Finance Committee - Agenda - 3/6/2019 - P860
D. Where the Owner is paying directly for Uniformed Officers, the Contractor shall be
responsible for payment of the wages paid to the Uniformed Police Officers if the Contractor
fails to cancel the services of the Uniformed Officers in accordance with 2.01.B and
2.01.C above.
PART 3 - EXECUTION
3.01 OPERATION:
A. Contractor shall provide barricades, barrier fences, traffic signs, and other traffic control
devices as shown on the plans, required by the City’s Traffic Department, or as directed by
the Engineer, to protect traffic, pedestrians, and animals from the work area.
B. Contractor shall relocate barricades, signs and other devices as necessary as the work
progresses as directed by the Owner’s Traffic Control Officer or the Engineer.
C. _ Flaggers shall be provided with the necessary safety equipment.
END OF SECTION
2019 Sewer Replacement Project Flaggers and Uniformed Officers for Traffic Control
Nashua, NH 02451-2
