Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 26341 - 26350 of 38765

Finance Committee - Agenda - 3/15/2017 - P85

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

BID ITEM DEFINITIONS

Concrete Block Wall
Four Hills Landfill
Nashua, New Hampshire

The following describes the Bid Items and the mechanism for payment to CONTRACTOR for each
completed Bid Item. All incidental costs such as overhead, profit, and insurance shall be factored into
the Bid Item unit prices. All measurements are based on plan view areas and lengths without
consideration of slope. Bidders should factor slope adjustments into their Bid Item unit prices.

Bid Item No. 1 Mobilization /Demobilization

This item requires that CONTRACTOR furnish and/or deliver to the job site all labor, materials,
resources, and temporary support facilities, including but not limited to portable sanitary facilities,
and equipment necessary to perform the required Work. In addition, CONTRACTOR shall prepare
all required written plans and schedules, including but not limited to: Site-Specific Health and Safety
Plan, initial and progress construction schedules, and subcontractor work plans. One half of this
item will be paid as part of the initial progress payment after temporary support facilities are set up
and construction equipment and materials have been delivered to the Site. The remainder will be
paid for demobilization after the Work has been deemed substantially complete, CONTRACTOR has
provided Record Documents in accordance with the requirements of the Specifications, and
CONTRACTOR has demobilized from the Site, which shall include removal of all materials, resources,
equipment, temporary support facilities, and all remaining construction debris at the completion of
the work.

Bid Item No. 2 Earthwork

This Bid Item includes all labor, materials, equipment tools, and apparatus as necessary, to place
Screened Till foundation for the east concrete block wall as shown on the Drawings. This item
includes compaction of the material as specified on the Drawings. This item will be paid on a unit
basis per linear foot of Screened Till placement completed. OWNER shall furnish till (unscreened)
from on-site stockpile.

Bid {tem No. 3 Furnish and Install Concrete Blocks

This Bid Item includes all labor, materials, equipment, tools, and apparatus as necessary, to furnish
and install concrete blocks as shown on the Drawings. CONTRACTOR shall be responsible to
provide equipment and labor necessary to transport and unload concrete blocks at the site.
CONTRACTOR shall be responsible for placing and compacting Common Borrow Fill along the west
side of the west concrete block wall and on the east side of the east concrete block wall as shown on
the Drawings. OWNER will supply the Common Borrow Fill material. This item will be paid on
a unit basis per linear foot of wall constructed as specified on the Drawings.

Bid Item No. 4 Supply and Install Wall Lining
This item includes all labor, materials, equipment, tools, and apparatus as necessary, to furnish and
install 60-mil! HDPE Smooth Geomembrane and 10 ounce per square yard nonwoven geotextile

as specified on the Drawings. This item will be paid on a unit basis per linear foot of wall
constructed as specified on the Drawings.

Page 2 af 4

Page Image
Finance Committee - Agenda - 3/15/2017 - P85

Finance Committee - Agenda - 3/15/2017 - P86

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

Bid Item No. 5 Landfill Gas Conveyance Pipe

This item requires that CONTRACTOR provide all labor and equipment to place landfill gas
conveyance pipe against the landfill side of the east block wall at the base of the wall. Labor shall
include installing 4-inch diameter perforated high density polyethylene (HDPE) SDR-17 pipe and 1 %-
inch diameter Crushed Stone as defined in the Drawings. OWNER shall furnish the pipe and install any
and all fittings (risers, well heads connections, wyes, tees and elbows) required to complete the work.
This item will be paid on a unit basis per linear foot of pipe installed

Bid Item No. 6 Survey

This item requires that CONTRACTOR provide ali labor and equipment required to perform
construction layout and as-built documentation as required by the Drawings and as requested by
ENGINEER and/or OWNER. Construction layout shall be completed prior to the start of screened till
placement and shall include the concrete block wall alignment and all other work items as defined in
the Drawings. CONTRACTOR shall document the constructed alignment of the concrete block wall
and LFG conveyance pipe. As-built survey locations shall be performed as features are constructed
for payment and record information and shall include all completed items as defined in the Drawings.
This item will be paid on a lump sum basis prorated over the scheduled duration of the work.

Page 3 of 4

Page Image
Finance Committee - Agenda - 3/15/2017 - P86

Finance Committee - Agenda - 3/15/2017 - P87

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
87
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

City of Nashua, NH

Liability Insurance Requirements
July 1, 2015

The VENDOR must maintain the following lines of coverage and policy limits for the duration of the
contract. Any subcontractors used by the VENDOR are subject to the same coverage and limits and is a
subcontractor to the VENDOR and not the OWNER. It is the responsibility of the VENDOR to update
Certificates of Insurance during the term of the contract.

> General Liability:
$1,000,000 per Occurrence
$2,000,000 Aggregate
(City of Nashua Additional Insured)

> Motor Vehicle Liability:
$1,000,000 Combined Single Limit *coverage must include all owned, non-owned

a red vehicles.
(City of Nashua Additional Insured)

>Workers’ Compensation Coverage according to Statute of the State of New Hampshire:
$100,000 / $500,000 / $100,000

(Sole Proprietors not subject to Workers’ Compensation requirements)

VENDOR and subcontractors at every tier under the VENDOR will fully comply with NH RSA 281-A,
“Workers’ Compensation’.

Page 4 of 4

Page Image
Finance Committee - Agenda - 3/15/2017 - P87

Finance Committee - Agenda - 3/15/2017 - P88

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
88
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

alet-ezz (c09) xvd oo6T-sz2 (£09)

TOGO AUIHSdNVH AN ‘dYOaNOD

‘LAALS AMINNOA 02

| A AA
Se re]
OREO
Taw Tam |
eviweenae
y
SliviaQ WALSAS 531 $133HS ¥
STWLAG TIVM H501d SLSYONOO rFESIBaHS ¥
3d0'd ONV NVId 7133aHS ¥
NV1d TIVM AD0718
SLIYONOD ONY SNOLLIGNOD ONILSIXS bISSHS V7

XEON LSSHS (Lioz ‘NMC dasnad) &

SUONIMVEC NOLLONYLSNOO TIVM XOOTE SLSYONOO

(slot Aadwaaa sine)
(vlOZ LSNONV GASIAsY)
200-S6-dS-MS-S3d
tl0e YHAEWSO3C
SYIHSdINVH MAN ‘VAHSVN
TISONVT STIIH YNOS

TUIHSdAVH MAN ‘VNHSVN
THAGNVT STIIH WNOs

VNHSYN' dO ATID

O00l=.b -3IWIS

NV Id SNOO

Page Image
Finance Committee - Agenda - 3/15/2017 - P88

Finance Committee - Agenda - 3/15/2017 - P89

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

Arte LY Oh 44) Weld. pls
ef Bahai he PPA

. my
“Mega batt)
ae “nym AO
3 agya analy

pM Gal adid foe
ag aoe of, ‘ .

Hist Ye, a ONL wae “okt

tite wey”.
Layo

aes”

TRAM BNL ANA. aes

ah Duis Io.
fue nei? WO | Lehe® ACT GO fe
an Oct as oa Algyfleo Cavan
OU dS , . “
"ye old ae : “

“4
Toe
OR
at
st
= .
Bee = ease
ad “ee

oa:
Popor of
be hove es cd
os
er =

Te ee
20.00, GeabLn 2 Me Ta) Bawa
Frm TEM 20

woucotgwritnine ST

Ten ART wun 1
MURIN SS Vine awerolae

pins

Bwiw nO WES

rei 8S ease ot
sd a

AARNE THA Se RIT
ie aeecate trek Taste

Ie sOKrt

1 NV 1d TIVM 901g SLSHONOD {302 UBGNSDa0 “ive ae a ee ee | |
BRSNWHNIELS A poe ee ,
wees} NW SNOLLIGNOD ONILSIXS See teen eee a dvi NYOINWS
a ONWINE NS CSIR OS IEP Tar AE Hort jury
POSIE |SONIMVYC NOLLONULSNOD TIVM XSOTd SISHONOO) SHATWETT 3 rie shige ote =
twmownne 21a WNHSWN 40 ALIO Shae» BSS stad aA
Fina re aa 22ITES wos Sa
otha BRANES ITE “RIT Ve Cg DROME PE FNC OMENS Vee TER CD
—/ 4 hed oe? dead RTA ee ee
aurea ‘CCAR TL Ie DCL AY et AVE IE Nathal AAlare Paced Mthart

alk Gctae ed itr ERMAN BUCCI Tok WH CO ETD
Heer
Ente Vas saad Aicakamrtshiomeiopdirateedteaete nel
PULLS S90 TRONS Fe Dene GOP aera ELT
PRAT TS VIN MN TITLED CORE? OY TES
TeataF UN aba, SOT OVEN ba 1 Sali Bema

WANGONE NORMED LINED MIDEOACD GAL BIBRA

y mcceietendd RELATES Ac nate A WS Ea al td
Wirt “1 Gow0i70 ORINDA

“penne ceanG Una ML LA ESI SRVERCOGT ERY

Keer ite ag, MO CAA SUV RE CRIs
PenUDeL wees POUR CIAL Be PR On Bean aL

SAARI ALE) Bh) AR CHL

ae - - Ra

brs rte ES Ngee ett

eee ae

‘<

Page Image
Finance Committee - Agenda - 3/15/2017 - P89

Finance Committee - Agenda - 3/15/2017 - P90

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
90
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

7 we

Page Image
Finance Committee - Agenda - 3/15/2017 - P90

Finance Committee - Agenda - 3/15/2017 - P91

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
91
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…
Page Image
Finance Committee - Agenda - 3/15/2017 - P91

Finance Committee - Agenda - 3/15/2017 - P92

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
92
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

£ SUVLIEG £10z MaBNDRG <aLvO at iat = =
. iy 7m PLT joa Tee ;
apnea 1396 TIVM 49018 SLSYONOD BESNWHNIAIS "2 TOR SEG THAT RTOS CENCE AND

ceacaa sme oa Tey =~ = | VaH i NYOINVS

#O'9900 | SONIMVHC NOLLOMRLLSNOO TIVM HI018 ALSHONOD SHIWweT 48 R=
AOA Aree YWNHSYN 40 ALIO SHd1we ‘fT -AB KWH a,
Tos ak Jon )
§
wees | sant rd NO(LOGS TIVM MOOTE BLAYONOO TVOIdAL
Pike we ne ASUNLE WHORL OPED .
mete. wo OnLy AUDA MLE KV)
Hien
see
| waseza ene < exanay Snaed Ly woLwoeT?
vote eae
Ate 2h rts win
wate teat Weak IY ULONIDULE TPO
ruc ade
sonauas | Toca am
jgm es mifonty Derteyeceg LLIN ES FAIL
saa ee
ere as Coley wos af 15,
nan, ones Ltd: Aue . (z)

NOOTH ALTHONOD TWOIdAL

WONT irom
“2
nee wane | ADM IS r 4 Fr
Wines
as a 1H
PULAGAS shat OAEIMLUES HO Ate ROD ae EL AY waa nan
Ne ELL WE TI BACT B TE BOLIWWLMOOD Oeste MEDAN Or 81 PTRLEAB
BAL ULL SES eM AA Tweed ITNT DADALYAIRT HD eathe gO WUROND C + pare cornea Anewoue
“LIV CemcnaeG a0 Fae u 1
FRU LOS ¥ Mev IMINO) WEY EL PTOd s Cleft Cty CLT TIS 30 FS LGN
Seale nova AIRES NANT EE A oe 2 aaSses GETTY 7a DreaNOST
: RE LD Tet DeeRONORD BH Woe ON HL SOSTTADBAL ML ATH Nie Zonk
Tyron 2 VEY DAA UD Vi ta OL AUVERSIN FY LICHT DOAASILG MONS QETEIASIW Ort WORE MS MASI AUP Lie eed BOTS ONMTATRCIES1
SSOTIOM Belt ROLL ONLENOG Thea OUT MLIRND 5H) 20 BYEEY MALIK OIE
STN ANORRY CL INR INOE Heche ei LY ORY BORA TH MOLINOS t
aS eavanuty Uw ee RH
cay eer awusy , Onuccme urn WomseNe
“OHNO HL NO GBI a oe oo mI YO
sv SOON WRC BL BOB CaUTAIS Ba TMS Neve FmNOdS “ez et Boris | iis STON enw !
“Witttea ssavI0 WASTE Crs hie NY,
SADC TWNRSZARO On SI beads Le) IVHL BOUIN ADEN The PLR e = 7 Rl MI SEY
Riwer RUIN 20 ANT ATS TMYE EUVTEO TSVAENLLO wO BoWoY Zeon? aan pmol at Anica
WALBRLS LAW LW SCONLEYY OFESN CELO7GRO 58 THs Slinved MINTED “1 4
tv 24g OWT Ai HL SI OHE MBM LOM Tree (cl eae Tae,
HUA 80 HO DENG GAO TOWING ANY Bd Gareveinrs.
CHLNOEDINL “TOIT “THIN Ad ETON ROWNYO LOW TWHe INGHANOR Se ss oe eee ranuen
SUN BrNOrORD PO A680 GOT 38 dcr Ts Sass BIA os
STHRDNR BO LESS ‘Waves Cory caL0n 38 Trevis TLULOaD MSACMNON BH WO SAva ORY EET Te
21 TeENG RIM EIINORS IML BSWro JON TAM Jet Sey TI® GVENE Ned HORII CSE ONY LOREMMT THL WO SADIE TY SCOOT
AU LWT Oi fons OuLatON Sa Tet Rina SeueNORD GHOTAIO Tt SUA HHUA COTW BE Ths TOD | MEAOMNDW
TOMO TION 38 THY 46 FRCL
Dh a coe 5 ee 2 sae wove o EAE «OD MOIWTWIOe Die DAncrw GORN SHOLLVOMENOTEY SATE
“SBHOME 1 JO MeISIe v Obed ND Ba THIS Cle Servet @eTODe. Ii MOTION THE MALAI DTEVEMESDOHEOK 39 THHE FULG.OID WaAGMOWed
“CPR eR NO ODAC OS VIR SV ANY AB WOU TTVLEDT POAAREED PECL ONY “ENO 6 ‘DNNOR YH CHO Bas:
DENIC TOIT BLMGRGNOTT BELL 30 NOUMGd Ati “DXNOHNH Anan Ht KLIS 3y 11 via TE Led. sascalse Wave ¥ Cu ORLEED BOWE Mae WO TTA LO CAC
IM, OPT Y Hn Civmns edad 4, WIAD OTe id Ther eerranOaG 8 FO REA CALTRATO 4 FDR el 3 COMED STE FO) MONON 1 FANG WN SAG CW I
DANWEI 20 WEN COO GeO Hh SNE ANID Sa POCO LOT
BELLE OF BA ESRI WO REALE ZOMG #0 BY RMY IO TOON HOH LTA FRREIGIS WNGIOR
NO AVIMOIM 40 ROOMS ONUING GUTeunt be LON Tem DaWOIINGIO FD
vs “UCR ANGE NOULIVENOD dO EICEVE NOS LEW
cee Gann Imes Mato Ee MLM CULV eNO B® Thee TRL GINTAIS BY “TRS AACANEG MORMIOS dc Lal HOVE ft
Gre wava Vow sv Hore INGAETO frei) OOOO ETH NEROUR “ti FLAVA aD WHS Hee Es MITTIN $9 TAA TIL AKOR tL 4 Hidg0 OKIE
BUDO SHAG CY Sav SS Tae nae ab
MiOVavek Ov MONE WNonanoa EHeEn COMMAS 90 THE : (e941 ZORGUODE HERE IE-NONH HSS WIE NUIT TS 90-1 CU I 46-L EVE 7
© preeieeneret pepe be deel lot RU AY OL -SRROADE 90-6 Aik MAUOSRNES “OAWUONT Sk LN -APRTIE LOL ek CoO
Td HO OREO: OF ONY THD A BNO ARN UL Udi aru ge TO LST .
ANRANE OL FImAECNOT Dhemacnsddy Hes OXWACEY, 30 a aa ORY DaCd 20 See reba ard AO WANORST ISL Bell Sets Pte sat@UOOIY
vow NU EDI (WON -ESRAYD —Etbit “Petty SEED OH NG LENDS —fe ted
Cee ee Oe na a EenY MINHA UTVEAD AMM POWs ALORS Vga de ew PASEO TUSY HUM SONVOROGOY WI OSLA) MBA GERATIC CC (ON BATT LON re
uLvaarudsameneitn MOLOREA 20 SOY Teves. Hi "OES PLL MUM SHAOUOSOY AO LNT Hus Led von ae
SMOLYOUEAG 90D, CHUTE JON BeNaNNOID UO ReWERENOID Gatvend © SABI Wd SONG 86 LEVIN BW LUGO ro OMawanto Ww URO THe TRL Game os U7 eer ae]
ASSYORU NON GL REG 90 TIVE SW eNLEST SWaaLD vane easansy > =
90.009 ¥ ALNINVA SAL 9D HHS aT OF Draw Os ee ee Hine SOWOMODCH MO OSrUNO ANd Jd Te ULL AUT OC-2UNLEIOW sO¥ Heth $000 FLEW ae
SL KoA NNW NM WVRGLYN TMDIOND Bu 40 NoUDReRi NWA SEN RCLOCON ta OLS Maia ALANGR AWG FnWENEYT! DHL 40 LvdTaIae 88 sr LbY 2 >.
Gee AOIVOWLY “OATH "REELS HO) EHOLONULEN WALA Lis ianc3 AMEHIO GU HOOD Gove ta Ry Laos Tine Tel CONTACIS CAL TH ERNE WORN: = -
WROD TO Bk BDA Tre MOD a TSS LDPPAG HI Haare bess HATRED TINGS OO! NVINES The TEL ONTO "a.
AAYWERNOTD AWOLIVs TL POA DNERADKIO Bi Oekeate OL uO LLLP SAO HC SEL TTSO VHLD Ory wee Key
— wrote nantes eet mseawat 28 008 oN ne a ere nome
mH CHV HI :
DOD BL WHLVAROSON NL BLES DEN NSS be enue OBarE v NG AUTRE, GEIS BO THHE TR Hie Cee The MCONGB HOOD af
WARN 90 BIBER War Bits WN Ze SLU 40 wou “OMT 0 RESHINO HL OHV CHEE BHL AUAIA THA MONEDA WO AUD SU “BONAR RD ry
YF Qy NOUICOAROO ONY SBMA RVURTINISO BL CH WWISd LOMAS ¥ DH NG Wicd Geel BEML Ch Oe OWNS BAY! SORGNS HOVE 30 DOH) peal
ery Mm <add ane Ww > =
‘ *
“2OUS BN ADHMLIBG V Hit C3 KUNZ ThA ‘aewauann pote
os nomi a en gu Te cer Cy He en sau acme te Tet wane tae wn ma ee Ee
SUVOULURD 20 VAR GouvarOSOY Ag THE BIC Se) Of GAAVIDO MOON “8 ‘SOLOMLINDD MDLIAD AMET DL Baotey alee JO soon WANTS ZENO AVAL HUNT
~ “WaLivrenetpona 2a varienrings A253 BH AB CDAD NEY HCL 0 ee t
HO Ab WS TwuaIvN mew Cama Ee EK
Se TWH ORY Situend vO ‘CHIOMNd “RIOUWMIE OW TAME Tn SeAWoNaAOae RON EriaO AG) DERLDOM Thre BURNT BH Md OOMLVANIG Ms WORE TWA 300i
SMOCAA NCNTLE BARON Cane oe, manwaanaG 35049 Os OTWAIORLS Care CLALWERE 29 Tres Twas "ROE Press Bll ADO PRANTL
AB ANNE © CHANEY INOS SvOH OMOREDIAN JO ANSI THUD BNTSACTS
DEGH PUEY OL CRACROSIY £ AWODALVD MO 1 ABDORLYD £0 ONUVENOESIADO see
Jew MOMMIES ¥ BATH Guy WiEy @ FugY GL wetECOY IOV NORD INTE

“ERG NO Trees 1
Cowl DOR LON LNW UaGouIE £30 wreMNAne vine? Tin Seuendagao bpp el eel each AWN gw Bae) EGO SHY LODey

RSS

Page Image
Finance Committee - Agenda - 3/15/2017 - P92

Finance Committee - Agenda - 3/15/2017 - P93

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
93
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

’ Ssilvigd
TIVA 49018 ALAYONOO

HAAN, LHe
* ZMHEGNWH MoH “WHEN
PO'BECE |SONIMWUC NOLLOMYLSNOOD TIVM 490d ALSYONOD,
Seaeernn sour, VAHSVN 40 ALID

102 BEBAROAO “vo

HESNVHNIALE “a Old
ONWINIVG “1 EM Loarowe
ONVINWO 1

fig a1 108

SHITWH fT -AgasaHoSaO
SH fF

avaH i NYO@NVS

FIO SR ONIEL
20 RANGE YT CSNTRIOS BL Od SUXLIOEN KY DeNcRDUDEN KL CONE Ot
“SOT 30 FRO OM BHA 0 HTT
DML AM CANGOOVLE Bd THE BEWNGD HenDs Bi MOOI BH “ET VNLLGED Ony
BAINORD TH GHewOrCiere EO URONOD 4 BRUNO? HINNOS ML TI OF

“ON
OL ONT CHORES BYTE od HOME SLFUNNOD 40 asuneD J: sims DIV T
WOU d SY ERNE KOR de ee Va
‘CAV MOHSUL DHL NBUIA QUT SURED BIL LVAE
‘See STA EL 38 SOA LOST Ev RIVA

HOUYDOT THM 9 LO Oad FM 40 RAT AAS OE
BID BAL eZ 10d RROD NIN Mmmy OHSU BA RACHA 1
“Sane SOMO Te
HONGML, BAL HHO Sorta ALIA BAL LVa
(Cty ODL SEMI HDWG Ad 20WA LOCH RY ALVAWOXE 7

Shei "ioe cosusees oe
Oaalaveata “s

SEIdAL IOAIDUNS ONLOG" DeMOTIOS HL
WO GUM fy WRG ALIHOD 40 FEW EVE BU Wd ODO AU Bd}

“onanoss HOUSAIPIOD

(aanri)

ONILOOY TIVM MOOTH GIAYONOD

PORE HONEEE TY HLA,

Bereers aOR) 20 RL ADS Leno very STON

io

“aloN

BARS Home | DHL Lites An emeve 1513 as
FAW) Oty Tangs Ba TI BNOLS OAMENYD “EEL em DEC UO ONY TIC ET SUI ENGAD Fy
Bad ML & RAWAL OL Dry DMV OR OL AVL EY DNC EDA THE SHAS RTD

sR

vas ob don (T1¥a "Os Ntsc) TMC bt tow

ONILOOd TIVK MOOTE ALGYONOO

Oh )

Page Image
Finance Committee - Agenda - 3/15/2017 - P93

Finance Committee - Agenda - 3/15/2017 - P94

By dnadmin on Mon, 11/07/2022 - 10:27
Document Date
Wed, 03/15/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/15/2017 - 00:00
Page Number
94
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031520…

Exhibit A: Scope of Work — Revised 2/14/2017

I. Prepare Preliminary Design Report for Primary Tank Upgrade

A.

Preliminary workshap. ENGINEER shall attend a preliminary workshop with
OWNER to review the work plan for the upgrade project, and solicit input on a
wide range of issues including chain and flight material, shaft layout, scum
handling and disposal options, and ancillary improvements. Brainstorm on
options, and identify the preferred alternatives for detailed evaluation.

Develop base plans and collect site data. ENGINEER shall develop base plans
for construction documents using existing record drawing information
supplemented by detailed field measurements. This will primarily focus on the
depth and dimensions of the scum well and scum piping. Assume 1 day of field
measurements by ENGINEER with 2-person team.

Prepare and Issue Technical Memorandum (TM)

1. Evaluate design requirements for upgraded chain and flight mechanism
including material options: conventional plastic molded, fiberglass loop
and stainless steel chain. Evaluate options for relocation of drive and
return shafts. Arrange and attend 1 day of field trips with OWNER staff to
other New England WWTFs to see rectangular mechanisms and inspect
chain material options. ENGINEER shall develop draft TM for OWNER
input.

2. Evaluate requirements for new sludge withdrawal system using automated
valves for basins 3, 4, 5 including piping modifications in the Primary
Gallery, sludge well modifications and control system for automated
valves. ENGINEER shall develop draft TM for OWNER input.

3. Evaluate options for new access hatches over sludge wells. ENGINEER
shall develop draft TM for OWNER input.
4, Assess condition of primary pumps with manufacturer’s representative

and determine rehabilitation and/or replacement requirements.
ENGINEER shall develop draft TM for OWNER input.

5. Inspect the odor control fans with manufacturer’s representative and
determine rehabilitation requirements. Inspect grease/mist eliminator, fan
enclosure and carbon vessel with manufacturer’s representative and access
upgrade needs. ENGINEER shall develop draft TM for OWNER input.
Access need for and requirements for winter operation and possible
enclosure of odor control system.

Page Image
Finance Committee - Agenda - 3/15/2017 - P94

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2631
  • Page 2632
  • Page 2633
  • Page 2634
  • Current page 2635
  • Page 2636
  • Page 2637
  • Page 2638
  • Page 2639
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact