Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 28281 - 28290 of 38765

Finance Committee - Agenda - 10/6/2021 - P71

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
71
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

FADIA. BARK, P.E.
SENIOR ELECTRICAL ENGINEER

Overview

In 1993 Mr. Bark received his Professional Engineer’s Registration in the Commonwealth of
Massachusetts, was Project Manager and familiar with all phases of electrical Engineering. Along
with his Massachusetts Registration Fadi has acquired Professional Registration in the following
States; New York, Texas, Connecticut, New Hampshire and Rhode Island.

As a Member of the National Society of Professional Engineers, Massachusetts Society of
Professional Engineers, The Electric Institute Mr. Bark stays involved and up-to-date on all
current Engineering issues.

Since being employed with Dilorio Inc., the company has steadily expanded its Commercial,
Industrial, Retail and Academic projects in the New England area and abroad. In the field of
Electrical Engineering since 1984, Mr. Bark’s management abilities are demonstrated by the
success of repeat clients that he has direct contact with. Fadi has helped expand the companies
professional base by bringing on a wide range of process facilities type projects. Mr. Bark has
held a series of increasingly responsible positions within Boston’s top engineering firms.

Experience

SENIOR ELECTRICAL ENGINEER 1990 - 1994
Process Systems International, Inc. Westborough, MA.

PROJECT ELECTRICAL ENGINEER 1989 - 1990
Cannon Boston, Inc. Boston, MA

PROJECT ELECTRICAL ENGINEER 1985 - 1989
Dilorio,|Inc. Boston, MA

TEACHING ASSISTANT 1983 - 1985

U.Mass at Dart mouth Dartmouth, Ma

Education

ELECTRICAL ENGINEERING M.S. E.E. 1984 - 1988
University of Massachusetts at Dartmouth Dartmouth, MA

ELECTRICAL ENGINEERING B.S. E.E. 1978 - 1982

University of Massachusetts at Dartmouth Dartmouth, MA

Page Image
Finance Committee - Agenda - 10/6/2021 - P71

Finance Committee - Agenda - 10/6/2021 - P72

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
72
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

Susan W. Mohn

Massachusetts Registered Landscape Architect #1167
Cell: 781-820-0528
Email: mohns@comcast.net

Landscape Architect and Project Manager

PROFILE

Results oriented, hands on landscape architect and project manager with over 25 years of
successful experience on a wide variety of commercial, office, corporate developments and
school facilities. Responsibilities have included site master planning and design, site
environmental, state and local project permitting, the production of construction,
specification and bidding documents, and construction administration and observation
services. Project design experience has been founded within a multi-disciplinary
framework with emphasis on the integration of sound landscape architectural design with
civil engineering practices in the design solutions for and construction implementation of
complex small to large scale projects. Well established with a very strong technical
background and skilled in all aspects of project planning, environmental permitting, design
and management, including supervision of staff and project teams.

Proven Expertise

¢ Landscape architecture, site planning and design

¢ Site permits and environmental approvals

¢ Strategic master planning and feasibility studies « Cost management, estimating and bidding
¢ Construction drawings, specifications, administration and construction observation

¢ Leadership and supervision of staff, project teams and scheduling

« Program/project management of large, complex, multi-disciplinary projects

¢ Budget management, tracking and control

Employment History

John G. Crowe Associates, Inc., Landscape Architects and Civil Engineers, Winchester, MA
Position: Associate; Senior Landscape Architect/Project Manager 1985 - Present
Key projects:

¢ Philips North America Headquarters, Andover, MA (former Hewlett-Packard Corporate
Headquarters)

Page Image
Finance Committee - Agenda - 10/6/2021 - P72

Finance Committee - Agenda - 10/6/2021 - P73

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
73
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

e Minuteman Park, Andover, MA
¢ The Loop, Methuen, MA
¢ Global Headquarters for Raytheon Corp., Waltham, MA

¢ 175/185 Wyman Street Corporate Offices, Waltham, MA

Additional project listings and details are available upon request.

Childs, Bertman, Tseckares (CBT), Boston, MA
Position: Landscape Designer

Education
* Rhode Island School of Design

Bachelor of Landscape Architecture
¢ Bradford College

Bachelor of Arts, Urban Studies

1982 - 1985

Page Image
Finance Committee - Agenda - 10/6/2021 - P73

Finance Committee - Agenda - 10/6/2021 - P74

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
74
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

KennethR. Feyl, AIANCARB Registered Architect, MA LIC #20010 NCARB Certificate
#56332

Career Overview

Over 30 years of wide ranging experiences in a variety of building and construction types. A reputation for
uniquely skilled leadership, combining courage, business savvy, strategic thinking, effective team building,
hands-on problem solving and thoughtful development of individual team members. Exceptional track record
of outstanding results in diverse settings.
«= Gilbane Building Company’s Excellence Award for demonstrating the six core values of their company
- Integrity. Tough-mindedness. Teamwork. Dedication to Excellence. Loyalty. Discipline.
= Founding Partner of CUBE 3 Studio (30 person national architectural firm) - 3° construction related and
104* overall fastest growing company on the INC 500 list — 2009

Experience

JD LaGrasse & Associates Inc Andover, MA 2014 - Present
Architect

= Business Development and foster key strategic relationships

= Identify, develop and implement key business strategies

= Lead and Develop commercial architecture business

= Executive Project Manage selected projects in office

KBS Enterprises LLC Andover, MA 2010 - 2014

President/Founder
= Network, develop and foster key strategic relationships to sell business concepts and investment opportunity
« Identify key business opportunities in the consumer debt industry.
= Develop and implement business strategies.
«Raise and negotiate capital and debt financing.

CUBE 3 Studio LLC Lawrence, MA 2004 —2010
Founding Partner
= Overall responsibility for the development and on-time delivery of all construction documentation.
= Overall responsibility for architectural oversight of projects in construction.
= Management of architectural and interiors personnel (30 person office in 2009).
= Work closely with contractor project managers, super’s, and engineers to coordinate construction with
design documents — review and answer RFl’s, review requisitions and change orders providing comments to
owner and contractor on very tight time constraints.
= Comprehensive Code Review on all projects in office.
= Mentoring of junior design staff.
= Managed and led internal and consultant project teams.
= Developed and maintained key strategic client relationships.
= Clientele ranging from large corporate, health care, and multi-family residential clients to smaller local retail
clients.

Page Image
Finance Committee - Agenda - 10/6/2021 - P74

Finance Committee - Agenda - 10/6/2021 - P75

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
75
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

ADD Inc Boston, MA 1993 —2004
Sr. Designer/Manager
= Independently and as part of a team, developed construction documentation from design development
through construction for large corporate clients. Highlight projects ranged from 900,000 SF retail centers to
large, complex, steel framed multi-family residential and corporate office building projects. Lead Project
Architect for high rise multi-family Longview Place project (Waltham, MA), Brighton Landing Hi-Bred Parking
Garage with integrated retail space. Project and On-Site Architect for EMC corporate office building and
EMC Executive Office Suite interior fit up (Hopkinton, MA)
«= Passed Architectural Licensing Exam — March 2003 (MA LIC #20010)
= Employee of the Year - 1999
= Managed firm softball team 1997 — 2003

Edgewater Group Architects Port Chester, NY 1984 —1993

Draftsman/Intern Architect
= Developed construction related documentation for small residential and commercial clients with oversight
by project architect.
= General office manager responsibilities.

Education

Clemson University Clemson, SC 1987 —1993

«= Master of Architecture(1993)

= BS Design (1991)

= Cum Laude

= Tau Sigma Delta (School of Architecture Honor Society)
= Golden Key National Honor Society

Continuing Education

Keith Cunningham’s Executive Mentoring Program Austin, TX 2011
« Intensive executive coaching from nationally recognized business leader and entrepreneur

Bartmann Business Institute Tulsa, OK 2010
« Distressed Debt Industry—Intensive Introductory and Advanced Courses (Consumer Credit Card)

Peak Potentials British Columbia, Canada 2008-2011
« Variety of Business, Leadership, Personal Development Courses

Life Experiences

Andover Toastmaster Member Andover, MA 2012
Andover Rotary International Member Andover, MA 2012 - Present

President (current) and Vice President (former), Parent Association Community Effort (PACE) 2011 - 2015
Andover School of Montessori Andover, MA

Board Member Andover School of Montessori Andover, MA 2015-Present
Elite Freestyle Karate Reading, MA 2010 - 2014

= Purple Belt (Eastern FreestyleKarate)

Page Image
Finance Committee - Agenda - 10/6/2021 - P75

Finance Committee - Agenda - 10/6/2021 - P76

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
76
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

Hipolito Aguilera, ACS
170 Maple Street
Franklin, MA 02038

Overview

As Project Manager for Nesra Engineering, LLC., | have extensive experience overseeing construction of
private and public projects including Parks, Playgrounds, Athletic Facilities and Plazas for clients in the
public sector. Responsibilities included observation and documentation of daily ongoing construction to
monitor job progress, ensure compliance with project plans and specifications, schedule and coordinate
all onsite testing with designer, general contractor and project manager. Responsible for preparing
daily construction logs which include information regarding work performed, equipment used,
available work force, material delivered, tasks completed etc. Responsible for relaying requests for
clarification to project engineer and manager and providing direction back to contractor.

Experience

Nesra Engineering, LLC 2011 - Present

e Henry Whittemore Elementary School, Waltham, MA —Project consisted of a new synthetic
turf athletic field, basketball/futsal/roller rink, playground and site improvements. The
athletic field included a Brock Pad shock absorption system as well as alternative infill. The
facility is designed in full compliance with eth Americans with Disabilities Act.

e Staff Sergeant Herman A Day Park — Project consisted of multiple playgrounds, splash park,
cross fit exercise area, dog park, parking lot, multiple formalized ADA accessible park
entrances, ADA connectivity throughout the park, plantings, hardscape improvements, video
monitoring service, wifi connectivity etc.

e Swan Street Park (PH | and Il) — Project consisted of playgrounds, splash park, synthetic turf
field, natural turf softball field, ice skating rink (turf field conversion in winter time) ADA
accessibility throughout, perimeter waking areas, dog park, streetscape improvements,
lighting, interactive play structures, site furniture etc.

e The Meadows Park (PH | and II) — Project consisted of multiple playgrounds, splash park,
natural turf athletic field, dog park, basketball courts, seating areas, arbors, hardscapes
improvements, landscaped islands, park monuments, picnic area with chess and checkers
tables, flag poles, up lighting etc.

e Sacramone Park, Everett, MA-— Project consisted of synthetic turf little league fields with a
multipurpose outfield, basketball court, field house, playgrounds and splash park. Additional
site features included athletic and pedestrian lighting, security cameras connected wirelessly
to the local police station, public wifi, seating, seating plaza, landscaped islands, formalized
park entrances, etc. Park includes two ADA complaint formalized entrances, full ADA
accessibility thought, including ADA compliant play structures, picnic tables, spectator
seating, water fountains, restrooms and concessions building and more. Worked with
Licensed Soil Professional to ensure the soil was tested and removed properly and the site
was capped in accordance with permitting requirements.

e Glendale Park, Everett, MA — Project consisted of a baseball field, two softball field,
multipurpose rectangular field, perimeter walkways, two playgrounds, picnic area, seat

Page Image
Finance Committee - Agenda - 10/6/2021 - P76

Finance Committee - Agenda - 10/6/2021 - P77

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
77
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

walls, concessions and restrooms building, streetscape improvements, athletic and
pedestrian lighting, formalized entrances, hardscape surface, elevated planting beds,
monuments, irrigation system scoreboards, and much more.

¢ 9-11 Memorial Park, Everett, MA — Project consisted of two small adjacent parks. Challenges
included providing ADA connectivity between both parks, while maintaining the unique
features of each. Improvements include pedestrian walkways, site furnishings, picnic area,
holiday tree, community gathering area, water feature, up lighting and irrigation.

e Playground and Athletic Field, Madeline English School, Everett, MA — Project included a
playground, synthetic turf multipurpose athletic field, landscaping improvements, ADA
compliant walkways and athletic field lighting. Provided monitoring and oversight for the
removal of contaminated soils and proper capping of the site.

¢ Brook Charter School Playground Renovation Project, Roslindale, MA — Project consisted of a
small playground and synthetic turf play area.

¢ Taunton High School, Taunton, MA — Phase | of the project included eight tennis courts with
perimeter fencing, drainage improvements and ADA accessibility. Phase || included a
synthetic turf baseball field, ADA accessibility, solar scoreboard, backstops, batting tunnels,
bullpens and infrastructure for future lights and grandstands.

e Shawsheen Valley Regional Technical High School, Billerica, MA — Project consisted of a
natural turf softball field with backstop, prefabricated dugouts, perimeter fencing, irrigation,
grandstands, bullpens and batting tunnels.

e Winchester Soccer Club Athletic Complex, Winchester, MA —Project consisted of an indoor
synthetic turf field, outdoor synthetic turf field, a natural grass field, parking lots, and site
improvements. The indoor facility boasts a 70,000 square foot athletic field, elevated fitness
area, offices, locker rooms, concessions and restrooms; The outdoor facilities include
lighting, scoreboards, ADA and emergency access and other site amenities.

e Bike Path Improvements Project, Everett, MA — Project includes new pedestrian lighting,
emergency call boxes, cameras, and general site improvements. The project is currently in
construction.

¢ Memorial Stadium, Everett, MA — Project consisted of an in-filled synthetic turf
multipurpose field, sand based volleyball court, track and field events such as long jump and
triple jump, perimeter jogging track, grandstands and athletic field lighting.

e Athletic Field Renovation Project, Burlington, MA — Project consisted of a natural turf
athletic field at Burlington High School. Improvements include a stone drainage layer under
the root zone, amended root zone for the sod and irrigation. Future phases included bike
path with lighting, new vestibule and elevator for the high school, site improvements, ADA
accessibility from the building to the athletic fields.

Education

Palabra Viva (1995-1997)
e BAReligion & Theology 1997

Page Image
Finance Committee - Agenda - 10/6/2021 - P77

Finance Committee - Agenda - 10/6/2021 - P78

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
78
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

ADITYA MODI
modi.ad@northeastern.edu | 617-516-4953

Education

Northeastern University, Boston, MA
e Master of Science in Civil Engineering
June 2019
e Concentration in Construction Management
GPA 3.54
e Relevant courses: Construction Management, Legal Aspects of Civil Engineering,
Construction Project Control, Construction Equipment and Modeling

Mukesh Patel School of Technology Management and Engineering, NMIMS University, Mumbai,
India
e Bachelor of Technology in Civil Engineering
May 2017
e Master of Business Administration in Technology Management
e Relevant courses: Construction Equipment and Techniques, Quantity Survey Estimation,
Project Management, Theory of Reinforced Concrete and Prestressed Concrete

Experience

Nesra Engineering, North Attleboro, MA November 2020

- Present

Drafter

« Responsible for preparing all the design documents related to Municipal and Institutional
projects that includes athletic fields and parks design, grading, utility and parking lots
designing and layout, drainage calculations.

¢ Conducted site inspections to ensure quality control, OSHA compliance and adherence to
specifications as well as coordinated with the sub-contractors in supervising site work and
change-orders and prepared daily progress reports for two municipal parks redevelopment
projects.

¢ Conducted site surveys for three Athletic fields projects using Total Station and Carlson GPS
and used the data for creating As-Builts plan.

Nitsch Engineering Inc., Boston, MA September 2019 -
September 2020

Project Designer

¢ Coordinated site design issues such as RFls, change orders, submittal reviews and prepared
addenda with other design professionals such as M/E/P engineers, Contractors, Landscape
Architect and Architect.

¢ Performed hydrant flow tests to obtain static and flow pressure to better facilitate the
design requirements.

¢ Conducted analysis for existing ADA sidewalk ramps on site to have a better understanding
of the existing conditions while designing the sidewalks and ADA crosswalks.

¢ Responsible for various CAD, Modelling and design assignments related to Municipal,
Institutional and Private projects that includes preparing reports, roadway design, grading,
site layout, drainage calculations, utility design & layout, details and notes sheet.

Page Image
Finance Committee - Agenda - 10/6/2021 - P78

Finance Committee - Agenda - 10/6/2021 - P79

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
79
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

The Cambridge Department of Public Works, Cambridge, MA June
2018 - Dec 2018

Civil Engineering Co-op

¢ Coordinated with the sub-contractors in supervising site work and documenting project
schedules, change-orders, submittals, budgets, and submit RFI’s for approval for three
chapter 90 projects.

¢ Conducted site inspections and prepared daily progress reports for three Chapter 90
projects to ensure quality control, OSHA compliance and adherence to specifications.

¢ Managed a five-person crew to ensure the successful installation of a catch basin and
drainpipes.

e Performed street inspections and developed existing condition maps using ArcGIS and
formulated a 5-year action plan to prioritize street rehabilitation work.

Academic Projects

Alternative Project Delivery Systems - Tappan Zee Bridge, NY
Spring 2019
e Prepared a comprehensive analysis of ‘Design Build’ in comparison to other project delivery
methods available to the stakeholders of this $5 Bn project.

¢ Developed alternatives to prevent budget and schedule overruns by studying the Cost
Estimation and Scheduling at the planning stage & evaluated employed strategies of
financing, repayment and procurement of Contractors. Project Management Plan to support
technical RFP- Boston City Hall Renovations, Boston, MA Spring 2018

¢ Defined the scope of services to be provided by the Owner’s Project Manager for this $78
Mh project and formulated the roles and responsibilities of different contractors and sub-
contractors using a Responsibility matrix.

¢ Developed Cost Management Plan and Cost Control Plan for the entire project and created
the Work Breakdown Structures for different phases of construction, along with estimated
budget and timeline for each milestone task.

Skills

Computer Applications: AutoCAD Civil 3D, HydroCAD, ArcGIS, Microsoft Project
Technical Skills: Quantity and Cost Estimation, Valuation, Surveying, BIM

Certifications

e LAI Lean Academy Certification Course- 2019
¢ OSHA 10- Safety Standard Certification, Construction Industry- 2018

Page Image
Finance Committee - Agenda - 10/6/2021 - P79

Finance Committee - Agenda - 10/6/2021 - P80

By dnadmin on Mon, 11/07/2022 - 13:36
Document Date
Fri, 10/01/2021 - 11:42
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/06/2021 - 00:00
Page Number
80
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100620…

” - -NESRA yen zee
“= ENGINEERING, LLC

CHARLES TROMBLY, CPSI
16 INCHESTER AVE, BOURNE, MA 02532, ( 508)364-0208, CTROMBLY @GREENACRESLANDSCAPE. NET

Qualifiations

CERTIFIED PLAYGROUND SAFETY INSPECTOR (CPSI) SINCE 2006
© DESIGNEDANDINSTALLED COMMERCIAL PLAYGROUNDS FOROVER L5YEARS
e PROJECT MANAGEMENT OF SITE WORK PROJECTS AT PUBLICANDPRIVATE PARKS FOR 18 YEARS

Experience

1/1/2015 TO PRESENT Green Acres Landscape and Construction Lakeville, MA 02347
ASST PROJECT MANAGER

¢ Commercial Playground Construction Supervisor
e Playground Safety Inspector
e Playground Safety Consultant

e 5plusyears experienceon projectsgreaterthan$100k that involve Poured-in-Place Surfacing andthe following
Commercial Playground Manufacturers: Landscape Structures Inc, Berliner, GameTime, KomPan, Burke, Little Tikes
Commercial, lcon, Polygon, PlayWorld, Big Toys, Goric, Playmart, and all types of Shade Systems.

1/1/2003 TO 12/31/2014 Northeast PlaygroundBuilders, LLC Braintree, MA

OWNER/ CONSTRUCTION SUPERVISOR
e Estimator

¢ Commercial Playground Construction Supervisor
¢ Commercial Playground Safety Inspector

© Designed Commercial Playgrounds at Parks, Schools and Private Institutions. Also have experience with projects
greater than $100K forinstalling commercial play equipment and Poured-in-Place Surfacing.

9/1/1999 TO 12/1/2002. Cer-Trom Construction Corporation Plymouth, MA

PROJECT MANAGEMENT
e Estimator

e Installed Commercial Playgrounds and Site Improvements

Education

9/1988-— 12/1993 Merrimack College North Andover, MA

BACHELOROF ARTS
e Major-History

e Minor-English Literature

Page Image
Finance Committee - Agenda - 10/6/2021 - P80

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2825
  • Page 2826
  • Page 2827
  • Page 2828
  • Current page 2829
  • Page 2830
  • Page 2831
  • Page 2832
  • Page 2833
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact