Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 23731 - 23740 of 38765

Finance Committee - Agenda - 6/7/2017 - P346

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
346
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 3 of 3

QUALIFICATIONS:

All work is based on normal working hours 7:00 am — 3:30 pm Monday through
Friday

All areas (including roof) to be inspected prior to work commencing to verify
existing conditions, damage, etc.

EXCLUSIONS:

Jobsite office trailer & furnishings

Jobsite storage trailer

Temporary utilities

Temporary HVAC / controls

Temp / portable toilet

Repairs or upgrades to existing building systems other than what is called out for
on the plans and/or stated above

Environmental issues / removal

Premium time and/or overtime

Any / all items not specifically stated above to be included

TOTAL LUMP SUM PROPOSAL AMOUNT §$ 566,717.00
(Five Hundred Sixty Six Thousand Seven Hundred Seventeen Dollars)

THIS PROPOSAL IS SUBJECT TO VERBAL QUALIFICATION FOR
SCOPE OF WORK CLARIFICATION PURPOSES

Respectfully Submitted,

Dan Callahan
Dan Callahan — Vice President
Monadnock Commercial Building Co.

Page Image
Finance Committee - Agenda - 6/7/2017 - P346

Finance Committee - Agenda - 6/7/2017 - P347

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
347
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

COMMERCIAL

Building Co.

Serving the Commercial and Retail Industry

32 FITZGERALD DRIVE, UNIT #10 JAFFREY, NEW HAMPSHIRE 03452
PH. 603-878-0810 FAX 603-878-0809

ADDITIONAL WORK
LUMP SUM PROPOSAL 2

May 5, 2017 Page 1 of 3

City of Nashua

Central Purchasing

229 Main Street

Nashua, New Hampshire 03060

RE: Nashua Wastewater Treatment Facility HVAC Upgrades
2 Sawmill Road
Nashua, N.H. 03060

Attached please find the Additional Work Lump Sum Proposal for the above referenced
project in accordance with plans by Wright Pierce Engineers dated “Issued For Bid
3/17", Addenda 1&2, our site visits (3), subsequent conversations with the City of
Nashua Engineer Bill Keating and Bid Breakdown documentation and discussions with
Wright-Pierce Lead Project Engineer Andy Morrill. Should you have any questions, or
need further clarification, please feel free to contact me at your earliest convenience.

Page Image
Finance Committee - Agenda - 6/7/2017 - P347

Finance Committee - Agenda - 6/7/2017 - P348

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
348
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 2 of 3

General Conditions

Payment & Performance Bonding

Daily offloading, clean up & dumpsters for daily debris
Equipment and tooling & misc.

Project Management & Daily Supervision

Submittals

Project close out documentation

General Construction
e Modify existing louver openings to accommodate new louvers in the exterior brick
walls in the Grit Building

Electrical

e Demo & new power wiring and conduit per plans and specs

HVAC

e Demo existing duct, exhaust units & associated appurtenances
e Fumish & install new equipment, controls / conduit & wiring and start up,
test & balance

QUALIFICATIONS:
e All work to be scheduled and completed with work contained in proposals
previously submitted
e All work is based on normal working hours 7:00 am — 3:30 pm Monday through
Friday
e All areas to be inspected prior to work commencing to verify existing
conditions, damage, etc.

Page Image
Finance Committee - Agenda - 6/7/2017 - P348

Finance Committee - Agenda - 6/7/2017 - P349

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
349
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 3 of 3

EXCLUSIONS:

Jobsite office trailer & furnishings

Jobsite storage trailer

Temporary utilities

Temporary HVAC / controls

Temp / portable toilet

Repairs or upgrades to existing building systems other than what is called out for
on the plans and/or stated above

Environmental issues / removal

Premium time and/or overtime

Any / all items not specifically stated above to be included

ITEM #1: ($ 73,718.00)

Complete all work associated with the Grit Building

TOTAL LUMP SUM PROPOSAL AMOUNT § 73,718.00
(Seventy Three Thousand Seven Hundred Eighteen Dollars)

THIS PROPOSAL IS SUBJECT TO VERBAL QUALIFICATION FOR
SCOPE OF WORK CLARIFICATION PURPOSES

Respectfully Submitted,

Dan Callahan
Dan Callahan — Vice President
Monadnock Commercial Building Co.

Page Image
Finance Committee - Agenda - 6/7/2017 - P349

Finance Committee - Agenda - 6/7/2017 - P350

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
350
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Monadnock

COMMERCIAL

Building Co.

Serving the Commercial and Retail Industry

32 FITZGERALD DRIVE, UNIT #10 JAFFREY, NEW HAMPSHIRE 03452
PH. 603-878-0810 FAX 603-878-0809

ADDITIONAL WORK
LUMP SUM PROPOSAL #3

May 5, 2017 Page 1 of 3

City of Nashua

Central Purchasing

229 Main Street

Nashua, New Hampshire 03060

RE: Nashua Wastewater Treatment Facility HVAC Upgrades
2 Sawmill Road
Nashua, N.H. 03060

Attached please find the Additional Work Lump Sum Proposal for the above referenced
project in accordance with plans by Wright Pierce Engineers dated “Issued For Bid
3/17”, Addenda 1&2, our site visits (3), subsequent conversations with the City of
Nashua Engineer Bill Keating and Bid Breakdown documentation and discussions with
Wright-Pierce Lead Project Engineer Andy Morrill. Should you have any questions, or
need further clarification, please feel free to contact me at your earliest convenience.

Page Image
Finance Committee - Agenda - 6/7/2017 - P350

Finance Committee - Agenda - 6/7/2017 - P351

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
351
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 2 of 3

General Conditions

Payment & Performance Bonding

Daily offloading, clean up & dumpsters for daily debris
Equipment, tooling, dust barriers & misc.

Project Management & Daily Supervision

Submittals

Project close out documentation

eneral Construction

e Remove existing suspended metal panel ceilings, suspension system and lighting in
designated areas & dispose of

e Furnish & install new 2’ x 2’ suspended acoustical ceiling system per plans &
specs

e Cut & patch roof as needed

e Fumish & install steel @ new roof penetration

Roofing

Cut new opening in roof deck

Patch deck as needed

Roof protection

Furnish & install wood nailers

Flash curb and pocket into existing rubber roof

lectric
e Demo & new power wiring, conduit and lighting per plans and specs

HVAC

e Demo existing duct, air handler units & associated appurtenances

e Fumish & install new equipment, temperature controls / conduit & wiring,
test & balance and hoisting / rigging

QUALIFICATIONS:
e All work to be scheduled and completed with RTU #1 & #2
e All work is based on normal working hours 7:00 am — 3:30 pm Monday through
Friday
e Ajl areas (including roof) to be inspected prior to work commencing to verify
existing conditions, damage, etc.

Page Image
Finance Committee - Agenda - 6/7/2017 - P351

Finance Committee - Agenda - 6/7/2017 - P352

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
352
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 3 of 3

EXCLUSIONS:
e Jobsite office trailer & furnishings
Jobsite storage trailer
Temporary utilities
Temporary HVAC / controls
Temp / portable toilet
Repairs or upgrades to existing building systems other than what is called out for
on the plans and/or stated above
Environmental issues / removal
Premium time and/or overtime
e Any/ all items not specifically stated above to be included

ITEM #1: (3 43,253.00)
e Complete all work associated with RTU #3

ITEM #2: ($ 35,199.00)
e Complete all work associated with the Sludge Processing Area

ITEM #3: ($ 22,273.00)
e Complete all work associated with the Split System in the Electrical Room

TOTAL LUMP SUM PROPOSAL AMOUNT § 100,725.00
(One Hundred Thousand Seven Hundred Twenty Five Dollars)

THIS PROPOSAL IS SUBJECT TO VERBAL QUALIFICATION FOR
SCOPE OF WORK CLARIFICATION PURPOSES

Respectfully Submitted,

Dan Callahan
Dan Callahan — Vice President
Monadnock Commercial Building Co.

Page Image
Finance Committee - Agenda - 6/7/2017 - P352

Finance Committee - Agenda - 6/7/2017 - P353

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
353
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

COMMERCIAL

Building Co.

Serving the Commercial and Retail Industry

32 FITZGERALD DRIVE, UNIT #10 JAFFREY, NEW HAMPSHIRE 03452
PH. 603-878-0810 FAX 603-878-0809

ADDITIONAL WORK
LUMP SUM PROPOSAL # &

May 10, 2017 Page 1 of 3

City of Nashua

Central Purchasing

229 Main Street

Nashua, New Hampshire 03060

RE: Nashua Wastewater Treatment Facility HVAC Upgrades
2 Sawmill Road
Nashua, N.H. 03060

Attached please find the Additional Work Lump Sum Proposal for the above referenced
project in accordance with plans by Wright Pierce Engineers dated “Issued For Bid
3/17”, Addenda 1&2, our site visits (3), subsequent conversations with the City of
Nashua Engineer Bill Keating and Bid Breakdown documentation and discussions with
Wright-Pierce Lead Project Engineer Andy Morrill. Should you have any questions, or
need further clarification, please feel free to contact me at your earliest convenience.

Page Image
Finance Committee - Agenda - 6/7/2017 - P353

Finance Committee - Agenda - 6/7/2017 - P354

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
354
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 2 of 3

G LConditi

Payment & Performance Bonding

Daily offloading, clean up & dumpsters for daily debris
Equipment, tooling, dust barriers & misc.

Project Management & Daily Supervision

Submittals

Project close out documentation

truction
Remove existing suspended metal panel ceilings, suspension system and lighting in
designated areas & dispose of
Furnish & install new 2’ x 2’ suspended acoustical ceiling system per plans &
specs
Cut & patch roof as needed
Furnish & install support frame for CMUA-1 (Make Up Air Unit)

Roofing

Cut new opening in roof deck

e Patch deck as needed

e Roof protection

e Furmish & install wood nailers

e Flash curb and pocket into existing rubber roof
Electrical

Demo & new power wiring, conduit and lighting per plans and specs

HVAC

Demo existing duct, air handler units & associated appurtenances
Furnish & install new equipment, temperature controls / conduit & wiring,
test & balance and hoisting / rigging

QUALIFICATIONS:

All work to be scheduled and completed with RTU #1 & #2

All work is based on normal working hours 7:00 am — 3:30 pm Monday through
Friday

All areas (including roof) to be inspected prior to work commencing to verify
existing conditions, damage, etc.

Page Image
Finance Committee - Agenda - 6/7/2017 - P354

Finance Committee - Agenda - 6/7/2017 - P355

By dnadmin on Mon, 11/07/2022 - 10:23
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
355
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

Page 3 of 3

EXCLUSIONS:
e Site work, underground utilities & concrete pad for CMUA-1

Jobsite office trailer & fiumishings
Jobsite storage trailer
Temporary utilities
Temporary HVAC / controls
Temp / portable toilet
Repairs or upgrades to existing building systems other than what is called out for
on the plans and/or stated above
Environmental issues / removal
e Premium time and/or overtime

Any / all items not specifically stated above to be included

ITEM A: ($51,998.00)
e Complete all work associated with Control Building Boiler Room Make Up
Air Unit

ITEM C: ($ 74,390.00)
e Complete all work associated with the Control Building Offices Ductless Split
Systems

ITEM D: (3 29,408.00)
e Complete all work associated with the Replacement of Ceilings & Lighting in
the Control Building Lobby Area, Kitchenette/Lunch Room and Hallway

TOTAL LUMP SUM PROPOSAL AMOUNT $ 155,796.00
(One Hundred Fifty Five Thousand Seven Hundred Ninety Six Dollars)

THIS PROPOSAL IS SUBJECT TO VERBAL QUALIFICATION FOR
SCOPE OF WORK CLARIFICATION PURPOSES

Respectfully Submitted,

Dan Callahan
Dan Callahan — Vice President
Monadnock Commercial Building Co.

Page Image
Finance Committee - Agenda - 6/7/2017 - P355

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2370
  • Page 2371
  • Page 2372
  • Page 2373
  • Current page 2374
  • Page 2375
  • Page 2376
  • Page 2377
  • Page 2378
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact