Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 29141 - 29150 of 38765

Finance Committee - Agenda - 6/6/2018 - P53

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
53
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

4 4 2 L
H
G
.
E
o
LEGEND
RAD ETX-102 i <
~ Citi Memoriiee “Weeden
~~ ——~t9rt00 BaseT
Cc
oo! SM Fiber
GCGW 63} -—
RF Shelter thes
. B
Teniiory 2
@ MOTOROLA SOLUTIONS — syseu tmieaing
Framingham, MA
Lams
Cities of Nashua/Manchester
K2 Core with MGC7500E Console System Diagram

A

= oe oF

am = oF
on uss or i span Pe le
5 : aoe ees er

12 NOT GIARANTERR IP RRAICED GR PNTARCED

Page Image
Finance Committee - Agenda - 6/6/2018 - P53

Finance Committee - Agenda - 6/6/2018 - P54

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
54
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

18/2018

®

af A
SOLUTIONS

SECTION 3

IMPLEMENTATION PLAN
3.1 STATEMENT OF WORK

Motorola will install and configure the proposed equipment. The following table describes the tasks involved with
installation and configuration.

Contract Finalization and Team Creation
Execute contract and distribute contract documents.
Assign a Project Manager as a single point of contact.

Assign resources.

Schedule project kickoff meeting.

Deliverable: Signed contract, defined project team, and scheduled project kickoff meeting.

Project Kickoff

Introduce team, review roles, and decision authority.
Present project scope and objectives.

Review SOW responsibilities and project schedule.

Schedule Design Review.

Deliverable: Completed project kickoff and scheduled Design Review.

Design Review

Present the system design and operational requirements for the solution.

Present installation plan.

Present preliminary cutover plan and methods to document final cutover
process.

Present configuration and details of sites required by system design.
Validate that customer sites can accommodate proposed equipment.
Provide approvals required to add equipment to proposed existing sites.
Review site safety, security, and access procedures.

Finalize site acquisition and development plan.

Review safety rules and procedures.

Present equipment layout plans and system design drawings.

Provide backhaul performance specifications and demarcation points.
Provide heat load and power requirements for new equipment.

Provide information on existing system interfaces.

Use or disclosure of this proposal is subject
to the restrictions on the disclosure page.

Motorola

Solutions

SSSR S

GVV8*G

O98

OPVG@VGRVDGOOGNGDNsB B

TLELLLEELTLL LETT TTL LUT ETAL ne eee eereeree teresa Es TUi li da di LL

OO08

O000

YVO0OOO008000 000

PCCP PETERS OPE ER EEE TTA ERR ETAT EE ee ee ee POR EOPOR ETOP EPEAT ETAT EEC EERE ROTTER EEE

Page 18

Page Image
Finance Committee - Agenda - 6/6/2018 - P54

Finance Committee - Agenda - 6/6/2018 - P55

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
55
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

@

MOTOROLA
SOLUTIONS

SO :

Solutions

Sols) wleeenes one Poa i

Review and update design documents, including System Description,
Statement of Work, Project Schedule, and Acceptance Test Plan, based on O
Design Review agreements.

Execute Change Order in accordance with all material changes to the ‘e)
Contract resulting from the Design Review.

Deliverable: Finalized: design documentation based upon “frozen* design, along with any relevant Change Order
documentation.

Site Access

Provide site owners/managers with written notice to provide entry to sites 0
identified in the project design documentation.

Maintain access roads in order to provide clear and stable entry to sites for

heavy-duty construction vehicles, cement trucks and cranes. Ensure that 0
sufficient space is available at the site for these vehicles to maneuver under

their own power, without assistance from other equipment.

Obtain site licensing and permitting, including site lease/ownership, zoning, OQ
permits, regulatory approvals, easements, power, and telco connections.

Deliverable: Access, permitting, and licensing necessary to install system equipment at each site.
Equipment Order and Manufactoring

Create equipment order and reconcile to contract. O
Manufacture Motorola Solutions-provided equipment necessary for system OQ

based on equipment order.
Deliverable: Equipment procured and ready for shipment.

Equipment Shipment and Storage

Provide secure location for solution equipment .

Pack and ship solution equipment to the identified, or site locations.

Receive solution equipment.

QeVeo
VGVOo8

Inventory solution equipment
Deliverable: Solution equipment received and ready for installation

General Installation

Deliver solution equipment to installation location. O
Coordinate receipt of and inventory solution equipment with designated OQ
contact.

Install of all proposed fixed equipment as outlined in the System Description

based upon the agreed-upon floor plans, connecting audio, control, and

radio transmission cables to connect equipment to the power panels or Y O
receptacles, and audio/control line connection points. Installation

performed in accordance with R56 standards and state/local codes.

Provide system interconnections that are not specifically outlined in the
system design, including dedicated phone circuits, microwave links, or other M) oO
types of connectivity.

POET REST RSET ERE EA ETT TET EEE REPEL EER EER Ree ee PAROS T TPT ETT TOTES ORE EERE ETTE

Use or disclosure of this proposal is subject
3152018 to the restrictions on the disclosure page. Page 20

Page Image
Finance Committee - Agenda - 6/6/2018 - P55

Finance Committee - Agenda - 6/6/2018 - P56

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
56
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

3/15/2018

@®

a A
SOLUTIONS

TL ET TTA LETT TURE LTT UL CU cn vee reresrere lees TLL TEL

oe Ne | Brea ae |

sn ety ek

Install and terminate all network cables between site routers and network
demarcation points, including micrewave, leased lines, and Ethernet.

8

Ensure that Type 1 and Type 2 AC suppression is installed to protect installed
equipment.

Q

Connect installed equipment to the provided ground system.
Label equipment, racks, and cables.

Perform preliminary audit of installed equipment to ensure compliance with
requirements and R56 standards.

Note any required changes to the installation for inclusion in the “as-built”
system documentation.

Q90
QO O000 0

Q &

Deliverable: Equipment installed.
Antenna transmissicn Line Installation
Install antennas, including supplying and installing new side arm mounts
Install towertop amplifiers.
Install transmission lines required for system.

Provide structure penetrations for transmission equipment (e.g. antennas or
microwave line.).

Perform sweep tests on transmission lines.

Provide and install attachment hardware for supporting transmission lines
on antenna support structure.

888s VsVgg
O00a 000

Deliverable: Antennas installed and grounded.
Console Installation.and Configuration

Identify circuits for connection to console and a demarcation point located
within 25 feet of the console interface.

8

Connect console to circuit demarcation points.

SS)

Install PC workstation w/ keyboard and mouse, and monitor.

Install a Voice Processor Madule (VPM) and purchased peripheral console
equipment in accordance with R56 standards and state/local codes.

Develop templates for console programming.

Qe 8
OO000 0

Perform console programming and configuration.
Deliverable: Console equipment installation completed.
Eentrol Station Installation-and Configuration

Provide the locations of control stations and desk sets at each site.

YO
O®8

Survey mounting locations and develop control station instaliation plan.

Provide adequate space, grounding, and power for the control station
installation.

8

Properly connectorize and ground the cabling, which will be run to the
outdoor antenna location using the least obtrusive method.

POR EERE EE ENTE EEE EL PETE EET OR Re ee OTP RRR EEOP EL T RETEST OTT TEETER TERETE TITER ETE

© O
O

Use or disclosure of this proposal is subject
to the restrictions on the disclosure page.

ee

Page #1

Page Image
Finance Committee - Agenda - 6/6/2018 - P56

Finance Committee - Agenda - 6/6/2018 - P57

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
57
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

3/15/2018

@

MOTOROLA
SOLUTIONS

. Motorola

ST Ties

Provide an elevated antenna mounting location, and adequate feed-line O

routing and support.

Install line (not greater than 100 feet in length) and antenna system A O

(connectors, coax grounding kit, antenna, and surge protection).

Install RF local control stations identified in the equipment list. O

Perform control station programming. O

Deliverable: Control station equipment installation completed.

Functional Acceptance Testing

Verify the operational functionality and features of the solution supplied by QO

Motorola Solutions, as contracted.

Witness the functional testing. O

Document all issues that arise during the acceptance tests. O

If any major task for the system as contractually described fails during the

Customer acceptance testing or beneficial use, repeat that particular task O

after Motorola Solutions determines that corrective action has been taken.

Resolve any minor task failures before Final System Acceptance. O

Document the results of the acceptance tests and present for review. O

Review and approve final acceptance test results. O
Deliverable: Completion of functional testing and approval by Customer.

Finalize Documentation and System: Acceptance

Provide manufacturer's installation material, part list and other related O

material to Customer upon project completion,

Provide an electronic as-built system manual on CD or other Customer

preferred electronic media. The documentation will include the following: ©

Site Block Diagrams. « Site Floor Plans. ¢ Site Equipment Rack

Configurations. * Antenna Network Drawings for RF Sites (where

applicable). * ATP Test Checklists. « Functional Acceptance Test Plan Test O

Sheets and Results. « Equipment Inventory List. * Console Programming

Template (where applicable). * Maintenance Manuals (where applicable). ¢

Technical Service Manuals (where applicable). Drawings will be delivered in

Adobe PDF format.

Receive and approve documentation. O

Execute Final Project Acceptance. VY

Deliverable: All required documents are provided and approved. Final Project Acceptance.

PPPOE RTE EERE REET TEER ee ee COOP PAPEETE RE ERT aT RTE

Use or disclosure of this proposal is subject
to the restrictions on the disclosure page.

Page 22

Page Image
Finance Committee - Agenda - 6/6/2018 - P57

Finance Committee - Agenda - 6/6/2018 - P58

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
58
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

@

MOTOROLA
SCLUTIONS

PEELE PTL TL LLL LT TTL EET LD rece conn eee reece eee TT TET LL LAL

SECTION 4

SUPPORT PLAN

To maintain The City's of Nashua and Manchester equipment, Motorola offers our standard commercial warranty as
set forth in the terms and conditions provided with our proposal.

POPPERS ECT OEP ET TERT ETRE EET EERE ee ee eee EPO T EET E REET ees

Use or disclosure of this proposal is subject
15/2018 to the restrictions on the disclosure page. Page 23

Page Image
Finance Committee - Agenda - 6/6/2018 - P58

Finance Committee - Agenda - 6/6/2018 - P59

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
59
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

@

MOTOROLA
SOLUTIONS

LED TTTT TT LATTE TL ULLAL te cannes seeerrerree ees TOT ULE TTT
SECTION 5

PRICING SUMMARY

The following table provides a pricing breakdown for the proposed equipment and services.

POPPER EEE EPEAT TREE ETE EEE ERR ERE ET TET ERD eee ee eRe ER EA TET TERRE RETA Rae

Use or disclosure of this propasal is subject
3/15/2018 to the restrictions on the disclosure page. Page 24

Page Image
Finance Committee - Agenda - 6/6/2018 - P59

Finance Committee - Agenda - 6/6/2018 - P60

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
60
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

(A) MOTOROLA
Manchester/Nashua EOC Equipment List/ITT57 Discounts Applied

APC MODEL DESCRIPTION Ory. uST DSCT.| BUNT BEX.
405|SQM01SUM0237 SINGLE ZONE CONV NON-RED CORE 1[$ 24,950.00 | 20%| $19,960.00 $19,960.00
425|CA02259AA ADD: Redundancy 1[$ 20,000.00 | 20%] $16,000.00 $16,000.00
183]CA01663AB ADD: RACK ys 495,00 | 10% $445.50 $445.50
207|DS9PXXROS0ONOO6S UPS, SPX, 9D0W, 120V, SOFTWIRED, 6 MIN RUNTIME RACK MOUNT 1)$ 1,673.00] 10%] $1,505.70 $1,505.70
207]/DSRMP615A SPD, TYPE 3, 120V RACK MOUNT, 15A PLUG-IN W/ (6) 154 NEMA 5-15 OUTLETS ays 258.00 | 10% $232.20 $464.40
947|D53770410000 ETX-102 2 NETWORK SFF PORTS, 4 PORT 10/100BT ETHERNET SWITCH 3] $ 647.00 | 15%) $549.95 $1,649.85
947|D51278020000 SFP SM, 1310NM, UP TO 15KM, LC, 1O0BASEFX OR STM1 31S 118,00 | 15%) §100.30 $300.90
947]DS1900550000 RM35/P2 RACK MCUNT KIT FOR 1/2 19 INCH, 2 DEVICE PER SHELF 1,5 44.00 | 15% $37.40 $37.40
947/D51900540000 RM-35/P1 RACK MOUNT KIT FOR 1/2 19 INCH, 1 DEVICE PER SHELF 11s 22.00 | 15%) $18.70 $18.70

0|DSFIBERJUMPER Misc Fiber Jumper - ST to LC 3]$ 1,000.00 | 10% $900.00 $2,700.00
454]7THN1012 RACK 7' CPEN 31 $ 470.00 | 31% $324.30 $972.90
9471053770410000 ETX-102 2 NETWORK SFP PORTS, 4 PORT 10/100BT ETHERNET SWITCH al 8 647.00 | 15%| $549.95 $1,649.85
947[DS1278020000 SFP SM, 1310NM, UP TO 15KM, LC, 100BASEFX OR STM1 3] $ 118.00 | 15% $100.30 $300.90
947Ds1900550000 RM35/P2 RACK MOUNT KIT FOR 1/2 19 INCH, 2 DEVICE PER SHELF ys 44,00 | 15% $37.40 $37.40
947[051900540000 RM-35/P1 RACK MOUNT KIT FOR 1/2 19 INCH, 1 DEVICE PER SHELF us 22.00 | 15%, $18.70 $18.70

O|DSFIBERIUMPER Misc Fiber Jumper - ST to LC 3/5 1,000.00] 10%| $800.00 $2,700.00
207]/DSOP820B PDU, 120V HARDWIRE (8) 20A OUTLET PDU WITH TYPE 3 SAD PROTECTION us 938.00 | 20% $750.40 $750.40
2071DS1101378 RACK MT ADAPTER PLATE, 19 IN FOR DSOP820B, DSOP820B2 & DSNSOP820B 1js 62,00 | 20%) $49.60 $49.60
147]SQM01SUMO0205 IGGM 3000 GATEWAY 3{$ 4,200.00] 20%] $3,360.00 $10,080.00
147/CA01519AA ADD: DC POWER 3| § - 20% $0.00 $0.00
147|CA020860A ADD: HIGH DENSITY ENH CONV GATEWAY al § 6,000.00 | 20%] $4,800.00 $14,400.00
656]L30URSSPW1 N APX CONSOLETTE 7/800 10] 5 4,554.00 | 27%] $3,324.42 $33,244.20
656/G806 ADD: ASTRO DIGITAL CAl OPERATION 10] $ 515.00 | 27%| 5375.95 $3,759.50
656/G43 NH: CONVENTIONAL OPERATION lo} $ 300.00 | 27% 5584.00 $5,840.00
656]G51 NH: SMARTZONE OPERATION APX 10} $ 1,500.00] 27%] $1,095.00 $10,950.00
656/G361 ADD: P25 TRUNKING SOFTWARE 10] $ 300.00 | 27% $219.00 $2,190.00
65616996 NH: OVER THE AIR PROVISIONING 10] 5 100.00 | 27% 573.00 $730.00
655]QA02018 ADD: ADVANCED WACN KEY SUPP DATA 10) $ 5.00 | 27% $3.65 $36.50
656| W797 JADD: DVP-XL ENCRYPTION APX7500 10] $ 487.00 | 27% $355.51 $3,555.10

Vigan Use or disclosure of this proposal is subject to the restrictions on the disclosure page.

Paye 2%

Page Image
Finance Committee - Agenda - 6/6/2018 - P60

Finance Committee - Agenda - 6/6/2018 - P61

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
61
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

656|c843 ADD: AES ENCRYPTION APX 10] $ 475.00 | 27% $346.75 $3,467.50
656| woes ADD: MULTIPLE KEY ENCRYPTION OPERATION 10] $ 330.00] 27% $240.90 $2,409.00
761 [i999 ADD: FULL FP W/05/KEYPAD/CLOCK/VU 10] $ 789.00 | 27% $575.97 $5,759.70
656/G90 ADD: NO MICROPHONE NEEDED 10] $ - 27% $0.00 $0.00
761|CA01942 ADD: DC CORD 10] $ 55.00] 27% $40.15 $401.50
185|GA00318 ADD: 5 YEAR SERVICE FROM THE START LITE 10] $ 319.00 | 0%| $319.00 $3,190.00
761] HKNG233C /APX CONSOLETTE RACK MOUNT KIT 1p] $ 200.00 | 27% $146.00 $1,460.00
351}DS0C80708 OMNI, CORPORATE COLLINEAR, 8 DBD, 746-870 MHZ, PIM & 25 KW PIP RATED 2]5 3,120.00] 10%] $2,208.00 $5,616.00
351]DDN1090 L4TDM-PSA 7-16 DIN MALE PS FOR 1/2 IN CABLE 215 78.50 | 10% $25.65 $51.30
351]L1705 LDF4-SOA CABLE: 1/2” LDF HELIAX POLY JKT PER FOOT 30D] 5 3.50 | 16% $3.15 $945.00
351/DDN1091 L4TDF-PSA 7-16 DIN FEMALE PS FOR 1/2 IN CABLE 215 28.50 | 16% $25.65 $51.30
207|DSTUSXDFM RF SPD, 300-1200MHZ DC BLOCK HIGH PWR, DIN MALE/FEMALE BI-DIRECTIONAL 215 161.00 | 10% $144.90 $289.80
351]DDN1090 L4TDM-PSA 7-16 DIN MALE PS FOR 1/2 IN CABLE 2) 5 28.50 | 10%| $25.65 $51.30
351]L1705 LDF4-50A CABLE: 1/2" LDF HELIAX POLY JKT PER FOOT 3D} $ 3.50 | 10% $3.15 $94.50
351[DDN1088 L4TNM-PSA TYPE N MALE PS FOR 1/2 IN CABLE ats 17.75 | 10% $15.98 $31.95
351][DSCS748612055N HYBRID CONTROL STATION COMBINER, 746-869 MHZ 12 CH. 1] $ 20,841.00] 10%] $18,756.90 $18,756.90
351]DSFITNRHC ITYPE N MALE RIGHT ANGLE FOR 1/4 IN F5J1-50A CABLE 10] $ 33.00 | 10%| §29.70 $297.00
351]L1700 FSJ1-50A CABLE: 1/4” SUPERFLEX POLY JKT PER FOOT 100] $ 2.25] 10% $2.03 $202.50
351]DSFITNRHC TYPE N MALE RIGHT ANGLE FOR 1/4 IN F5J1-50A CABLE 10] $ 33.00 | 10%| $29.70 $297.00
761|L30KSS9PW1N JAPX CONSOLETTE VHF 10] $ 4,554.00] 35%] $2,960.10 $29,601.00
656]G806 ADD: ASTRO DIGITAL CAI OPERATION 10] § 515.00 | 35% $334.75 $3,347.50
656/648 ENH: CONVENTIONAL OPERATION 10] $ 800.00 | 35% $520.00 $5,200.00
761}L999 ADD: FULL FP W/05/KEYPAD/CLOCK/VU 10] $ 729.00 | 35% $512.85 $5,128.50
656[G90 ADD: NO MICROPHONE NEEDED 10] $ - 35%| $0.00 $0.00
761]CA01942 ADD: DC CORD 10] 5 55.00 | 35%! $35.75 $357.50
185]GA00318 ADD: 5 YEAR SERVICE FROM THE START LITE 10] $ 319.00] 0% $319.00 $3,190.00
761 }HKNG233C APX CONSOLETTE RACK MOUNT KIT 10] $ 200.00 | 35%) $130.00 $1,300.00
351]DSCOL54160 OMNI, MEANDER COLLINEAR, 6.0 DBD, 150-160 MHZ, FIM RATED 24$ 1,921.00] 10%] — $1,728.90 $3,457.80
351]DDN1090 L4TDM-PSA 7-16 DIN MALE PS FOR 1/2 IN CABLE as 78.50 | 10%| $25.65 $51.30
351]L3705 LDF4-50A CABLE: 1/2" LDF HELIAX POLY JKT PER FOOT 300] $ 3.50] 10% $3.15 $945.00
351|DDN1091 L4TDF-PSA 7-16 DIN FEMALE PS FOR 1/2 IN CABLE ays 28.50 | 10% $25.65 $51.30
207} DSVHFSODMAPGR RF SPD, 100-512MHZ, DC BLOCK HIGH POWER DIN MALE ANT, DIN FEMALE EQUIP 2) 8 166.00 | 10% $149.40 $298.80
351/DDN1090 L4TDM-PSA 7-16 DIN MALE PS FOR 1/2 IN CABLE 2) s 28.50] 10% $25.65 §51.30
351]L1705 LDF4-50A CABLE: 1/2" LDF HELIAX POLY JKT PER FOOT 30] $ 350] 10% $3.15 $94.50
Wiyeys Use or disclosure of this proposal is subject to the restrictions on the disclosure page.

Page 2h

Page Image
Finance Committee - Agenda - 6/6/2018 - P61

Finance Committee - Agenda - 6/6/2018 - P62

By dnadmin on Mon, 11/07/2022 - 11:36
Document Date
Wed, 06/06/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/06/2018 - 00:00
Page Number
62
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060620…

351]DDN1088 LATNM-PSA TYPE N MALE PS FOR 1/2 IN CABLE 21s 17.75] 10% $15.98 $31.95
351)DSCS$15171205SN HYBRID CONTROL STATION COMBINER, 150-174 MHZ 12 CH. 1)$ 33,094.00 | 10%] $29,784.60 $29,784.60
351|DSFLTNRHC TYPE N MALE RIGHT ANGLE FOR 1/4 IN FSJ1-50A CABLE 10} $ 33.00 | 10%| $29.70 $297.00
351]L1700 F5J1-S0A CABLE: 1/4" SUPERFLEX POLY JKT PER FOOT 100] $ 2.25 | 10% $2.03 $202.50
351)DSFITNRHC TYPE N MALE RIGHT ANGLE FOR 1/4 1N FSJ1-SGA CABLE 10] $ 33.00 | 10% $29.70 $297.00
425]5QM01SUM0274 SINGLE ZONE TRUNKED L CORE us - 20% $0.00 $0.00
877|CA02648AB ADD: EXPAND 7.16 L CORE us - 14% $0.00 $0.00
877] UAQ0152AA ADD:500 RADIO USER LICENSES 415 7,500.00] 14%| $6,450.00 $25,800.00
877|SQM01SUM0273 MASTER SITE CONFIGURATION aps - 14% $0.00 $0.00
877|CA02629AA ENH: EXPAND 7.15 1 $ - 14% $0.00 $0.00
877/UA00152AA JADD:500 RADIO USER LICENSES 4l$ 7,500.00 | 20%] $6,000.00 $24,000.00
207]D$273279 DC SYS FP2-48/600A 3DIST 23IN 3BT8U 4f{$ 9,271.00] 10%] $8,343.90 $8,343.90
207]DS502877 48V 125AH 12V125F ENERSYS BATT SET 2] 5 2,720.00 | 10%] $2,448.00 $4,896.00
207)DS241115105 RECTIFIER, FLATPACK 2 48/2000 HE ays 860.00 | 10% $774.00 $3,096.00
207]DS236408 BLIND PANEL FP2 HE BLACK G1 124 $ 26.00 | 10% $23.40 $280.80
207]DS502657 BREAKER 304 1P AUX 5/16 BULLET 26] $ 38.00 | 10%) $34.20 $889.20
708}1T3225 ZZ MINI WORKSTATION 258G 8G NON RET 4]$ 2,500.00] 10%, $2,250.00 $9,000.00
244|B1949 MCC 7500E SOFTWARE DVD ays 250.00 | 20% $200.00 $800,00
244|B1948 MCC 7500E DISPATCH POSITION LICENSES aps - 20% $0.00 $0.00
244|UAQ0250AA ADD: 10 CHANNEL SW LICENSE 476 5,000.00] 20%] $4,000.00 $16,000.00
244] UAQ0653AA ADD: BASIC CONSOLE OPERATION 41S 4,000.00] 20%] $3,200.00 $12,800.00
244] UAQOGS5AA ADD: ADVANCED CONVENTIONAL DPERATION 4]$ 3,000.00] 20%] $2,400.00 $9,600.00
244] UAO0G5S8AA ADD: SECURE OPERATION 4]$ 3,250.00] 20%} $2,600.00 $10,400.00
244] UAQO6590A ADD: ADP/AES/DES-OFB ENCRYPTION 41S 1,800.00] 20%] $1,440.00 $5,760.00
244] UADOGG1AA ADD: ENHANCED IRR 4)5 3,000,900] 20%] $2,400.00 $9,600.00
443}B1941 USB AUDIO INTERFACE MODULE 415 1,900,00 | 20%} $1,520.00 $6,080.00
443]B1914 MCC SERIES DESKTOP GOOSENECK MICROPHONE 4) $ 250.00 | 20% $200.00 $800,00
4a3)51913 MCC SERIES HEADSET JACK als 200.00 | 20%) $160.00 $640.00
708] DSTWING328A PROVIDES ONE DUAL PEDAL FOCTSWITCH FOR USE WITH MOTCRGLA MCC 7500 DISP als 250.00 | 20% $232.00 $928.00
708] DSY7B61AA HP Z2 MINI ARM WALL VESA MOUNT ays 77.00 | 20%| $61.60 $246.40
877177449 WINDOWS SUPPLEMENTAL TRANS CONFIG ays 50.00 | 14% $43.00 $172,00
7o8|T788s MCAFEE WINDOWS AV CLIENT 4s 165,00 | 10% $148.50 $594.00
443]81912 MCC SERIES DESKTOP SPEAKER 16] $ 450.00 | 20% $360.00 $5,760,00
706]RLNG093 HDST MODULE BASE W/PTT, 15° CBL 4] s 210.00 | 31% $144.90 $579.60
IHZO Use or disclosure of this proposal is subject to the restrictions on the disclesure page.

Puge 27

Page Image
Finance Committee - Agenda - 6/6/2018 - P62

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2911
  • Page 2912
  • Page 2913
  • Page 2914
  • Current page 2915
  • Page 2916
  • Page 2917
  • Page 2918
  • Page 2919
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact