Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 26731 - 26740 of 38765

Finance Committee - Agenda - 10/4/2017 - P97

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
97
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Michael D. Adams, P.E., Lead Controls Engineer

Harvard University — Cambridge, MA

Project Description: Detailed engineering, procurement, and construction of
additions to Harvard’s Blackstone station including a new natural gas fired boiler
and refurbishment of existing No.2 and No.6 fuel oil systems.

Role: Staff Controls Engineer assisting with various systems within the existing
Blackstone Steam Plant. Responsibilities included pipe stress analysis, piping
support and anchor designs, project P&IDs, and plant and distribution system fluid
modeling.

Professional Registrations
Licensed Professional Engineer: New Hampshire

Professional Qualifications
BS Mechanical Engineering — University of New Hampshire

WALDRON

Page Image
Finance Committee - Agenda - 10/4/2017 - P97

Finance Committee - Agenda - 10/4/2017 - P98

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
98
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

Organizational Chart

Page Image
Finance Committee - Agenda - 10/4/2017 - P98

Finance Committee - Agenda - 10/4/2017 - P99

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
99
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

Nashua Waste Water Treatment Facility
Energy Recovery Generator Upgrade RFQ 0258 - 080417

ORGANIZATIONAL CHART
City of Nashua
Project Manager
Cedric Chan, P.E.
Waldron Project Executive
Jeremy Smith, P.E.
Project Manager
Erich Gustenhoven, P.E. Yong Choi, P.E. Mike Adams, P.E. Genesis Industrial Group
Lead Mechanical Lead Electrical Lead !&C BioGas Systems SME

1 tT RECO2S2-080417
Th ; Aug. 4, 2017

Page Image
Finance Committee - Agenda - 10/4/2017 - P99

Finance Committee - Agenda - 10/4/2017 - P100

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
100
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

Project Experience

Page Image
Finance Committee - Agenda - 10/4/2017 - P100

Finance Committee - Agenda - 10/4/2017 - P101

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
101
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

PROJECT SHEET

ATLANTIC CITY LANDFILL ENERGY

Egg Harbor Township, NJ

Waldron Engineering & Construction, Inc. was contracted by DCO Energy to develop a
design for the addition of landfill gas conditioning equipment for Atlantic City Landfill
Energy. The project was two phases; process design followed by the development of con-
struction drawings. The goal of the project was to install a chilling system to remove con-
densable gas from the landfill gas stream and provide for a future allowance for the addi-

tion of a siloxane removal system.

The process design phase modeled the performance of the existing system to determine
the base line performance. The model utilized the existing piping layout, performance
curves for the blowers, known characteristics of the land fill gas and site operational
measurements. Once calibrated to the baseline performance, the model was modified to
include the characteristics of the new chiller system. The construction drawings were de-
veloped to implement the project included: general arrangement drawings, system P&ID,
electric one-line, misc. equipment pad, piping drawing, wire list, control system and con-

struction specifications.

VYWALDRON

QUICK FACTS
Location: Egg Harbor TWP, NJ

Design Start June 2071
Design Complete: Oct. 2011

In Service: January 20172

ainat as) (x Design Development,
Detailed Design

Technology: Landfill gas 1.6 MW conditioning

[ies) gr 6; Joseph Ventre
DCO Energy, LLC
866.614.6575
jventre@dcoenergy.com

WALDRON ENGINEERING & CONSTRUCTION, INC.

37 INDUSTRIAL DRIVE SUITE G-1 EXETER, NH 03833 603.772.7153
WALDRON. COR

Page Image
Finance Committee - Agenda - 10/4/2017 - P101

Finance Committee - Agenda - 10/4/2017 - P102

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
102
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

Z PROJECT SHEET
BRIGHAM AND WOMEN'S HOSPITAL

Boston, MA

Waldron Engineering & Construction, Inc. was contracted to do a study for Brigham and
Women’s Hospital (BWH) to evaluate the feasibility and economic value of installing a
Combined Heat and Power Plant (CHP) in theit new Brigham’s Building for the Future
(BBF). The primary purpose for the CHP is to provide operational cost savings to the
hospital and a level of resiliency to serve the energy needs of the facility. In addition to
studying various CHP technologies, including combustion turbine generator and recipro-

cating engine generators, Waldron appraised the value of supplying electrical and thermal
which is part of the Brigham and Women’s Hospital campus.

Upon identifying that a 4 MW reciprocating engine based CHP was the optimal size and
technology to serve the two buildings, Waldron executed the detailed design of the entire
central energy plant. The building is expected to be occupied in late spring 2016.

energy not only to the new BBF building, but also to the neighboring Shapiro building

pug) BRIGHAM AND Sera
WOMEN’S HOSPITAL [Bae err

tates ¢ Medical Soba
Study Date: Nov. 2072

Design Start: Feb. 2013
Design Complete: July 2074

In Service: Spring 2016

Firm Role: Feasibility Study, Schematic Design,
Design Development, Detailed Design,

Technology: 4 MW Reciprocating Engine Generator,
125 psig Waste Heat Boiler, Jacket
Water Heat Recovery, {2} 7/00 BHP
Firetube Boilers

George Player, CPE, FMA
Director Engineering

Brigham and Women's Hospital
617.732.6721

Qplayers@partners.org

WALDRON —° PUN & CONSTRUCTION, ihc.

37 INDUSTRIAL DRIVE SUITE G-1 EXETER, NH 03633 603.772.7153
WALDRON COM

Page Image
Finance Committee - Agenda - 10/4/2017 - P102

Finance Committee - Agenda - 10/4/2017 - P103

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
103
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

PROJECT SHEET

MILFORD REGIONAL MEDICAL CENTER

Milford, MA

The installation of a new CHP system at the Milford Regional Medical Center was executed as a fast
track project by Waldron. Milford was looking for cost savings and resiliency for their campus. The new
CHP system included a packaged 800 kW natural gas fired Caterpillar engine and waste heat recovery.
Heat from the jacket water system and the engine exhaust are utilized to produce 15 psig steam for the
hospital low pressure system. Energy from the engine lube oil system was recovered and utilized for the
domestic hot water system. The CHP system will provide operational cost savings and in the event of a
power outage, could supplement the emergency diesel engines to provide power to the hospital. The
project was completed in 10 months, from notice to proceed to utility acceptance testing.

Scope of work included:

e Construction Permitting

e Balance of Plant—Detailed Design

e Review CAT Supplied Equipment
Submittals

e Elevated Gas Permit Variance
Construction

e Commissioning

WALDRON

Regionai ‘)

Medical Center

ee

QUICK FACTS

Location:

Bets 0] gr rd

in Service:

Firm Role:

Lea] n=\ei ra

WALDRON | SINEE =F ING & | C ne

37 INDUSTRIAL DRIVE = SUITE G-1
WALDRON.COM

Size & Technology:

JIN ISS | fF

EXETER, NH 03833

Milford, MA

danuary 2015

8G0 kW Recip. Engine
December 2015

Peis emma p siege (re) pm
commissioning

Joseph Boczanowski
LB igeieire] whe) gl w= (esr (ts)
josboz@milreg.org
(508) 422-2499

UCTION, INC
603.772.7153

Page Image
Finance Committee - Agenda - 10/4/2017 - P103

Finance Committee - Agenda - 10/4/2017 - P104

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
104
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

VYWALDRON

PROJECT SHEET

TWA FLIGHT CENTER HOTEL

————
JFK Airport Terminal 5—New York, NY |

Waldron has been contracted as the Engineer of Record for the energy center serving the historic
TWA Flight Center Hotel at JFK Airport. MCR Development is the investment firm redeveloping
the iconic landmark into a new state-of-the-art hotel. Waldron’s role is to design a grid independent
combined cooling, heating and power facility for the project. The equipment will include three
nominal 335kW CHP engines, a single 335 standby engine, with a 500kW ESS system. The design
scope is a comprehensive engineering scope that will provide a fully coordinated design. The BIM
model will be coordinated with and turned over to the building contractor as well as technical doc-

uments that are ready to be issued for bidding and construction.

QUICK FACTS
New York, NY

ign Sta bos) 0) mara 8s]
Design aes |B =e al Es)

Size & Technolegy: Sx335kVWV GEJenbacher,
500/ 1000 KW/kW-hr Energy Sterage System

Firm Role: Engineer, Permitting Support

Contact Jason Garone
Director of Construction

DEVELOPMENT pellets
jgarcne@mecrdevelopmentiie.com

Rendering af the TWA Flrehit Cener Hotel at JPR Airport: Courtesy MCR Develapotent

WALDRON ©NGINCERING & CONSTRUCTION, INC

37 INDUSTRIAL DRIVE SUITE G-1 EXETER, NH 03833 603.772.7153

WALDRON. COM

Page Image
Finance Committee - Agenda - 10/4/2017 - P104

Finance Committee - Agenda - 10/4/2017 - P105

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
105
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

IV. Addendum #1

Page Image
Finance Committee - Agenda - 10/4/2017 - P105

Finance Committee - Agenda - 10/4/2017 - P106

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
106
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

VEE-6S (E09) xe © ZOEE-68g (£09) eucUd * O9OEO alysdwey MAN ‘enyseN e Jans uleEW G2Z

AVTIO’] JUOUTJBST], IOWVMaysVAA BNYSeN - Sopessdy] oyerdUAay AIDAOIIY ABIOUY L1h080-S87OOM

(WLII,T)

“OUT “UOTRONAQSUOD pur HurreouTbuy uoapTem

(212d)

Lioe ‘Pag bow

(oImeusIs pozioyNy)

‘aseyoud piq Anod Ui WINpUeppeE SI) epnpoul pue USIS oSvaTg
LIPV080-S8ZOOAA 405 [eIITWAIQNs pig JUL poe.10d.109UI pue poAledo. [# WNpUEppYy

UEYO OFApSep

AOS YURAUSPUD pUdyOOy
enysen Jo Aya
Joseuryy sulseyoing

uadyooy ueqg

‘nod yueyy
‘OUIBS OY} UIPWIO JUWINIOP [BUISLIO dy} JO Sjoodse JOyI0 [TV

‘syuomarmbar (7 Y UO UOLeITPLAV]S
Joyjany spraoid puv suonsenb payjtuwigns 0} puodsa. 0} pansst SUuloq SI [# WNpUsppy SIq

‘eWUIGNs OY 0A
QJM 99ed SI} OPNpPUl puL UOTJEWIOJUT [CUOTIIPPL STY} JO JAIADOI DBSIPUI 0} MOTOQ USIS dSvd]q

‘OA [eUISIO oy] Jo wed e saWIODaq JUSUINIOp SITY} Ul popnypou! UONeULIOFUT
T# WNGNYdGdV

APIIV A] JUIUIVIAT, 19JVMIISVAA BNYSEN
sopeisd() 10j}819005) ATDAOD0Y ASOT

LIP080-S87TOOA
L107 ‘8z Aqne

fuaugsvqacy GUuIsBy It

Aug 3009 aug, VNHSVN dO ALIO JHL ©

Page Image
Finance Committee - Agenda - 10/4/2017 - P106

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2670
  • Page 2671
  • Page 2672
  • Page 2673
  • Current page 2674
  • Page 2675
  • Page 2676
  • Page 2677
  • Page 2678
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact