed outside
temperature requirements will not be accepted.

Striping shall match existing striping and be replaced in kind or as directed by the Engineer.
All stop bars, crosswalks and symbols shall be retro reflective thermoplastic and all long lines
shall be retro reflective paint.

C. MEASUREMENT AND PAYMENT

632.0104 Retroreflective Paint Pavement Marking,
Single Solid Line, 4in. Linear Foot

632.0112 Retroreflective Paint Pavement Marking,
Single Solid Line, 12in. Linear Foot

632.3112 Retroreflective Thermoplastic Pavement Marking,
Single Solid Line, 12in. Linear Foot

632.3118 Retroreflective Thermoplastic Pavement Marking, 18in. —_ Linear Foot

632.32 Retroreflective Thermoplastic Symbol Square Foot

Payment shall be per the unit listed above. Symbols will be paid for at the square footage listed
below:

Turn Arrow = 17 SF

Straight and Turn Arrow = 28.8 SF

Left/Through/Right = 40.25 SF

Straight Arrow = 12.5 SF

Only = 22.3 SF
Ahead = 31.3 SF
Stop = 22.2 SF

School = 34.7 SF

Page 38 of 43

Page Image
Finance Committee - Agenda - 3/17/2021 - P459

Footer menu

  • Contact