20181221 2019 GCCS Services Scope.docx
Sanborn Head will provide two (2) paper copies of the above-listed documents to the City
and assumes that the City will prepare and submit the Type I] Permit Modification
Application to the New Hampshire Department of Environmental Services (NHDES}. Once
the project is approved by NHDES, Sanborn Head will be responsible for the following:
w Attending a pre-bid meeting at the Four Hills Landfill to review the project with potential
bidders;
a Providing responses to requests for information (RFIs) from potential bidders regarding
design intent, materials, and material testing; and
a Preparing addenda, if required.
Sanbom Head assumes that bid results will be tabulated by the City.
Task 2 - Construction Phase Services
Under this task, Sanborn Head will perform construction-phase engineering services in
support of the installation of the GCCS components depicted on the construction drawings
and technical specifications approved by NHDES. This effort will include:
s Preparing for and attending a pre-construction meeting at the Four Hills Landfill to
review the project and proposed construction timeline with the selected contractor. We
assume that the City will prepare the agenda and meeting minutes for this meeting.
s Reviewing contractor submittals for conformance with the specifications for the project.
x Providing proposed pipe alignments to the contractor for stake-out in the field by the
Contractor’s surveyor.
e Updating the well schedule for the project based on ground surface elevations recorded
by the contractor's surveyor at the time of construction.
x Performing limited construction observation services to document the installation of
‘critical GCCS components for conformance with the drawings and_ technical
specifications approved by the NHDES. We assume two site visits per week, with each
visit averaging about 4 hours, and a 6-week duration for the project (12 site visits total).
While on site, Sanborn Head’s representative will meet with representatives of the City
and the contractor, observe construction (including material testing performed by the
contractor), take photographs, and document the observations. We understand that a
representative of the City will observe construction activities and material testing when
Sanborn Head is not on site.
= Preparing bi-weekly construction summaries for the NHDES, Based on a projected 6-
week duration of construction, we anticipate preparing no more than three (3) bi-weekly
reports,
s Performing a final site walk-thru with the City to evaluate the completeness of the
contractor’s work and conformance with the construction documents, and if necessary,
generating a punch-list of items to be completed by the contractor prior to Sanborn Head
signing off on substantial completion of the project.